BRYAN CONSTRUCTION, INC. | B= | C | 11/20/2018 | Bldg final - interior remodel of 3rd floor OK / Verified smoke seals, door ratings and exiting throughout work area. / Bristol Taproom (2nd floor) has been removed from scope of work by contractor through plan update dated 10.12.18. / United offices inspected and approved for final on 8.30.18. | CHUCK | CHUCK | | B= | C | 6030677 |
BRYAN CONSTRUCTION, INC. | BSP | T | 10/12/2018 | PAID (REC#1547832) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY Removed resurant on second floor from this scope. | SHELBY | SHELBY | | BSP | T | 5993290 |
BRYAN CONSTRUCTION, INC. | BFR | P | 09/10/2018 | Fire stop at penetrations per listing at main floor wall between corridor and restaurant all penetrations existing at this wall new drywall only | NATHAN | NATHAN | | BFR | P | 5960555 |
BRYAN CONSTRUCTION, INC. | BFR | C | 09/07/2018 | penetrations at drywall repairs corrected main level | NATHAN | NATHAN | | BFR | C | 5966429 |
BRYAN CONSTRUCTION, INC. | B= | P | 08/31/2018 | 3rd floor office areas okay with completed required inspections, items corrected. rated assemblies verified marking, 2nd floor drywall attachment at corridor wall okay penetrations remaining. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BERWICK ELECTRIC CO Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5953334 |
BRYAN CONSTRUCTION, INC. | B= | P | 08/30/2018 | UNITED AIRLINES OFFICES ONLY, with completed required inspections in 2nd floor United Airlines offices and revised door locations at file room remodel B= okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BERWICK ELECTRIC CO Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5951844 |
BRYAN CONSTRUCTION, INC. | BFR | P | 08/30/2018 | discussed rated assemblies at 3rd floor rated ceiling and walls, need penetrations sealed at all complete all required inspections, frame okay / address walls at 2nd floor attach drywall per type A listed wall and penetrations need sealed. | NATHAN | NATHAN | | BFR | P | 5951831 |
BRYAN CONSTRUCTION, INC. | BFR | R | 08/10/2018 | Spoke with Mark B mechanical inspector, he is addressing all damper framing issues with design team, building will need to see all drywall installation and attachment on rated walls designated as type A walls on plan U465 | NATHAN | NATHAN | | BFR | R | 5930000 |
BRYAN CONSTRUCTION, INC. | BFR | P | 07/16/2018 | walk third floor for rated wall and damper issues, all framing existing at walls and soffits, only drywall removed, rated wall inspection needed when ready, plans to be reviewed for further issues and coordination with mechanical inspector comments to follow. | NATHAN | NATHAN | | BFR | P | 5904224 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 10/31/2018 | FIRE ALARM INSPECTION: plans revised | MATTHEW | MATTHEW | | E= | C | 6011402 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 10/31/2018 | plans revised | MATTHEW | MATTHEW | | E= | C | 6011400 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 10/15/2018 | need building and fire alarm plans revised to show eliminating bristals and nova coffee from scope of work on this permit----- | TIMA | TIMA | | E= | P | 5994430 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | EP | C | 10/15/2018 | 3 panel interior replacements 1- 600 amp 1-400 amp and 1- 200 amp ok ----wiring existing -- | TIMA | TIMA | | EP | C | 5994424 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 09/04/2018 | UNITED LEASES OFFICES---OK | BRIAN | BRIAN | | E= | P | 5953696 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 09/04/2018 | 3rd floor corrections made-------2nd floor united leased offices--ceilings and final--ok | BRIAN | BRIAN | | E= | P | 5953693 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 08/30/2018 | 3rd floor disposal gfci not working--- | TIMA | TIMA | | E= | P | 5950714 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 08/29/2018 | 3rd floor ---need gfci for water coolers and fridge readily accessible,need gfci protection for disposal ------rest of 3rd floor ok--- | TIMA | TIMA | | E= | P | 5949351 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/29/2018 | fire alarm complete 3rd floor | TIMA | TIMA | | ER | P | 5949350 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/29/2018 | 3rd floor ceilings complete and marked on sheet e3.2--------INFORMED CONTRACTOR THAT BUILDING INSPECTOR STILL NEEDED TO DO FIRE RATING CEILING INSPECTION I ALSO NOTIFIED NATHAN BUILDING INSPECTOR | TIMA | TIMA | | ER | P | 5949341 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/28/2018 | FIRE ALARM INSPECTION: 3RD FLOOR WALL --SEE PLANS--OK | BRIAN | BRIAN | | ER | P | 5947586 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 08/28/2018 | FIRE ALARM INSPECTION: UNITED OFFICES AND HALL----OK SEE PLANS | BRIAN | BRIAN | | E= | P | 5947581 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 08/28/2018 | UNITED OFFICES --SEE PLANS--- | BRIAN | BRIAN | | E= | P | 5947574 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/28/2018 | WALL 3RD FLOOR --SEE PLANS-- | BRIAN | BRIAN | | ER | P | 5947571 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/21/2018 | FIRE ALARM INSPECTION: new cable to devices on 3rd floor ok---fplp cable | TIMA | TIMA | | ER | P | 5940637 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/21/2018 | ceilings marked on sheet e3.2 ok | TIMA | TIMA | | ER | P | 5940630 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/15/2018 | FIRE ALARM INSPECTION: ALL FIRE ALARM CABLING IS EXISTING ON 3RD FLOOR ONLY NEW DEVICES AND BOXES IN WALLS AND CEILINGS--- | TIMA | TIMA | | ER | P | 5934698 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/15/2018 | ceilings marked on sheets e1.2 and e3.2 ok ------NEED NEW LOAD CALCULATION ADDED TO PLANS FOR NEW 40 AMP INSTA HOT FED FROM PANEL AT06 BY FINAL---- | TIMA | TIMA | | ER | P | 5934693 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/09/2018 | walls marked on sheet e3.1 ok | TIMA | TIMA | | ER | P | 5928740 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/03/2018 | drop ceilings marked on sheet e2.2 ALSO NO NEW FIRE ALARM CABLE IN THIS AREA DEVICES ONLY PER CONTRACTOR---
pre-rock fire lid ceiling on sheet e3.2 ok will need access panels for j-boxes above and need inspection of fire blankets on bathrooms-- | TIMA | TIMA | | ER | P | 5923118 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/19/2018 | walls marked on sheet E3.1 ok | TIMA | TIMA | | ER | P | 5907695 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/19/2018 | FIRE ALARM INSPECTION: walls marked on sheet E3.1 ok | TIMA | TIMA | | ER | P | 5907694 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/11/2018 | walls marked on sheet E3.1 ok located at general contractor office------INFORMED CONTRACTOR OF ANSI REQUIREMENTS FOR NEW PARTS OF INSTALL-- | TIMA | TIMA | | ER | P | 5898980 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 06/22/2018 | Areas noted for ER by Tim on 6/22 have no FA devices. Ok to rock once framing inspected and have the ok by building inspector | DEAN | DEAN | | ER | P | 5883026 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 06/22/2018 | electric for walls rooms 202-209 and 212-----NOTE FIRE ALARM NOT INSTALLED-DO NOT DRYWALL UNTIL ROUGH IN IS COMPLETE-- | TIMA | TIMA | | ER | P | 5882826 |
PIPE LINE SPECIALTIES INC. | H= | C | 10/30/2018 | SECOND FLOOR - TEST AND BALANCE RECEIVED | MARKB | MARKB | | H= | C | 6009778 |
PIPE LINE SPECIALTIES INC. | H= | P | 10/30/2018 | FINAL PENDING - Provide Test And Balance report for second floor. THIRD FLOOR - FINAL COMPLETE. | MARKB | MARKB | | H= | P | 6009722 |
PIPE LINE SPECIALTIES INC. | H= | P | 10/26/2018 | no access at this tome for conference room #311 to verify labeling of fire damper (attach photos to permit and recall for inspection). RESTAURANT MECHANICAL WORK REMOVED FROM SCOPE OF WORK PER SPLICE pg.73. note: 3rd floor fire damper labels to all other locations ok. | PAULO | PAULO | | H= | P | 6007115 |
PIPE LINE SPECIALTIES INC. | HD | P | 10/08/2018 | Wrong permit called in - inspection to be entered under permit #L75662 | MARKB | MARKB | | HD | P | 5988610 |
PIPE LINE SPECIALTIES INC. | HSP | P | 09/18/2018 | THIRD FLOOR - TEST AND BALANCE RECEIVED | MARKB | MARKB | | HSP | P | 5968192 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/21/2018 | 3RD FLOOR: 3RD FLOOR FINAL PENDING - Label all damper access doors and grid , plan splice from 8/17/18 being scanned into system and provide Test And Balance Report. ABOVE CEILING DUCT - SUPPLY/RETURN, MAINS/BRANCHES, FLEX/DIFFUSERS INSTALLED PER PLAN SPLICE PROVIDED ON SITE OK TO COVER. | MARKB | MARKB | | HD | P | 5940509 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/20/2018 | 2ND FLOOR: ABOVE CEILING DUCT - PLAN PAGE M2.2 DUCT/FLEX/DIFFUSER REPLACEMENT PER SPLICE COMPLETE. ALL DIFFUSERS INSTALLED OK TO COVER. STILL NEED: Restaurant areas of second floor. | MARKB | MARKB | | HD | P | 5939421 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/10/2018 | 3RD FLOOR: DAMPER INSPECTION - HORIZONTAL MOUNT FIRE DAMPERS FOR ROOM # 311 - 316 INCLUDING BATHROOM EXHAUST SUPPORTED PER ENGINEER DRAWING AND MANUFACTURERS SUPPLEMENT OK TO COVER. Still Need plan splice per previous notes. | MARKB | MARKB | | HD | P | 5931011 |
PIPE LINE SPECIALTIES INC. | HSP | P | 08/09/2018 | 3RD FLOOR: CRD INSPECTION FOR BATHROOMS - NEED TO GO OVER CRD INSTRUCTIONS WITH SENIOR MECHANICAL INSPECTOR - MORE NOTES TO FOLLOW IN THE MORNING. Note Added 8/10/18: Dampers need to be supported per figure #1(grid system) of install instructions. Will need dampers shown on plans and letter from engineer verifying dampers will protect ceiling in the event of a fire and exhaust fans running. | MARKB | MARKB | | HSP | P | 5929043 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/19/2018 | 3RD FLOOR: ----PLAN SPLICE REQUIRED---Contractor replaced duct with same sizes duct but plan does not reflect those sizes. Rooms # 311 - 316 show a rated ceiling, plans only show fire and smoke dampers on most return grills but nothing for supply grills or bathroom exhaust. Corridor dampers will need to meet 2015 IMC 607.3.1, 607.3.2.4 and 607.3.3.5. ----ENGINEER DETAIL REQUIRED----Will need an engineer detail for horizontal damper support in rated ceiling. No ceiling or dampers installed at this time. ABOVE CEILING DUCT - VERTICAL DAMPERS OK FOR ANULAR SPACE AND ANGLES except for damper over double doors. SUPPLY/RETURNS/REPLACED VAV'S OK FOR SEALING AND SUPPORT BUT DO NOT MATCH PLANS. No flex or diffusers. | MARKB | MARKB | | HD | P | 5908100 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/13/2018 | 3 RD FLOOR DAMPER FRAMING: STILL NEED - Engineer letter stating that each damper detail meets the intent of the damper manufactures install instruction for support. Need damper support detail for damper framing over double doors room 308. FRAMING EITHER MEETS MANUFACTURER INSTRUCTIONS OR ENGINEER DETAIL FOR - 2 DAMPERS IN SOFFIT OF ROOM 308, WOMEN BATHROOM 312, OFFICE 316, ABOVE SINGLE DOOR IN HALL AND 3 AT COFFEE BAR CORRIDOR WALL | MARKB | MARKB | | HD | P | 5902204 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/13/2018 | Damper framing detail | MARKB | MARKB | | HD | P | 5901603 |
PIPE LINE SPECIALTIES INC. | HSP | P | 06/28/2018 | 3RD FLOOR: New dampers do not meet manufacturers installation instructions - King studs do not terminate at floor. See general note #1 on M2.3 regarding damper installations must be approved for all assemblies. Engineer to provide detailed stamped drawing for new damper framing or stamped letter approving existing framing. Engineer will also need to include on drawing or letter that framing meets damper manufacturers intent. | MARKB | MARKB | | HSP | P | 5888146 |
PIPE LINE SPECIALTIES INC. | HSP | P | 06/27/2018 | 3RD FLOOR: ON SITE DAMPER CONSULT WITH DAVID G. (SUPERINTENDENT), BILL S. (PLS) AND AIRPORT ORATIONS ABOUT INSTALLING NEW DAMPERS IN EXISTING DAMPER LOCATIONS. FURTHER RESEARCH REQUIRED ON WALL LISTINGS AND DAMPER SUPPORT - SOME LOCATIONS DO NOT MEET DAMPER SUPPORT INSTRUCTIONS (MORE NOTES TO FOLLOW IN THE MORNING). DISCUSSED HOW OTHER LOCATIONS CAN BE RE FRAMED TO MEET DAMPER INSTRUCTIONS. DISCUSSED ONE SIDED ANGLES VERSE TWO SIDED ANGLE REQUIREMENTS. | MARKB | MARKB | | HSP | P | 5887108 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/15/2018 | ----PLAN SPLICE REQUIRED---- Need an electrical contractor attached to permit. GREASE DUCT WRAP - STILL NEED: Complete grease wrap banding in 3rd floor penthouse, need new and existing access panels wrap and remove all combustible material out of hood wall. Existing Type 1 grease fan on roof and existing duct use to serve 2 Type 1 hoods. Will need engineer to address with a plan splice showing 1 type 1 hood being removed and addressing existing fan with new CFM ratings for hood left in operation with an air balance table for changed exhaust rate and makeup air. | MARKB | MARKB | | HD | P | 5875954 |
PIPE LINE SPECIALTIES INC. | HSP | P | 06/12/2018 | ADDED NOTE FOR CONTRACTOR AFTER PHONE DISCUSSION WITH SHARON FROM PIPE LINE SPECIALTIES. NOTE 3 ON PLANS STATES TO REPLACE ALL GREASE WRAP 2 LAYER SYSTEM FROM HOOD TO THE GREASE FAN LOCATION. THIS NOTE ALSO GAVE THE OPTION TO ONLY REPLACE THE WRAP TO A POINT WHERE EXISTING WRAP IS NOT DAMAGED. THE CONCERN WITH THAT IS MOST GREASE WRAP MANUFACTURER'S DO NOT STATE IN THEIR INSTRUCTIONS HOW TO SPLICE THEIR UL TESTED SYSTEM TO ANOTHER UL TESTED BRAND OF GREASE DUCT WRAP. IF NOT REPLACING THE GREASE WRAP IN ITS ENTIRETY AS STATED IN NOTE 3, THE ENGINEER WILL NEED TO ADDRESS THIS WITH A STAMPED DESIGN AND PROCEDURE FOR ATTACHING DISSIMILAR BRANDS WHEN NOT TO THE INSTRUCTIONS. NOT USING A COMPLETE TESTED SYSTEM BY MANUFACTURER WOULD VOID THE UL LISTING FROM THE MANUFACTURER. | JON | JON | | HSP | P | 5871564 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/11/2018 | LIGHT CHECKED 1 END CAP ON EXISTING DUCT. OK TO WRAP AND PER NOTE 3 ON PLANS. DID NOT SEE DEMO PLANS OR NOTES THAT REFERENCED ANY DEMOLITION REMOVAL OF GREASE DUCT. HOOD WALL IS EXPOSE AND HAS NEW PAPER BACKED PIPE INSULATION INSIDE WALL AND NEEDS REMOVED DUE TO NO COMBUSTIBLE MATERIAL INSIDE HOOD WALL ALLOWED. DISCUSSED FIRE SMOKE DAMPER REPLACEMENT TO HAVE ALL INSTRUCTIONS AND CALL INSPECTION FOR FRAMING BEFORE SHEET ROCK FOR DAMPER FRAMING. | JON | JON | | HD | P | 5870542 |
PIPE LINE SPECIALTIES INC. | P= | C | 08/27/2018 | ok for corrections on 2nd floor Note: All 3rd floor water connected appliances, future use only. | JOHNS | JOHNS | | P= | C | 5946591 |
PIPE LINE SPECIALTIES INC. | P= | P | 08/20/2018 | no hot water, bfp for future coffee maker, rest ok for 2nd floor sink only | JOHNS | JOHNS | | P= | P | 5939172 |
PIPE LINE SPECIALTIES INC. | PTO | C | 07/12/2018 | ok for test and design, need to add to scope of work (1) drinking fountain, a total of (3)water connected appliances, and (2) insta hot water htrs, by final red line plans to show new locations of 3 wall mount water boxes and 2 insta hot water htrs. note: vtr (existing), check bfp @ coffee maker if applicable by final, check above reqs @ final | JOHNS | JOHNS | | PTO | C | 5900457 |
BRYAN CONSTRUCTION, INC. | XBS | P | 10/12/2018 | PLAN SPLICE: (No Fee) by: DANM for Construction: Remove scope of work from 2nd floor | DANM | DANM | | XBS | P | 5993265 |
PIPE LINE SPECIALTIES INC. | XMS | P | 10/12/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised to remove mechanical scope of work indicated on sheet M2.1 | JUSTINC | JUSTINC | | XMS | P | 5993241 |
BRYAN CONSTRUCTION, INC. | XBS | T | 08/20/2018 | PAID (REC#1528697) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: All doors to match note. Floor plan revisions on 2nd floor. | SHELLEY | SHELLEY | | XBS | T | 5938836 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 08/17/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised plans to show new lighting in "no work" area. | BERTHA | BERTHA | | XES | P | 5937586 |
PIPE LINE SPECIALTIES INC. | XMS | T | 08/17/2018 | PAID (REC#1528319): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 4 | DALEH | DALEH | | XMS | T | 5937377 |
BRYAN CONSTRUCTION, INC. | XBS | T | 08/14/2018 | PAID (REC#1528697) PLAN SPLICE FEE: $50 by: DANM for Construction: Fire damper details as requested by Mechanical inspector | DANM | DANM | | XBS | T | 5933099 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | T | 06/29/2018 | PAID (REC#1512211) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised for as-built conditions. | BERTHA | BERTHA | | XES | T | 5890192 |
PIPE LINE SPECIALTIES INC. | XMS | P | 06/25/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised for as-built conditions | JUSTINC | JUSTINC | | XMS | P | 5884518 |