HANNA DESIGN GROUP INC. | B= | C | 04/25/2019 | zoning complete | JANE | JANE | | B= | C | 6177563 |
HANNA DESIGN GROUP INC. | B= | P | 04/15/2019 | Temp CO: PEr BW ( Expires: 5/15/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6165930 |
HANNA DESIGN GROUP INC. | B= | P | 03/29/2019 | corrections okay / pending other final inspections. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), M W MECHANICAL INC Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6149380 |
HANNA DESIGN GROUP INC. | B= | P | 03/19/2019 | Temp CO: pending finals ( Expires: 4/18/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6136954 |
HANNA DESIGN GROUP INC. | B= | P | 03/18/2019 | roof cap still incomplete along west elevation / other corrections okay / need to complete other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), M W MECHANICAL INC Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6135644 |
HANNA DESIGN GROUP INC. | B= | P | 03/15/2019 | men's restroom sink measures over 34" off of the finished floor / roof cap incomplete along west elevation / need to complete other final inspections -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 6133714 |
HANNA DESIGN GROUP INC. | BSP | P | 03/11/2019 | observed FB 1003 SL silicone sealant at steel duct penetration in med gas closet horizontal assembly - see 3M Engineering judgment for penetration on file | BRIANB | BRIANB | | BSP | P | 6130595 |
HANNA DESIGN GROUP INC. | BSP | P | 03/11/2019 | engineer observation letter foundation subgrade, foundation, reinforcing steel construction on file | BRIANB | BRIANB | | BSP | P | 6129745 |
HANNA DESIGN GROUP INC. | BFI | C | 03/11/2019 | engineer observation letter on file | BRIANB | BRIANB | | BFI | C | 6129740 |
HANNA DESIGN GROUP INC. | BFN | C | 03/11/2019 | Engineer letter for foundation on file | BRIANB | BRIANB | | BFN | C | 6129737 |
HANNA DESIGN GROUP INC. | BFT | C | 03/11/2019 | Engineer letter for footing received | BRIANB | BRIANB | | BFT | C | 6129733 |
HANNA DESIGN GROUP INC. | BSP | R | 03/06/2019 | incorrect fire caulk installed at steel duct penetration in horizontal assembly in med gas closet (EJ requires FB1003 SL silicone sealant / observed CP 25WB+ 3M fire caulk at copper pipe penetrations at med gas closet horizontal assembly | BRIANB | BRIANB | | BSP | R | 6126126 |
HANNA DESIGN GROUP INC. | BSP | P | 03/05/2019 | observed gyp fastening for walls (UL U465) at interior side of med gas closet / observed 2nd layer of gyp at horizontal assembly in med gas closet (Ga FC4503) / still need to inspect all penetrations - see comments from previous inspections / Training with PPRBD inspector Scott / discussed IFC Medical Gases 5306.2.1 one-hour exterior room and 5306.2.2 one-hour interior room / reviewed IMC 502.9.1 medical gas systems / also reviewed 3M engineering judgments for through penetrations in horizontal assembly at med gas closet | BRIANB | BRIANB | | BSP | P | 6124983 |
HANNA DESIGN GROUP INC. | BSP | P | 03/05/2019 | training with Brian B -- reviewed 2015 IFC 5306 Medical gases and 5306.2.2 One Hour Interior Room | SCOTTS | SCOTTS | | BSP | P | 6124976 |
HANNA DESIGN GROUP INC. | BSP | P | 03/05/2019 | 3M Fire protection engineering judgment for cast iron and copper pipe penetration at horizontal assembly in med gas closet on file | BRIANB | BRIANB | | BSP | P | 6124492 |
HANNA DESIGN GROUP INC. | BFT | R | 03/05/2019 | reinforcing steel observation letters - fill observations - concrete field observation letters uploaded to inspection request / missing permitted address and stamp on all observation letters / still need observation letters to complete footing - foundation and foundation insulation inspections | BRIANB | BRIANB | | BFT | R | 6124149 |
HANNA DESIGN GROUP INC. | BSP | R | 03/04/2019 | incorrect fasteners installed at gyp for walls (UL U465) at interior side of med gas closet / observed 1st layer of gyp at horizontal assembly in med gas closet (Ga FC4503) / still need to inspect 2nd layer at horizontal assembly and need to inspect all penetrations - see comments from previous inspections | BRIANB | BRIANB | | BSP | R | 6123727 |
HANNA DESIGN GROUP INC. | BSP | R | 02/27/2019 | firestop details for wall penetrations uploaded to inspection request - need firestop details for horizontal assembly | BRIANB | BRIANB | | BSP | R | 6118499 |
HANNA DESIGN GROUP INC. | BFR | P | 02/26/2019 | observed gyp and fastening for UL u465 assembly at exterior side of med gas closet / observed steel framing for horizontal assembly over med gas closet- GA FC4503 / will need firestop details for all through penetrations / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6118253 |
HANNA DESIGN GROUP INC. | BFR | P | 01/14/2019 | observed soffit framing per detail 3 of sheet A602 over waiting area only / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6077714 |
HANNA DESIGN GROUP INC. | BIN | P | 01/04/2019 | observed insulation corrections along exterior walls / pending other rough inspections and completed frame inspection / discussed with the site superintendent U465 for rated assembly at interior med gas closet walls and required inspections for assembly and also reviewed L524 rated horizontal assembly at med gas closet - UL L524 horizontal assembly does not match as built condition and will need revised approved listing to match light gauge framing installed / still need to inspect all hard lid framing including framing for horizontal assembly at med gas closet / still need all engineering observation letters to complete BFT - BFN - BFI and for structural steel | BRIANB | BRIANB | | BIN | P | 6069100 |
HANNA DESIGN GROUP INC. | BIN | R | 12/21/2018 | Still have voids - missing insulation at dbl king studs at east and north exterior wall in front waiting area, spots missing insulation at east exterior wall in exam rooms, at south exterior wall at rear door and at dbl king studs / also have over 2” of foam insulation material in spots of (4) king studs at west wall in exam rooms | BRIANB | BRIANB | | BIN | R | 6061510 |
HANNA DESIGN GROUP INC. | BSP | P | 12/21/2018 | stamped letter for foam insulating material at king studs on file | BRIANB | BRIANB | | BSP | P | 6060538 |
HANNA DESIGN GROUP INC. | BSP | R | 12/19/2018 | stamped letter from architect states that the general contractor is to install foam insulating system per the manufacturer's specifications / es report 3052 for touch n foam spray insulation states that the insulation must not exceed a total thickness of 2" / foam installed exceeds total thickness allowed per manufacturer's specifications | BRIANB | BRIANB | | BSP | R | 6057447 |
HANNA DESIGN GROUP INC. | BLA | C | 12/17/2018 | received ESR-1478 for 2" rigid at exterior walls / lath okay | BRIANB | BRIANB | | BLA | C | 6055422 |
HANNA DESIGN GROUP INC. | BSP | R | 12/14/2018 | upload is of physical properties only/provide ES report | SCOTTS | SCOTTS | | BSP | R | 6052776 |
HANNA DESIGN GROUP INC. | BSP | R | 12/13/2018 | missing stamp on letter from architect for spray foam insulation at box headers and king studs / also es report 3052 for touch n foam spray insulation states that the insulation must not exceed a total thickness of 2" | BRIANB | BRIANB | | BSP | R | 6051528 |
HANNA DESIGN GROUP INC. | BIN | P | 12/11/2018 | PARTIAL INSULATION INSPECTION -- observed exterior thermal with R19 batts/break room and north wall at business office incomplete this inspection -- provide ES report for rigid installed on exterior per previous inspection -- headers and kings were not pre insulated/contractor sprayed headers and kings with Spray-N Foam insulation/can not visually observe spray insulation in these concealed areas | SCOTTS | SCOTTS | | BIN | P | 6049462 |
HANNA DESIGN GROUP INC. | BFR | P | 12/04/2018 | PARTIAL / interior light gauge wall framing okay / reviewed U465 for rated assembly at interior med gas closet walls and inspections for assembly (verified American 5/8" AGX-1) with site superintendent / also reviewed L524 rated horizontal assembly at med gas closet - UL L524 horizontal assembly does not match as built condition and will need revised approved listing to match light gauge framing installed / need to inspect all hard lid framing including framing for horizontal assembly at med gas closet / need all engineering observation letters to complete BFT - BFN - BFI and for structural steel / reviewed accessible elements with the site superintendent / need to complete other rough inspections | BRIANB | BRIANB | | BFR | P | 6042594 |
HANNA DESIGN GROUP INC. | BIN | R | 12/04/2018 | not ready / no inspection performed / discussed insulation at box headers and dbl k.s | BRIANB | BRIANB | | BIN | R | 6042578 |
HANNA DESIGN GROUP INC. | BSP | P | 11/01/2018 | VB construction / ply inspection requested and not required / no inspection performed / discussed with site superintendent the 2" rigid foam insulation to be installed at the exterior walls and needing a copy of the ES report for proposed 2" foam to be installed and inspected (see sheets A301 - A303 of the approved design) | BRIANB | BRIANB | | BSP | P | 6012766 |
HANNA DESIGN GROUP INC. | BFR | P | 10/22/2018 | PARTIAL / EXTERIOR LGHT GAUGE WALL FRAMING OKAY ONLY / met with Hanna Design superintendents and reviewed accessible elements, inspection scheduling, required inspections, pre-insulation at box headers and engineering observation letters from Kumar needed to complete foundation inspections / observation letter from Kumar for all structural steel to follow as well / also went over fire rated assemblies for interior med gas closet (including UL design U465) / Training with PPRBD inspector Lonny / VB construction / B occupancy / interior med gas room and rated assemblies / light gauge stl wall framing and discussed accessible elements / also went over approved ComCheck for project and pre-insulation at box headers | BRIANB | BRIANB | | BFR | P | 6002443 |
HANNA DESIGN GROUP INC. | BSP | P | 10/22/2018 | training with inspector Brian B. / light gauge exterior wall framing - reviewed wall detail / reviewed interior med gas room requirements - UL design U465 A101 floor plan sheet / reviewed com check with site rep / reviewed accessible elements | LONNYS | LONNYS | | BSP | P | 6002432 |
HANNA DESIGN GROUP INC. | BSP | R | 09/07/2018 | engineering observation paper work unavailable onsite for pick up - inspection cancelled by GC | BRIANB | BRIANB | | BSP | R | 5958683 |
HANNA DESIGN GROUP INC. | BFI | P | 08/27/2018 | AUTHORIZED INSPECTION BY ENGINEER / observation letter from Kumar to follow | BRIANB | BRIANB | | BFI | P | 5946892 |
HANNA DESIGN GROUP INC. | BFN | P | 08/27/2018 | AUTHORIZED INSPECTION BY ENGINEER / observation letter from Kumar to follow / met with HDG superintendent Cameron - went over inspection processes and scheduling / also went over fire rated assemblies at med gas closet - rated wall type P-3 (U465) and rated horizontal assembly (U524) | BRIANB | BRIANB | | BFN | P | 5946890 |
HANNA DESIGN GROUP INC. | BFT | P | 08/27/2018 | AUTHORIZED INSPECTION BY ENGINEER / observation letter from Kumar to follow / met with HDG superintendent Cameron - went over inspection processes and scheduling / also went over fire rated assemblies at med gas closet - rated wall type P-3 (U465) and rated horizontal assembly (U524) | BRIANB | BRIANB | | BFT | P | 5946885 |
FOSTER ELECTRIC CORPORATION | E= | C | 03/08/2019 | Corrections complete / | ROB | ROB | | E= | C | 6127799 |
FOSTER ELECTRIC CORPORATION | E= | P | 03/07/2019 | 3-service receptacles for RTU's not working / Need max 30 amp overcurrent protection for RTU 1,2,&3 / Wirig ok for signs on roof / | ROB | ROB | | E= | P | 6126546 |
FOSTER ELECTRIC CORPORATION | EUG | C | 02/26/2019 | light pole bases okay to pour | CHIPO | CHIPO | | EUG | C | 6118151 |
FOSTER ELECTRIC CORPORATION | EUG | P | 02/21/2019 | Rest of EUG for pole lights complete / | ROB | ROB | | EUG | P | 6113201 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/21/2019 | Final complete for rooms 101,102,108,109,110,111,112 / All corrections completed / NOTE: Need to do roof, pole/site lighting and exterior of building to complete final / | ROB | ROB | | E= | P | 6113195 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/20/2019 | Need to complete corrections from 2.19.2019 inspection / Need to provide correct wiring for split unit / GFCI protection for water coolers not working / Final ok for rooms 104,105,106,107113,114,115,116,117 and Hall 103 / | ROB | ROB | | E= | P | 6112024 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/19/2019 | All panels and main disconnect need Fault Current and Series Rated labeling / Micro GFCI protection needs to be readily accessible / Final ok for rooms 120,121,123,124,125,126,127 / | ROB | ROB | | E= | P | 6110961 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/15/2019 | Drop ceiling in break room only. / Also inspected cold water GEC bonding. | JOSEPH | JOSEPH | | ER | P | 6108558 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/06/2019 | ALL CEILLINGS OK EXCEPT BREAK RM ------ | GREGM | GREGM | | ER | P | 6099120 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/14/2019 | North wall where water pipe relocated ok / Storage room walls ok, relocated recpts. to this location for comm. board / South wall where panels are located / Cad weld for Ufer Ground ok / | ROB | ROB | | ER | P | 6077776 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/26/2018 | North wall in Rm 113 ok / | ROB | ROB | | ER | P | 6062798 |
FOSTER ELECTRIC CORPORATION | ES | P | 12/26/2018 | Commercial Service: 600 amp 4 wire comm service--Ok to energize /----------------Service complete up to 600 amp Main Disconnect----------need to check cad welds for ufer and steel, check water pipe ground ( water pipe is being relocated ) / | ROB | ROB | | ES | P | 6062785 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/07/2018 | Rough ok for walls except rooms 113 north wall, 120 south wall, and wall in 126 accessing water pipe for GEC--Pipe stubbed up for switches, discused Ansi 117 / | ROB | ROB | | ER | P | 6046132 |
FOSTER ELECTRIC CORPORATION | EUG | P | 11/07/2018 | EUG ok for pole lighting and sign from building to outside perimeter curb--Needs to complete stub ups at poles and building and complete the outside curb area for sign and one pole light / | ROB | ROB | | EUG | P | 6018804 |
FOSTER ELECTRIC CORPORATION | ESL | C | 09/28/2018 | ESL ok---Corrections complete / | ROB | ROB | | ESL | C | 5980335 |
FOSTER ELECTRIC CORPORATION | ESL | R | 09/27/2018 | Need corrosion protection on IMC / | ROB | ROB | | ESL | R | 5978432 |
FOSTER ELECTRIC CORPORATION | ESL | R | 09/25/2018 | CAN NOT RUN PVC UNDER SLAB IN PATIENT CARE AREAS/ | GREGM | GREGM | | ESL | R | 5975263 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/17/2018 | UFER OK / | GREGM | GREGM | | ER | P | 5967375 |
M W MECHANICAL INC | H= | C | 04/09/2019 | | LIDO | LIDO | | H= | C | 6159632 |
M W MECHANICAL INC | HSP | P | 04/08/2019 | RECEIVED ENGINEER APPROVED SUBMITTAL FOR CU-1 / AHU-1 . ( SEE IMAGES ) PARTIAL PENDING : MECHANICAL CONTRACTOR WILL NEED CALL IN FOR A HEAT FINAL. | LIDO | LIDO | | HSP | P | 6158154 |
M W MECHANICAL INC | H= | P | 03/25/2019 | PARTIAL PENDING: CARRIER MINI SPLIT INSTALLED INSTEAD OF MITSUBISHI / THIS WAS NOT CORRECTED ON THE EQUIPMENT SCHEDULE . I WILL EXCEPT A STAMPED ENGINEER LETTER OR STAMPED APPROVED SUBMITTAL . REST OK . | LIDO | LIDO | | H= | P | 6143574 |
M W MECHANICAL INC | H= | P | 03/18/2019 | RECEIVED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | P | 6135117 |
M W MECHANICAL INC | H= | P | 03/11/2019 | PARTIAL PENDING : STILL NEED REVISED/ APPROVED MECHANICAL EQUIPMENT SCHEDULE FOR ALL MECHANICAL EQUIPMENT / CARRIER ROOF TOPS INSTALLED INSTEAD OF TRANE / CARRIER MINI SPLIT INSTALLED INSTEAD OF MITSUBISHI / TWIN CITY EXHAUST FANS INSTEAD OF GREENHECK. NEED TEST AND BALANCE REPORT.(( ROOF CEILING PENETRATION FOR THE MED GAS ROOM OK PER THE 3M ENGINEER JUDGMENT LETTER. MED GAS DUCT FIRE WRAP OK.)) | LIDO | LIDO | | H= | P | 6130835 |
M W MECHANICAL INC | H= | P | 03/06/2019 | PARTIAL PENDING : THE WRONG TYPE OF SILICONE SEALANT ( 1000NS )WAS USED FOR THE ROOF CEILING PENETRATION FOR THE MED GAS ROOM , THE CORRECT SILICONE SEALANT IS ( FB-1003SL ) PER THE 3M ENGINEER JUDGMENT LETTER. BANDING FOR THE FIRE WRAP IS NOT INSTALLED PER THE 3M MANUFACTURE INSTALLATION INSTRUCTIONS / NEED TO RE-INSPECT FIRE WRAP AND PENETRATION PROTECTION FOR THE MED GAS ROOM . STILL NEED REVISED/ APPROVED MECHANICAL EQUIPMENT SCHEDULE FOR ALL MECHANICAL EQUIPMENT / CARRIER ROOF TOPS INSTALLED INSTEAD OF TRANE / CARRIER MINI SPLIT INSTALLED INSTEAD OF MITSUBISHI / TWIN CITY EXHAUST FANS INSTEAD OF GREENHECK. NEED TEST AND BALANCE REPORT.(ROOF OK ) | LIDO | LIDO | | H= | P | 6126128 |
M W MECHANICAL INC | HD | P | 03/04/2019 | MED GAS DUCT PENETRATION THROUGH FLUTED DECK ROOF ASSEMBLY OK / PROTECTED PER 3M ENGINEER DETAIL.. | LIDO | LIDO | | HD | P | 6123368 |
M W MECHANICAL INC | HD | P | 03/01/2019 | MED GAS ROOM VENTILATION : FRESH AIR AND EXHAUST DUCT OK / OK TO WRAP. FRESH AIR AND EXHAUST DROPS AND FIRE WRAP THROUGH CURBS ONLY OK / STILL NEED TO SEE FIRE WRAP FIRE STOP PROTECTION PER 3M ENGINEER LETTER THROUGH FLUTED DECK ROOF ASSEMBLY. | LIDO | LIDO | | HD | P | 6122177 |
M W MECHANICAL INC | HD | P | 02/28/2019 | NEED REVISED/ APPROVED MECHANICAL EQUIPMENT SCHEDULE FOR ALL MECHANICAL EQUIPMENT / CARRIER ROOF TOPS INSTALLED INSTEAD OF TRANE / CARRIER MINI SPLIT INSTALLED INSTEAD OF MITSUBISHI / TWIN CITY EXHAUST FANS INSTEAD OF GREENHECK. SLEEVES FOR MED GAS VENTILATION FRESH AIR AND EXHAUST DUCT THROUGH ROOF OK. | LIDO | LIDO | | HD | P | 6120703 |
M W MECHANICAL INC | HSP | P | 02/27/2019 | ON SITE CONSULT WITH MECHANICAL CONTRACTOR / WENT OVER MED GAS 3M FIRE WRAP ENGINEER LETTER FOR FIRE WRAP INSTALL WITH MECHANICAL INSTALLER. ( SLEEVES THROUGH ROOF ARE NOT READY TO BE INSPECTED) | LIDO | LIDO | | HSP | P | 6119363 |
M W MECHANICAL INC | HSP | P | 02/04/2019 | Had phone conference with Architect Brad McCullough . Went over the requirements for the Med gas room. A fire wrap detail from the manufacture for the penetration through the rated lid assembly and through the roof is required ,The details will need to show how the penetrations will be protected per the manufacture installation instruction detail. | LIDO | LIDO | | HSP | P | 6098792 |
M W MECHANICAL INC | HD | P | 01/30/2019 | ((TRAINING WITH BILL S 55 MINUTES.))NEED REVISED/APPROVED PLANS FOR RELOCATED EF-1 FROM ROOM 127 TO ROOM 105 / FAN AND DUCT INSTALL OK. MISSING RETURN AIR IN ROOM 112 . ALL THERMOSTATS NEED TO BE INSTALLED 48" OFF FINISHED FLOOR. NEED MED GAS VENTILATION DUCT INSTALLED AND INSPECTED / CONTRACTOR WILL NEED TO PROVIDE INSPECTOR THE INSTALLATION INSTRUCTION FOR FIRE WRAP. STILL NEED ROOF.NEED TEST AND BALANCE BY FINAL. EF-2,3,4,6,7 AND DUCT ROUGH OK, SUPPLY, RETURN, EXHAUST GRILLS AND REGISTERS FINAL CONNECTIONS OK. DRYER VENT OK. | LIDO | LIDO | | HD | P | 6093013 |
M W MECHANICAL INC | HD | P | 12/17/2018 | DRYER VENT INSTALLED BACKWARDS. RTU-3 : SUPPLY, RETURN AND BRANCH LINES OK/ OK TO WRAP. | LIDO | LIDO | | HD | P | 6055286 |
M W MECHANICAL INC | HC | C | 12/14/2018 | OK TO RELEASE METER . | LIDO | LIDO | | HC | C | 6053490 |
M W MECHANICAL INC | HI | P | 12/14/2018 | 10 lb TEST OK / INSTALLED PER PLAN .NEED TO SEE FINAL CONNECTIONS TO ROOF TOP EQUIPMENT. | LIDO | LIDO | | HI | P | 6053487 |
M W MECHANICAL INC | HD | P | 12/14/2018 | RTU-2 ONLY- RETURN AND SUPPLY ABOVE CEILING DUCT ROUGH OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6053481 |
M W MECHANICAL INC | HSP | P | 11/29/2018 | CONTRACTOR WILL NEED TO PROVIDE INSTALLATION INSTRUCTION FOR THE FIRE WRAP THAT WILL BE USED FOR THE MED GAS EXHAUST AND OUTSIDE AIR DUCT. REFER TO NOTE - 7 ON PLAN PAGE M101 (BDA 46) | LIDO | LIDO | | HSP | P | 6038827 |
M W MECHANICAL INC | HD | P | 11/28/2018 | CONTRACTOR INSTALLING GAS WILL NEED TO ATTACH TO PERMIT AND CALL FOR INSPECTIONS. RTU- 1 SUPPLY AND RETURN TRUNK LINES INSTALLED / SUPPLY BRANCH LINES INSTALLED / 12" RETURN AIR IS NOT COMPLETE. | LIDO | LIDO | | HD | P | 6036610 |
HOGAN MECHANICAL, INC. | P= | C | 03/06/2019 | R.P. irrigation backflow inside meter room | TED | TED | | P= | C | 6125762 |
HOGAN MECHANICAL, INC. | PTO | C | 02/28/2019 | correction made | TED | TED | | PTO | C | 6120407 |
HOGAN MECHANICAL, INC. | PTO | P | 02/13/2019 | material change letter to scanning | TED | TED | | PTO | P | 6105489 |
HOGAN MECHANICAL, INC. | PTO | P | 02/12/2019 | need plan spice for water entry room ( water for building and irrigation, sump drain and piping), need change letter for trap guards, note: dwv and water overhead ok | TED | TED | | PTO | P | 6105070 |
HOGAN MECHANICAL, INC. | PTO | P | 12/12/2018 | Need engineer approval on cellcore pvc for dwv and pex and copper for domestic water drawings show solid core pvc for dwv and cpvc for domestic water, support over head dwv and domestic water per code, need engineer splice on relocating water entry with floor drain to managers office - still need inspection on this, glue and anchor toilet flanges, rest ok dwv and domestic in walls. Note: at final check water heater and water entry. | DANR | DANR | | PTO | P | 6051227 |
HOGAN MECHANICAL, INC. | PTO | L | 12/07/2018 | Not ready re-inspect all. | DANR | DANR | | PTO | L | 6046517 |
HOGAN MECHANICAL, INC. | PB | P | 09/19/2018 | dwv correction made | TED | TED | | PB | P | 5969916 |
HOGAN MECHANICAL, INC. | PB | P | 09/18/2018 | need support on all 2'' over hanging drains to outer walls, note: test and design ok, 1'' copper water line under footer | TED | TED | | PB | P | 5968902 |
M W MECHANICAL INC | XMS | T | 03/19/2019 | PAID (REC#1583399) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 14 | DALEH | DALEH | | XMS | T | 6137183 |
HOGAN MECHANICAL, INC. | XPS | P | 02/21/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 2/21/19: Delta 11 revision water entry relocated. Delta 13 revisions floor drain installed for water entry and detail for lift station and discharge piping for floor drain. | SHANEN | SHANEN | | XPS | P | 6112744 |
HANNA DESIGN GROUP INC. | XBS | P | 02/20/2019 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Revised cover and specs. | SHELLEY | SHELLEY | | XBS | P | 6111668 |
M W MECHANICAL INC | XMS | T | 02/19/2019 | PAID (REC#1577729) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice for delta 7,11,12 | DALEH | DALEH | | XMS | T | 6111340 |
FOSTER ELECTRIC CORPORATION | XES | P | 02/19/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised location of EF-5. Moved EF-5 from MedGas closet to roof. | BERTHA | BERTHA | | XES | P | 6111244 |
FOSTER ELECTRIC CORPORATION | XES | T | 02/08/2019 | PAID (REC#1576550): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised panel schedule - removed monument sign. | BERTHA | BERTHA | | XES | T | 6102107 |
FOSTER ELECTRIC CORPORATION | XES | T | 01/22/2019 | PAID (REC#1574408): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added series rated combinations. | BERTHA | BERTHA | | XES | T | 6084626 |
HANNA DESIGN GROUP INC. | XBS | T | 01/18/2019 | PAID (REC#1570520) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Removed beam from scope, provided revised assembly for lid. Revised lid detail in NO2 room. | BPHILLIPS | BPHILLIPS | | XBS | T | 6082339 |