WILLIAMS CONSTRUCTION CORPORATION | B= | C | 05/10/2019 | all final inspections received, core/shell permit completed | NATHAN | NATHAN | | B= | C | 6194688 |
WILLIAMS CONSTRUCTION CORPORATION | B= | P | 12/14/2018 | Temp CO: Per Core and Shell final ( Expires: 1/13/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6053754 |
WILLIAMS CONSTRUCTION CORPORATION | B= | P | 11/16/2018 | Temp CO: extension ( Expires: 12/16/2018 12:00:00 AM) | GITA | GITA | | B= | P | 6027575 |
WILLIAMS CONSTRUCTION CORPORATION | B= | P | 10/19/2018 | Temp CO: Temp CO: pending mechanical and building finals ( Expires: 11/18/2018 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6000776 |
WILLIAMS CONSTRUCTION CORPORATION | B= | P | 09/20/2018 | Temp CO: pending mechanical, building and fire finals ( Expires: 10/20/2018 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 5971467 |
WILLIAMS CONSTRUCTION CORPORATION | B= | P | 09/19/2018 | complete all required inspections, need Core/ Shell permit completed prior to TI final. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BRUNO'S MECHANICAL INC. Plumbing Final Inspection is not Completed yet, FRONTIER MECHANICAL INC Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5970185 |
WILLIAMS CONSTRUCTION CORPORATION | BSP | P | 09/17/2018 | above ceiling not needed, discussed final walk items and core shell not being finaled. | NATHAN | NATHAN | | BSP | P | 5967429 |
WILLIAMS CONSTRUCTION CORPORATION | BFR | P | 08/03/2018 | with completed required inspections and structural letter for welding frame okay | NATHAN | NATHAN | | BFR | P | 5923570 |
FOSTER ELECTRIC CORPORATION | EP | C | 09/12/2018 | breakers are 65k AIC / | MIGUEL | MIGUEL | | EP | C | 5963440 |
FOSTER ELECTRIC CORPORATION | E= | C | 09/12/2018 | rtu 7-45A---RTU 8,9-50A--- MAU -15A ,---EF-15A, all ok / | MIGUEL | MIGUEL | | E= | C | 5963439 |
FOSTER ELECTRIC CORPORATION | ES | C | 08/09/2018 | Commercial Service: 400 amp 4-w --ok to ser meter | BRIAN | BRIAN | | ES | C | 5928440 |
FOSTER ELECTRIC CORPORATION | EP | P | 08/08/2018 | NEED TO VERIFY THE BREAKERS ARE OK FOR USE ------REST OK--- | BRIAN | BRIAN | | EP | P | 5928343 |
FOSTER ELECTRIC CORPORATION | ER | P | 07/30/2018 | all walls complete NO F/A!!! | GARYL | GARYL | | ER | P | 5917845 |
FOSTER ELECTRIC CORPORATION | ER | P | 07/23/2018 | see plans, hard lid, | JOHNN | JOHNN | | ER | P | 5910538 |
FOSTER ELECTRIC CORPORATION | ER | P | 07/16/2018 | WALLS SEE PLANS--- | BRIAN | BRIAN | | ER | P | 5903393 |
FOSTER ELECTRIC CORPORATION | EUG | C | 06/29/2018 | interior slab | JOHNN | JOHNN | | EUG | C | 5889460 |
FRONTIER MECHANICAL INC. | H= | C | 11/16/2018 | SEE IMAGES | JERRYF | JERRYF | | H= | C | 6027576 |
FRONTIER MECHANICAL INC. | H= | P | 09/19/2018 | PARTIAL PENDING GREASE FAN EXTENSION NOTES: INTERLOCKS AT DISH HOOD AND TAB REPORT ARE COMPLETE | JERRYF | JERRYF | | H= | P | 5969460 |
FRONTIER MECHANICAL INC. | H= | P | 09/18/2018 | NEED THE FOLLOWING - TAB REPORT - GREASE FAN EXHAUST EXTENSION - SEAL ROOF CURB AT GREASE FAN - ENGINEER TO ADDRESS INTERLOCKS AT DISH HOOD PER PLAN INTERLOCKED WITH RTU 7 | JERRYF | JERRYF | | H= | P | 5968150 |
FRONTIER MECHANICAL INC. | H= | P | 09/14/2018 | SEE HD NOTES FOR FINAL NOTES: ALL GAS WORK IS COMPLETE | JERRYF | JERRYF | | H= | P | 5965479 |
FRONTIER MECHANICAL INC. | HD | P | 09/14/2018 | NEED CONSULT WITH SENIOR ON TRANSFER OF ALL NOTES TO FRONTIER MECHANICAL - STILL NEED THE FOLLOWING - TAB REPORT - INTERLOCKS AT DISH HOOD - COMPLETE GREASE WRAP - COMPLETE WASH ABLE SURFACE BEHIND HOOD - FAN EXTENSION AT GREASE HOOD NOTES: INTERLOCKS OK AT GREASE HOOD 1 | JERRYF | JERRYF | | HD | P | 5965477 |
MAUI MECHANICAL, INC. | H= | C | 09/14/2018 | SEE IMAGES | JERRYF | JERRYF | | H= | C | 5965118 |
BRUNO'S MECHANICAL INC. | HSP | P | 09/12/2018 | STOPPED BY JOB SITE AND HAD CONSULT WITH ROGER PORTER FROM BRUNOS ON REQUIREMENTS TO COMPLETE FINAL - INCLUDING - INTER LOCKS AT ALL FANS - GREASE WRAP REQUIREMENTS - ROOF INSPECTION - TAB REPORT - GAS WORK - WASHABLE SURFACE BEHIND TYPE 1 HOOD | JERRYF | JERRYF | | HSP | P | 5963279 |
BRUNO'S MECHANICAL INC. | HD | P | 09/11/2018 | NEED CONSULT WITH SENIOR INSPECTOR ON GREASE WRAP INSTALLATION WILL CALL KEVIN IN THE AM AT 963 - 3151 WITH RESULTS - STILL NEED ALL BANDING AND COMPLETE GASKET AT FAN TO COMPLETE GREASE DUCT | JERRYF | JERRYF | | HD | P | 5960920 |
MAUI MECHANICAL, INC. | HRP | C | 09/10/2018 | FOR FINAL NEED CONDENSER LABELED FOR UNIT SERVED AND SEAL LINE SET AT PVC ELBOW | JERRYF | JERRYF | | HRP | C | 5959365 |
BRUNO'S MECHANICAL INC. | HD | P | 09/07/2018 | 1ST LAYER GREASE WRAP OK | JERRYF | JERRYF | | HD | P | 5958050 |
BRUNO'S MECHANICAL INC. | HD | P | 09/06/2018 | GREASE DUCT OK FOR 1ST LAYER WRAP - DO NOT INSTALL 2ND LAYER UNTIL 1ST LAYER IS INSPECTED - BEFORE 1ST LAYER NEED ROOF DECK REMOVED FOR ACCESS TO CURB WRAP TO PROTECT FOR TEARING WRAP | JERRYF | JERRYF | | HD | P | 5956618 |
BRUNO'S MECHANICAL INC. | HD | P | 09/04/2018 | HAS SEVERAL HOLES - STOPPED INSPECTION - NEED PROPER CLEARANCE FOR GREASE WRAP AT WALL AT HOOD TRANSITION WILL VERIFY AT FUTURE INSPECTION | JERRYF | JERRYF | | HD | P | 5954248 |
BRUNO'S MECHANICAL INC. | HD | P | 08/29/2018 | NEED SMOKE TEST FOR TOP OF OFFSET DUE TO TYPE OF REPAIR FOR DUCT CORRECTION THAT WAS MADE - REST OF DUCT LIGHT TEST OK - AT NEXT INSPECTION CHECK GREASE WRAP AT CURB AREA AFTER STRUCTURAL STEEL HAS BEN CORRECTED - AT FUTURE INSPECTION VERIFY HOOD HAS BEEN SUPPORTED WITH 1/2" ALL THREAD PER CAPTIVE AIR SPECS. PER PLAN AT THIS TIME HOOD IS SUPPORTED WITH 3/8" ALL THREAD | JERRYF | JERRYF | | HD | P | 5949266 |
BRUNO'S MECHANICAL INC. | HD | R | 08/24/2018 | AUTO CALL COMPLETE AT 10:00 - ARRIVED 10:10 - NO ONE ONSITE FROM MECHANICAL CONTRACTOR CALLED CALL AHEAD NUMBER AND TALKED TO CONTRACTOR WAS GOING TO WAIT - WHILE WAITING FOR CONTRACTOR DID VISUAL INSPECTION AND VERIFIED SEVERAL GREASE DAMS INSIDE DUCT WORK ALL INTERIOR OF DUCT MUST BE SMOOTH - GREASE WRAP IS SEVERELY COMPRESSED AT STRUCTURAL STEEL OPENING - STRUCTURAL STEEL WILL NEED TO BE MODIFIED TO AVOID COMPRESSION - WILL NEED TO VERIFY SECOND LAYER WRAP IN CURB APPEARS WRAP MAY NOT BE INSTALLED CORRECTLY - STOPPED INSPECTION - NOTIFIED CONTRACTOR WILL NEED TO RE INSPECT ALL EXCEPT WELDS ON PREVIOUSLY INSPECTED DUCT | JERRYF | JERRYF | | HD | R | 5944899 |
BRUNO'S MECHANICAL INC. | HD | P | 08/21/2018 | LIGHT TEST OK FOR WRAP ON CURB DROP ONLY - NEED PLANS REVISED SHOWING GREASE DUCT SIZING AND TYPE OF DUCT INSTALLED - HAD CONSULT WITH G.C. ON WASH ABLE SURFACE REQUIREMENTS BEHIND AND ABOVE HOOD | JERRYF | JERRYF | | HD | P | 5940411 |
BRUNO'S MECHANICAL INC. | HI | P | 08/02/2018 | PRESSURE TESTS OK - PIPING INSTALLED DOES NOT MATCH PLAN - NEED PLAN REVISED BEFORE METER RELEASE / CONTRACTOR PROCEEDING AT OWN RISK - AT FUTURE INSPECTION VERIFY REGS/ LABELS AND FINAL CONNECTIONS | JERRYF | JERRYF | | HI | P | 5922537 |
BRUNO'S MECHANICAL INC. | HD | P | 08/02/2018 | HOOD WALL OK | JERRYF | JERRYF | | HD | P | 5922536 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 09/19/2018 | Correction made | SHANEN | SHANEN | | P= | C | 5969270 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 09/18/2018 | Installing at time of inspection | SHANEN | SHANEN | | P= | P | 5967992 |
BRUNO'S MECHANICAL INC. | P= | P | 09/13/2018 | Need fill / drain kit for MAU, rest OK | SHANEN | SHANEN | | P= | P | 5963927 |
BRUNO'S MECHANICAL INC. | PTO | P | 08/02/2018 | pending fill and drain kit for MAU, rest ok test and design @ above ceiling dwv and water, ok for baths dwv and water, ok for 3/4 tp hand sink / steam table. NOTE: vtr, check water htr and water entry @ final | JOHNS | JOHNS | | PTO | P | 5921693 |
BRUNO'S MECHANICAL INC. | PTO | P | 08/01/2018 | Canceled | SHANEN | SHANEN | | PTO | P | 5920143 |
BRUNO'S MECHANICAL INC. | PTO | P | 07/20/2018 | In wall DWV and domestic water at kitchen area test OK, change 1/2" water line feeding hand sink and steam table to 3/4" | SHANEN | SHANEN | | PTO | P | 5909004 |
BRUNO'S MECHANICAL INC. | PB | C | 06/28/2018 | revise plans for ( 3 inch floor sinks, 2 inch drain at mop sink and lav/ floor drain at mens restroom, cellular core PVC ). | TAYLOR | TAYLOR | | PB | C | 5889210 |