COLORADO STRUCTURES INC | B= | C | 07/12/2019 | | NICK | NICK | | B= | C | 6262274 |
COLORADO STRUCTURES INC | B= | P | 04/03/2019 | Need mud and tape for north shaft wall on 3rd floor / Need to complete all roofing for addition / Need to complete all siding / All other aspects of final OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), GDS ELECTRIC Electrical Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 6153936 |
COLORADO STRUCTURES INC | BIN | C | 04/03/2019 | | NICK | NICK | | BIN | C | 6153935 |
COLORADO STRUCTURES INC | BFR | C | 04/03/2019 | | NICK | NICK | | BFR | C | 6153934 |
COLORADO STRUCTURES INC | BSP | P | 02/25/2019 | 5/8 type X American rock OK per V455 for mechanical shafts 3rd and 2nd floor | NICK | NICK | | BSP | P | 6116301 |
COLORADO STRUCTURES INC | BSP | P | 02/14/2019 | penetrations at shaft walls all floors okay listings with superintendant, 3rd floor east not completed | NATHAN | NATHAN | | BSP | P | 6107245 |
COLORADO STRUCTURES INC | BFR | P | 02/12/2019 | Eng letter for all steel bolting and welding on file | NICK | NICK | | BFR | P | 6104210 |
COLORADO STRUCTURES INC | BSP | R | 02/07/2019 | Inspection for shaft for mechanical on 3rd and 2nd floor / Approved plans call for for U415 shaft wall system, listing calls for USG shaft walls, at time of inspection American shaft liner installed / Need to remove American shaft liner and install USG or splice plans for American shaft system / Need penetration listing for 4" pvc pipe in shaft system and inspection | NICK | NICK | | BSP | R | 6100768 |
COLORADO STRUCTURES INC | BLA | C | 02/07/2019 | | NICK | NICK | | BLA | C | 6100767 |
COLORADO STRUCTURES INC | BSP | P | 02/06/2019 | All mineral wool and fire caulk OK per head wall detail for stair tower lid and elevator lid | NICK | NICK | | BSP | P | 6099513 |
COLORADO STRUCTURES INC | BSP | P | 02/04/2019 | Exterior layer of 5/8 type X rock for elevator shaft per GA file NO WP 1206 / Head wall detail HW-D-0154 to be use for head wall at elevator shaft, need inspection for this once installed / | NICK | NICK | | BSP | P | 6096632 |
COLORADO STRUCTURES INC | BSP | P | 01/29/2019 | Inspection for rock and screw pattern for top of elevator shaft per GA file NO WP 1206 / Exterior side of 5/8 type X rock OK per listing / Need head wall detail for top of elevator shaft / Still need to inspect interior side of rock per listing | NICK | NICK | | BSP | P | 6091101 |
COLORADO STRUCTURES INC | BIN | P | 01/07/2019 | Rigid insulation at exterior south stair enclosure all 3 floors, mass wall R13 per IECC. | NATHAN | NATHAN | | BIN | P | 6070350 |
COLORADO STRUCTURES INC | BIN | P | 12/26/2018 | Thermal batts in new entry framing OK per plans / discussed remaining insulation inspections | RICHB | RICHB | | BIN | P | 6062240 |
COLORADO STRUCTURES INC | BFR | P | 12/13/2018 | All exterior steel stud framing OK for new entry / Still need to inspect new shaft framing at interior / Reviewed accessible elements | NICK | NICK | | BFR | P | 6051853 |
COLORADO STRUCTURES INC | BFN | C | 12/13/2018 | All Eng on file | NICK | NICK | | BFN | C | 6051852 |
COLORADO STRUCTURES INC | BFT | C | 12/13/2018 | All Eng on file | NICK | NICK | | BFT | C | 6051848 |
COLORADO STRUCTURES INC | BFN | P | 11/15/2018 | 3rd party observation report on file for footing/foundation | NICK | NICK | | BFN | P | 6026088 |
COLORADO STRUCTURES INC | BFN | R | 11/06/2018 | Need Eng stamp on observation report for approval from RBD / Please re upload observation with Eng stamp | NICK | NICK | | BFN | R | 6016662 |
COLORADO STRUCTURES INC | BFN | R | 10/24/2018 | Need compaction reports to have Eng stamp before acceptance from RBD / Please re upload letters with stamp | NICK | NICK | | BFN | R | 6004155 |
COLORADO STRUCTURES INC | BFN | P | 10/08/2018 | Soils/Open hole on file / #2500psf / Still need 3rd party observation reports for footing/foundation | NICK | NICK | | BFN | P | 5988176 |
COLORADO STRUCTURES INC | BFI | C | 10/05/2018 | R-10 at all foundation walls OK / Need all 3rd party observation reports for footing/foundation / Need open hole report / Gave OK to use 3rd party for CMU and structural steel / Reviewed rated walls for job | NICK | NICK | | BFI | C | 5987267 |
GDS ELECTRIC | E= | C | 04/18/2019 | | BRIAN | BRIAN | | E= | C | 6170167 |
GDS ELECTRIC | EUG | C | 04/08/2019 | 3/4" pvs for all landscaping lighting--ok | BRIAN | BRIAN | | EUG | C | 6158431 |
GDS ELECTRIC | E= | P | 04/01/2019 | label RTU'S permanently, all RTU disco's need bond bushing on line side sealtite, 3- 90 amp units, label AIC and date calculated on any panel over 10K, remove old exterior wiring thru wall for old outdoor lighting,--------------------------still need open/close signs, landscape lighting, | JOHNN | JOHNN | | E= | P | 6151260 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 03/15/2019 | FIRE ALARM INSPECTION: | MATTHEW | MATTHEW | | E= | C | 6134095 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | C | 03/15/2019 | FIRE ALARM INSPECTION: fire alarm for core and shell complete | MATTHEW | MATTHEW | | ER | C | 6134078 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 03/15/2019 | FIRE ALARM INSPECTION: fire alarm for core and shell complete | MATTHEW | MATTHEW | | E= | C | 6134079 |
GDS ELECTRIC | ER | P | 03/12/2019 | 1st , 2nd , 3rd floor lobby / entry hard lid and walls ok- | BRIAN | BRIAN | | ER | P | 6131329 |
GDS ELECTRIC | ER | P | 03/05/2019 | 5 can lights in the inside high entry --ok | BRIAN | BRIAN | | ER | P | 6124286 |
GDS ELECTRIC | ER | P | 01/28/2019 | exterior can lights in high soffits ok / | MIGUEL | MIGUEL | | ER | P | 6090308 |
GDS ELECTRIC | EP | P | 11/20/2018 | looked to the panels ---need common ground bar in the step down transformers----rest ok | BRIAN | BRIAN | | EP | P | 6030811 |
GDS ELECTRIC | ES | C | 11/20/2018 | Commercial Service: 1000 amp 480 volt---ok to set ct's and energize------------------- | BRIAN | BRIAN | | ES | C | 6030799 |
GDS ELECTRIC | EUG | R | 10/30/2018 | this is a csu inspection---- | BRIAN | BRIAN | | EUG | R | 6010090 |
GDS ELECTRIC | ESL | C | 10/30/2018 | main floor and feed to elevator pit--ok | BRIAN | BRIAN | | ESL | C | 6010080 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 07/09/2019 | ELEVATOR COMPLETE | ROBERTV | ROBERTV | | HE= | C | 6256767 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/18/2019 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6234417 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 04/15/2019 | PARTIAL PENDING TAB REPORT - ALL OTHER CORRECTIONS MADE | JERRYF | JERRYF | | H= | P | 6166163 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 04/10/2019 | CANNOT SECURE DAMPER TO WALLS ON BOTH SIDES OF WALL / 1 SIDE IS SECURED SIDES AND TOP AND OTHER SIDE OF WALL IS SECURED AT SIDES AND BOTTOM - STILL NEED AIR FILTER AT FCU 201 | JERRYF | JERRYF | | H= | P | 6161466 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 04/05/2019 | 1ST FLOOR ELEVATOR LOBBY ABOVE THE HARD LID : NEED ANGLES FOR THE TWO FIRE/ SMOKE DAMPERS PROPERLY FASTENED TO WALL AND PROPERLY FASTENED TO DAMPER SLEEVE PER THE INSTALLATION INSTRUCTION / MISSING ANGLE ON THE TOP OF THE 50 X 10 FIRE / SMOKE DAMPER . 2ND FLOOR ELEVATOR LOBBY : NEED PROPER ACCESS TO FC- 201 / MISSING FILTER. ((ROOF EQUIPMENT LABELING OK ))
| LIDO | LIDO | | H= | P | 6156623 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 04/02/2019 | NEED FIRE SMOKE DAMPER INSTALL MANUAL FOR ALL DAMPERS AT ELEVATOR LOBBIES - NEED DAMPERS PROPERLY RETAINED AT 1ST FLOOR ELEVATOR LOBBY - NEED DUCT ACCESS DOORS AT SAME - NEED PROPER ACCESS TO FCU AT 2ND FLOOR ELEVATOR LOBBY AND VERIFY AIR FILTER - TAG ALL ROOF EQUIPMENT WITH LABELS OR PAINT MARKER | JERRYF | JERRYF | | H= | P | 6152376 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 02/14/2019 | NO DAMPERS REQUIRED AT 2ND AND 3RD FLOOR | JERRYF | JERRYF | | HSP | P | 6106849 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 02/13/2019 | NEED FURTHER RESEARCH ON FIRE SMOKE DAMPERS - MORE NOTES TO FOLLOW ON 2/14 | JERRYF | JERRYF | | HSP | P | 6106250 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | H= | C | 02/04/2019 | ALL FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6096304 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | HC | C | 02/04/2019 | RELEASE METER | JERRYF | JERRYF | | HC | C | 6096303 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | HI | C | 02/04/2019 | PRESSURE TEST OK AND PIPING PER REVISED PLAN DATED 1/31/2019 - PAGE NUMBER 194 NOTES: PLANS HAVE BEEN REVISED DELETING 2# SYSTEM | JERRYF | JERRYF | | HI | C | 6096295 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/31/2019 | SA / RA MAIN DUCTS OK TO WRAP AT RTU 1 - AT FUTURE INSPECTION VERIFY PROPER DUCT / FIRE SMOKE DAMPER ACCESS DOORS AT SHAFTS | JERRYF | JERRYF | | HD | P | 6093470 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | HI | P | 12/12/2018 | NEED PLAN REVISION TO MATCH INSTALLED #2 GAS SYSTEM APPROVED BY PPRBD - NEED REGULATOR MANUAL TO VERIFY PROPER SIZING - NEED 2# APPROVAL LETTER FROM GAS PURVEYOR NOTES: PIPING AND PRESSURE TEST OK- CONTRACTOR PROCEEDING AT OWN RISK PER PREVIOUS NOTES | JERRYF | JERRYF | | HI | P | 6050920 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 12/11/2018 | LEFT MESSAGE FOR RON ENGLE AT RIAL AT 8:28 ON 12/11 - HOW ARE FIRE SMOKE DAMPERS BEING CONTROLLED | JERRYF | JERRYF | | HSP | P | 6048597 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/10/2018 | STOPPED INSPECTION - NEED FIRE SMOKE DAMPER INSTALL MANUAL TO VERIFY PROPER DAMPER / RETAINAGE AND MECHANICAL FASTENERS AT FLOOR - NEED FURTHER RESEARCH ON POSSIBLY NEEDING FIRE SMOKE DAMPERS AT 2ND FLOOR SHAFT DUCT | JERRYF | JERRYF | | HD | P | 6047784 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | P= | C | 04/01/2019 | letter for elevator pump to mop sink in images | JOSEPHD | JOSEPHD | | P= | C | 6150217 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | P= | P | 03/25/2019 | need engineer letter for draining elevator pump into mop sink, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6143536 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | PB | C | 10/19/2018 | Complete | SHANEN | SHANEN | | PB | C | 6000422 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | PB | P | 10/05/2018 | Need to complete drain to 2' outside of structure, under ground DWV from 4" stack downstream to 18" inside of foundation -test OK | SHANEN | SHANEN | | PB | P | 5987141 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | PTO | C | 10/05/2018 | Overhead water mains and future drains - test OK | SHANEN | SHANEN | | PTO | C | 5987131 |
COLORADO STRUCTURES INC | XBS | T | 02/12/2019 | PAID (REC#1575904): PLAN SPLICE FEE: $50 by: DANM for Construction: Revise UL listing to V455; remove wall/door at lobby | DANM | DANM | | XBS | T | 6104475 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 01/31/2019 | PAID (REC#1575905): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | T | 6093747 |
COLORADO STRUCTURES INC | XBS | T | 12/17/2018 | PAID (REC#1565642): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise foundation design | MICHAELA | MICHAELA | | XBS | T | 6054421 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | XPS | P | 12/14/2018 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice | SHANEN | SHANEN | | XPS | P | 6053785 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 12/14/2018 | PLAN SPLICE: (No Fee) by: SHANEN for Mechanical: Delta 5 | SHANEN | SHANEN | | XMS | P | 6053761 |
ROCKY MOUNTAIN PIPING & PLUMBING, INC. | XPS | P | 12/14/2018 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing | SHANEN | SHANEN | | XPS | P | 6053752 |
GDS ELECTRIC | XES | T | 10/19/2018 | PAID (REC#1551596): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting and light fixture schedule. | BERTHA | BERTHA | | XES | T | 6000845 |
COLORADO STRUCTURES INC | XPS | T | 10/04/2018 | PAID (REC#1544659) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 1-4-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5985758 |
COLORADO STRUCTURES INC | XBS | T | 08/28/2018 | PAID (REC#1544659) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add shaft framing | MICHAELA | MICHAELA | | XBS | T | 5948490 |
COLORADO STRUCTURES INC | XPS | T | 07/30/2018 | PAID (REC#1544659) PLAN SPLICE FEE: $50 by: DALEH for Plumbing: splice a whole new pumbing pages | DALEH | DALEH | | XPS | T | 5918335 |
COLORADO STRUCTURES INC | XBS | T | 07/13/2018 | PAID (REC#1544659) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add demo and sprinkler system - revise roof framing | MICHAELA | MICHAELA | | XBS | T | 5901642 |