SYNERGY HOMES DC, LLC | B= | C | 06/28/2019 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6248239 |
SYNERGY HOMES DC, LLC | B= | P | 06/28/2019 | a/c installed Additional Inspections Required (computer generated): BESTWAY PLUMBING Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6248094 |
SYNERGY HOMES DC, LLC | BSP | P | 06/12/2019 | prerock in storage units and steel beam wrap units 101 and 102 okay | BOBF | BOBF | | BSP | P | 6228925 |
SYNERGY HOMES DC, LLC | BSP | P | 05/30/2019 | drywall install at ceiling of storage rooms per BCI listing in units 201and 202 garages okay / drywall install at steel beam in garage of unit 101 garage okay / shearwall nailing at garage units 101 and 201 okay | BOBF | BOBF | | BSP | P | 6214462 |
SYNERGY HOMES DC, LLC | BSP | P | 05/23/2019 | 2nd layer 5/8" type X per BCI listing at steel beams in unit 101 okay | BOBF | BOBF | | BSP | P | 6208224 |
SYNERGY HOMES DC, LLC | BSP | P | 05/21/2019 | received BCI assembly for steel beam protection, steel beam protection for unit 101 okay / training with Lonnie S, reviewed steel beam protection at rated floor ceiling assembly | BOBF | BOBF | | BSP | P | 6205648 |
SYNERGY HOMES DC, LLC | BSP | P | 05/21/2019 | training with Bob F. / type V- B construction / walked beam protection inspection for beam penetrating rated floor ceiling assembly for unit separation / discussed RFI for beam - continuity requirements - types of gyp - inspection process | LONNYS | LONNYS | | BSP | P | 6205651 |
SYNERGY HOMES DC, LLC | BSP | P | 04/09/2019 | 2nd layer drywall install per UL L 570 on ceilings of unit 101, and garage ceilings of units 101, 201, and 202 okay / talked to contractor in about providing listings for penetrations in garage and mech rooms, will also need to provide documentation for products used | BOBF | BOBF | | BSP | P | 6159935 |
SYNERGY HOMES DC, LLC | BSP | P | 04/01/2019 | Base layer drywall gaps filled in to retain BC ceiling assembly continuity. | CHUCK | CHUCK | | BSP | P | 6150598 |
SYNERGY HOMES DC, LLC | BSP | R | 03/29/2019 | Base layer of 1/2" type C at ceiling of unit 101 does not maintain continuity above steel beam in west bedroom - large gap at edges - Rest of unit OK Per splice on file / Fastening OK at 12" OC | JUSTINL | JUSTINL | | BSP | R | 6148683 |
SYNERGY HOMES DC, LLC | BSP | P | 03/28/2019 | Base layer of 1/2" drywall on garage ceilings (excluding storage areas) 202, 201 and 101 OK per BCI assembly. | CHUCK | CHUCK | | BSP | P | 6147255 |
SYNERGY HOMES DC, LLC | BSP | R | 03/27/2019 | Screw placement does not comply with BCI ceiling and WP 3335 wall assemblies. Rated walls on both sides of type A unit garage are also Gyp. shear walls - shear table and WP 3335 assembly uses different fasteners/spacing. | CHUCK | CHUCK | | BSP | R | 6145782 |
SYNERGY HOMES DC, LLC | BIN | C | 03/12/2019 | BIN inspection OK / Header and electrical boxes insulated in units 201 and 102. | CHUCK | CHUCK | | BIN | C | 6132182 |
SYNERGY HOMES DC, LLC | BIN | P | 03/06/2019 | UNITS 202,101 NEED INSULATION BEHIND ELECTRIC BOXES AND AT HEADERS , unit 102,201 okay R values of batt insulation match IECC documentation. | NATHAN | NATHAN | | BIN | P | 6125445 |
SYNERGY HOMES DC, LLC | BSP | P | 03/05/2019 | BSP inspection - Resilient channel OK per Boise Cascade floor/roof assembly on file, in accessible Unit 102 and Unit 102, 201 and 202 garages. | CHUCK | CHUCK | | BSP | P | 6124436 |
SYNERGY HOMES DC, LLC | BSP | R | 02/21/2019 | BSP inspection - Resilient channel missing fasteners and framing for support at ends and additional RC where cut around fixtures in ceiling, in accessible 1st floor unit. | CHUCK | CHUCK | | BSP | R | 6113153 |
SYNERGY HOMES DC, LLC | BFR | C | 02/15/2019 | BFR inspection / Hold downs completed throughout building as per Shear Wall Schedule on Sht. S3.1 / Framing items completed. | CHUCK | CHUCK | | BFR | C | 6108426 |
SYNERGY HOMES DC, LLC | BIN | P | 02/15/2019 | BIN inspection / Installation of R38 insulation for floors/ceilings above garages and cantilevered floors at north end of building OK. R-value exceeds R30 requirements for floors as listed on the IECC cert. on file. | CHUCK | CHUCK | | BIN | P | 6108402 |
SYNERGY HOMES DC, LLC | BIN | P | 02/14/2019 | BIN inspection - multi story unit 102 only / Wall (R19), floor (R30) and ceiling/attic (R38) insulation reflects R values as listed per the prescriptive method on the IECC cert. on file. | CHUCK | CHUCK | | BIN | P | 6107280 |
SYNERGY HOMES DC, LLC | BFR | P | 02/12/2019 | BFR inspection - 4 plex / HTS 20 installed at exterior wall for truss AE1 and at shaftliner bearing wall for truss AME1 (3-2x4 bearing studs also installed at this wall) / Need to complete remaining framing items and hold downs. | CHUCK | CHUCK | | BFR | P | 6104664 |
SYNERGY HOMES DC, LLC | BSP | P | 02/12/2019 | BSP inspection - fire stopping/fire blocking throughout building OK in all units / Need to complete framing inspections items. | CHUCK | CHUCK | | BSP | P | 6104657 |
SYNERGY HOMES DC, LLC | BFR | P | 02/08/2019 | BFR inspection - 4 plex / Exterior and interior wall framing and trusses OK per Shts. S1 and S2 of the approved plans, except: missing HTS 20 at exterior wall for truss AE1 and at shaftliner bearing wall for truss AME1 (also missing 3-2x4 bearing studs at this wall) / Missing skewed hanger for floor joist to LVL and adequate steel post bearing under LVL/LVL connection, lower apt. unit adjacent to upper apt. stairway landing. / Missing holddowns various locations throughout building. Need to address U336 fire rated assembly continuity through garage passageways from lower/upper apt. units. | CHUCK | CHUCK | | BFR | P | 6101807 |
SYNERGY HOMES DC, LLC | BSP | P | 10/08/2018 | BSP inspection - porch post/cap and ST18 strap installation complete. | CHUCK | CHUCK | | BSP | P | 5989208 |
SYNERGY HOMES DC, LLC | BSP | P | 10/08/2018 | BSP inspection - shear wall edge fastener pattern/blocking and ST18 strap installation complete. Holddowns to be inspected at framing. | CHUCK | CHUCK | | BSP | P | 5989205 |
SYNERGY HOMES DC, LLC | BSP | R | 10/04/2018 | Building special inspection - exterior shear walls / Edge nail/staple spacing does not meet the requirements as specified in the Shear wall tables on Shts. S3.1/3.2. Staples not allowed for #5 shear wall type at garage openings. | CHUCK | CHUCK | | BSP | R | 5986592 |
SYNERGY HOMES DC, LLC | BSP | R | 08/20/2018 | Met on-site to discuss all the changes to the approved set of plans. None of the rated walls match the details on the approved plans. The floor ceiling assembly does not match with the joists used in the building. There are issues with penetrations from the mech room to the units above. Will need the arch. to address all issues pointed out to the owner and resubmit the plans for approval. | JEREMYA | JEREMYA | | BSP | R | 5939160 |
SYNERGY HOMES DC, LLC | BSP | P | 08/15/2018 | Spoke with Contractor & Sr Mech Inspector Jon Brazier - site meeting to discuss rated assemblies and penetrations is scheduled for Thursday Aug 16 | RICHB | RICHB | | BSP | P | 5934418 |
SYNERGY HOMES DC, LLC | BFI | C | 06/15/2018 | 2" R10 vertical on inside of foundation wall OK | RICHB | RICHB | | BFI | C | 5875596 |
SYNERGY HOMES DC, LLC | BFN | C | 06/15/2018 | Footing & foundation observations received - ufer noted | RICHB | RICHB | | BFN | C | 5875595 |
SYNERGY HOMES DC, LLC | BFT | C | 06/15/2018 | Soils & Open Hole received - 2200 psf, no drain, floating framing | RICHB | RICHB | | BFT | C | 5875593 |
SYNERGY HOMES DC, LLC | BFN | P | 06/14/2018 | Authorized third party observations - Stamped letters to follow | JEREMYA | JEREMYA | | BFN | P | 5875333 |
SYNERGY HOMES DC, LLC | BFT | P | 06/14/2018 | Authorized third party observations - Stamped letters to follow | JEREMYA | JEREMYA | | BFT | P | 5875331 |
WINTERS ELECTRIC, INC. | E= | C | 06/27/2019 | | BRIAN | BRIAN | | E= | C | 6247113 |
WINTERS ELECTRIC, INC. | E= | T | 06/26/2019 | PAID (REC#1609594): correction not made | BRIAN | BRIAN | | E= | T | 6244675 |
WINTERS ELECTRIC, INC. | E= | R | 06/24/2019 | correction not made | BRIAN | BRIAN | | E= | R | 6241854 |
WINTERS ELECTRIC, INC. | E= | R | 06/21/2019 | +14' between outlets in bedroom in unit 202 / all else ok / 101,102,201 ok / breaker locks on 20A heaters in all units / 20A A/C in all ok / | MIGUEL | MIGUEL | | E= | R | 6240788 |
WINTERS ELECTRIC, INC. | ER | C | 05/15/2019 | | BRIAN | BRIAN | | ER | C | 6200601 |
WINTERS ELECTRIC, INC. | ER | R | 05/14/2019 | need to verify the smoke alarm wires are demo from the box that feeds it / i could not see where it has been removed / | BRIAN | BRIAN | | ER | R | 6198956 |
WINTERS ELECTRIC, INC. | ES | C | 02/07/2019 | Residential Underground: 600 amp meter stack with 4 services at 125 amps and house meter at 100 amps okay | CHIPO | CHIPO | | ES | C | 6100197 |
WINTERS ELECTRIC, INC. | ES | P | 02/06/2019 | Residential Underground: 4 units with 3 wire 125 amp services-okay to set meters--------house panel and service not shown on prints. need splice on prints with load data to release service and final ES | CHIPO | CHIPO | | ES | P | 6099409 |
WINTERS ELECTRIC, INC. | ER | P | 01/25/2019 | all units except for the drop hard lids | BRIAN | BRIAN | | ER | P | 6088927 |
BJ COMPANY, LLC | E= | C | 01/22/2019 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6085100 |
BJ COMPANY, LLC | ER | C | 01/22/2019 | FIRE ALARM INSPECTION: all units--ok | BRIAN | BRIAN | | ER | C | 6085098 |
BJ COMPANY, LLC | E= | C | 01/22/2019 | FIRE ALARM INSPECTION: all units--ok | BRIAN | BRIAN | | E= | C | 6085099 |
WINTERS ELECTRIC, INC. | ER | R | 01/22/2019 | no unit #'s / missing outside outlets / missing bath fans/ ground outside light boxes / | BRIAN | BRIAN | | ER | R | 6085087 |
BESTWAY PLUMBING, INC | H= | C | 06/28/2019 | | JACK | JACK | | H= | C | 6248238 |
BESTWAY PLUMBING, INC | H= | P | 06/28/2019 | PARTIAL PENDING : NEED WATER HEATER VENTS ADDED TO THE SCOPE OF WORK. (TOTAL OF 4) NOTES: HIGH LOW COMBUSTION AIR. | LIDO | LIDO | | H= | P | 6247778 |
ASAP | H= | C | 06/27/2019 | 101- NOTES: DIRECT VENT FURNACE , HIGH LOW COMBUSTION AIR GRILLS , AC. 102- NOTES: NON DIRECT VENT FURNACE , HIGH LOW COMBUSTION AIR GRILLS , AC. 201- NOTES: DIRECT VENT FURNACE , HIGH LOW COMBUSTION AIR GRILLS , AC. 202- NOTES: NON DIRECT VENT FURNACE , HIGH LOW COMBUSTION AIR GRILLS , AC. | LIDO | LIDO | | H= | C | 6246107 |
BESTWAY PLUMBING, INC | HC | C | 06/25/2019 | OK TO SET ALL 4 METERS AT THIS ADDRESS. | NANCY | NANCY | | HC | C | 6243252 |
BESTWAY PLUMBING, INC | HI | C | 06/25/2019 | SPLICE DATED 4/25/19 HAS A NOTE ON THE SPLICE APPROVING INSTALLATION OF CSST. AT FINAL CHECK CONNECTION IN UNITS 102 AND 202. FOR FINAL NEED METER VERIFICATION LETTER. | NANCY | NANCY | | HI | C | 6243249 |
BESTWAY PLUMBING, INC | HI | P | 06/25/2019 | SPLICE FOR CORRECT METER LOCATION IS IN IMAGES / SPLICE DOES NOT SHOW CSST FOR INSTALL / NEED REVISED PLANS TO SHOW CSST OR STAMPED ENGINEER LETTER APPROVING 1" CSST INSTALL . ( NEED METER VERIFICATION LETTER BY FINAL AND NEED TO SEE UN IT 102 , 202 FINAL GAS CONNECTION BY FINAL.) | LIDO | LIDO | | HI | P | 6242646 |
BESTWAY PLUMBING, INC | HI | P | 06/18/2019 | NEED REVISED/APPROVED PLANS SHOWING CORRECT METER LOCATION AND PIPING AS INSTALLED AS CSST. CAN NOT RELEASE METERS UNTIL PLANS ARE REVISED/APPROVED. ( NEED METER VERIFICATION LETTER BY FINAL ) UN IT 102 AND 202 FINAL CONNECTION NOT COMPLETED. UNIT 101 AND 201 FINAL CONNECTION TO EQUIPMENT OK. | LIDO | LIDO | | HI | P | 6234829 |
ASAP | HD | P | 05/10/2019 | UNIT #101: ABOVE CEILING DUCT BELOW PRE-ROCK INSTALLED PER PLAN. | MARKB | MARKB | | HD | P | 6195174 |
BESTWAY PLUMBING, INC | HV | P | 01/23/2019 | NEED WATER HEATER VENTS ATTACHED TO PERMIT - REVISE PLAN FOR WATER HEATER VENTING / PLAN SHOWS CONCENTRIC VENT HAS SINGLE EXHAUST INSTALLED - AT FUTURE INSPECTION VERIFY VENT TERMINATION - HOW IS COMBUSTION AIR FOR WATER HEATER BEING OBTAINED | JERRYF | JERRYF | | HV | P | 6085434 |
ASAP | HV | C | 01/17/2019 | ALL VENTS ABOVE CEILING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HV | C | 6082109 |
ASAP | HD | P | 01/17/2019 | SUPPLY/RETURN/EXHAUST DUCTS ABOVE CEILING OK IN 102, 201 AND 202. NEED TO SEE 101 WHEN INSTALLED AFTER PRE ROCK. | DUSTINS | DUSTINS | | HD | P | 6082108 |
BESTWAY PLUMBING, INC | HV | P | 01/14/2019 | CONTRACTOR NEEDS TO ATTACH WATER HEATER VENTS TO SCOPE OF WORK. NEED ENGINEER TO ADDRESS COMBUSTION AIR FOR WATER HEATERS IN ALL UNITS, PLANS CALL FOR CONCENTRIC KITS TO BE INSTALLED AND ONLY EXHAUST PIPE IS INSTALLED. ALL VENTS OK EXCEPT THE TOWN HOME UNIT NEEDS SUPPORTED EVERY 4'. CHECK CONNECTION TO WATER HEATER IN FRONT LOWER UNIT WHEN WATER HEATER GETS RE-INSTALLED. | DUSTINS | DUSTINS | | HV | P | 6077147 |
BESTWAY PLUMBING, INC | HI | P | 12/20/2018 | NEED REVISED/APPROVED PLANS SHOWING CORRECT METER LOCATION AND PIPING AS INSTALLED AS CSST. CAN NOT RELEASE METERS UNTIL PLANS ARE REVISED/APPROVED. FOUR 10 LB TEST OK. | DUSTINS | DUSTINS | | HI | P | 6059913 |
ASAP | HSP | P | 08/16/2018 | CONSULTED WITH THE BUILDING AND MECHANICAL CONTRACTORS FOR CONSTRUCTION OF AND THE HVAC PENETRATIONS IN RATED ASSEMBLIES. DESIGNERS WILL HAVE PLANS REVISED FOR ANY CHANGES FROM THE ORIGINAL APPROVED DRAWINGS. | JON | JON | | HSP | P | 5936594 |
ASAP | HSP | P | 07/11/2018 | CONSULTED WITH MECHANICAL CONTRACTOR AND BUILDING SUPERINTENDENT FOR DUCT PENETRATIONS. DID NOT HAVE APPROVED SET ON SITE TO DETERMINE BUILDING CONSTRUCTION TYPE. CONTACTED BUILDING INSPECTOR TO MEET TOGETHER ON SITE TO DETERMINE IF THERE ARE ANY ISSUES WITH DUCT PENETRATIONS. REVIEWING THE PLANS BACK AT THE OFFICE THE CONSTRUCTION TYPE IS 5B. CONTRACTOR WILL CALL AN HSP AND BSP TO DISCUSS DUCT PENETRATIONS AT FLOOR/CEILING ASSEMBLY AND ROOF CEILING ASSEMBLIES FOR ANY AND ALL DUCTS WHERE FIRE RESISTANT CONSTRUCTION IS PRESENT. | JON | JON | | HSP | P | 5899730 |
BESTWAY PLUMBING, INC | P= | C | 06/26/2019 | Ok. | DANR | DANR | | P= | C | 6244948 |
BESTWAY PLUMBING, INC | PTO | C | 01/24/2019 | Ok. Note: need engineer letters noted in previous pto inspections and for 1 expansion tank water entry drawings show at each water heater check water heater and water entry at final. | DANR | DANR | | PTO | C | 6087405 |
BESTWAY PLUMBING, INC | PTO | P | 12/31/2018 | ok for test and design for all unit domestic waters MINUS WATER HTR SET @ LOWER WEST SIDE UNIT, LOW WATER TEST @ WEST SIDE 2ND UPR UNIT (area marked w/ black X's), rest ok **STILL NEED 12/20 CORRECTIONS, REMAINDER OF PB, MAIN WATER DISTRO, 1ST FLOOR WATER CLOSETS, AND ALL TUBS / SHWRS INSPECTED | JOHNS | JOHNS | | PTO | P | 6066196 |
BESTWAY PLUMBING, INC | PTO | P | 12/20/2018 | duplicate entrty, SEE BELOW | JOHNS | JOHNS | | PTO | P | 6060168 |
BESTWAY PLUMBING, INC | PTO | P | 12/20/2018 | ok for test / design for dwv only MINUS TUBS, 1ST FLOOR WATER CLOSETS AND FREEZE PRO @ GARAGE P-TRAPS,**need engineers letter allowing the deletion of all sub meters, aav's in lieu of vtr @ "town home" unit @ pwdr and washer box, and @ far west lower level washer box**, rest ok. NOTE: vtr, aav @ town home unit @ pwdr and washer box, aav @ west side unit lower levl @ washer box, check water entrty @ final, expansion will be @ water entry , main unit shut offs @ mech w / access panel by final, shut offs @ hose bibs @ closet w/ acess panel by final **STILL NEED ABOVE CORRECTIONS, DOMESTIC WATETRS, AND MAIN WATER WATER DISTRO
**INSPECTOR NOTE: VERIFY 2" VTR @ TOWN HOME UNIT @ NEXT INSPECTION | JOHNS | JOHNS | | PTO | P | 6059312 |
BESTWAY PLUMBING, INC | PB | P | 06/14/2018 | Need water stubbed into water entry room, dwv ok to cover.. | DANR | DANR | | PB | P | 5875357 |
BESTWAY PLUMBING, INC | PB | T | 06/14/2018 | PAID (REC#1507446) AFTER-HOURS INSPECTION: $200 From: TERRI 6/14/18 4PM | TERRI | TERRI | | PB | T | 5874739 |
BESTWAY PLUMBING, INC | XPS | T | 04/26/2019 | PAID (REC#1596602) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 4/26/19: Delta 4 revisions P1.0 update fixture schedule, P1.1 floor drain AAV, P1.2 no revisions | SHANEN | SHANEN | | XPS | T | 6178893 |
BESTWAY PLUMBING, INC | XPS | T | 04/26/2019 | PAID (REC#1593615) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 4/26/19: Delta 4 revisions P1.0 update fixture schedule, P1.1 floor drain AAV, P1.2 no revisions | SHANEN | SHANEN | | XPS | T | 6178862 |
BESTWAY PLUMBING, INC | XMS | T | 04/25/2019 | PAID (REC#1593615) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 4 | DALEH | DALEH | | XMS | T | 6177603 |
BESTWAY PLUMBING, INC | XMS | T | 04/25/2019 | PAID (REC#1593615) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 4 | DALEH | DALEH | | XMS | T | 6177588 |
SYNERGY HOMES DC, LLC | XBS | T | 02/12/2019 | PAID (REC#1575909) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided fire protection continuity detail for "tunnel" area in garage.Revised detail notations. | BPHILLIPS | BPHILLIPS | | XBS | T | 6104946 |
SYNERGY HOMES DC, LLC | XBS | T | 01/23/2019 | PAID (REC#1571261) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised accessibility plan and columns | SHELLEY | SHELLEY | | XBS | T | 6085705 |
BJ COMPANY, LLC | XES | T | 01/07/2019 | PAID (REC#1567728) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added house panel. | BERTHA | BERTHA | | XES | T | 6070694 |
BESTWAY PLUMBING, INC | XPS | T | 01/07/2019 | PAID (REC#1567705) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice revised 1-7-19 | TCRIPPEN | TCRIPPEN | | XPS | T | 6069737 |
SYNERGY HOMES DC, LLC | XBS | P | 01/03/2019 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: add detail | MICHAELA | MICHAELA | | XBS | P | 6068032 |
ASAP | XMS | P | 10/19/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised layout | JUSTINC | JUSTINC | | XMS | P | 5999702 |