ELITE PROPERTIES OF AMERICA, INC. | B= | C | 03/03/2020 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6499155 |
ELITE PROPERTIES OF AMERICA, INC. | B= | P | 12/05/2019 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | BOBF | BOBF | | B= | P | 6418258 |
ELITE PROPERTIES OF AMERICA, INC. | B= | P | 11/19/2019 | need attic access at soffit in front of 2750 / need to seal wire penetration on north side of riser room on north elevation -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DANE | DANE | | B= | P | 6404775 |
ELITE PROPERTIES OF AMERICA, INC. | BIN | C | 11/19/2019 | | DANE | DANE | | BIN | C | 6404771 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | R | 10/25/2019 | No Contractor or superintendent on site - No inspection details provided | TIMOTHYS | TIMOTHYS | | BFR | R | 6380777 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | P | 10/25/2019 | Engineers inspection letter for welding and bolting on file | TIMOTHYS | TIMOTHYS | | BFR | P | 6380024 |
ELITE PROPERTIES OF AMERICA, INC. | BLA | P | 08/12/2019 | south elevation stucco lath OK | DANE | DANE | | BLA | P | 6297334 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | P | 07/31/2019 | Exterior furred light gauge steel framed walls and truss roof inspection OK. Need to splice truss drawings to plans - none on file. Paper copies of stamped truss drawings reviewed on site. | CHUCK | CHUCK | | BFR | P | 6283005 |
ELITE PROPERTIES OF AMERICA, INC. | BTR | C | 07/17/2019 | BTR OK. | CHUCK | CHUCK | | BTR | C | 6266893 |
ELITE PROPERTIES OF AMERICA, INC. | BTR | R | 07/15/2019 | No access to roof // Contractor will have ladder set and recall for new BTR inspection | CHAD | CHAD | | BTR | R | 6263315 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | C | 03/12/2019 | Engineer letter for foundation received -- Eufer noted / | BOBF | BOBF | | BFN | C | 6130960 |
ELITE PROPERTIES OF AMERICA, INC. | BFT | C | 03/12/2019 | Engineer letter for footing on file -- Open hole on file / | BOBF | BOBF | | BFT | C | 6130956 |
ELITE PROPERTIES OF AMERICA, INC. | BFI | C | 02/13/2019 | R10 installed / | BOBF | BOBF | | BFI | C | 6105540 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | P | 02/13/2019 | letter uploaded does not have an eng stamp on it, will need stamped letter to compete footing / open hole on file 2800# | BOBF | BOBF | | BFN | P | 6105539 |
ELITE PROPERTIES OF AMERICA, INC. | BFT | R | 02/13/2019 | letter uploaded does not have an eng stamp on it, will need stamped letter to compete footing | BOBF | BOBF | | BFT | R | 6105535 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | P | 12/03/2018 | Authorized 3rd party engineer inspection with all observation paperwork to follow | DANE | DANE | | BFN | P | 6041146 |
ELITE PROPERTIES OF AMERICA, INC. | BFT | P | 12/03/2018 | Authorized 3rd party engineer inspection with all observation paperwork to follow | DANE | DANE | | BFT | P | 6041095 |
ENCORE ELECTRIC, INC. | E= | C | 11/18/2019 | | RANDY | RANDY | | E= | C | 6402090 |
ENCORE ELECTRIC, INC. | E= | C | 11/18/2019 | FIRE ALARM INSPECTION: red card signed | RANDY | RANDY | | E= | C | 6402032 |
ENCORE ELECTRIC, INC. | ES | C | 09/24/2019 | Commercial Service: 800 amp service ok to energize, water bond made | BRET | BRET | | ES | C | 6346224 |
ENCORE ELECTRIC, INC. | ER | P | 09/09/2019 | FIRE ALARM INSPECTION: fire alarm cable to strobe south east corner | BRET | BRET | | ER | P | 6328307 |
ENCORE ELECTRIC, INC. | ER | P | 07/31/2019 | wall pack and roof receptacle cable rough ok | BRET | BRET | | ER | P | 6283513 |
ENCORE ELECTRIC, INC. | ER | R | 07/17/2019 | front soffit and columns | BRET | BRET | | ER | R | 6266561 |
ENCORE ELECTRIC, INC. | ES | P | 07/02/2019 | Commercial Service: 800 amp service ok to energize need meter set for house panel only, gec towater not made at this time | BRET | BRET | | ES | P | 6251705 |
ENCORE ELECTRIC, INC. | EUG | P | 06/06/2019 | ufer rebar encased in concrete | BRET | BRET | | EUG | P | 6222638 |
ENCORE ELECTRIC, INC. | EUG | P | 05/30/2019 | ufer rebar cannot be in contact with the earth | BRET | BRET | | EUG | P | 6215119 |
ENCORE ELECTRIC, INC. | EUG | P | 05/22/2019 | rebar in ground for ufer, trench collapsed take picture of trench prior to concrete pour. | BRET | BRET | | EUG | P | 6207271 |
ENCORE ELECTRIC, INC. | ES | R | 05/16/2019 | Rebar needs to at least 30" down and encased in 2" of concrete / | ROB | ROB | | ES | R | 6201727 |
ENCORE ELECTRIC, INC. | EUG | P | 03/04/2019 | secondary from transformer call csu for inspection. no ufer inspection prior to foundation pour | BRET | BRET | | EUG | P | 6123720 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 11/08/2019 | MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6393034 |
KAMPP-L ENTERPRISES, INC. | H= | C | 10/10/2019 | GAS FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6364510 |
KAMPP-L ENTERPRISES, INC. | HC | C | 10/10/2019 | OK TO SET TWO 2 LB METERS AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6364508 |
KAMPP-L ENTERPRISES, INC. | HI | C | 10/10/2019 | PIPING PER PLAN SPLICE. MEDIUM PRESSURE STICKERS IN PLACE. REGULATORS INSTALLED. | DUSTINS | DUSTINS | | HI | C | 6364507 |
KAMPP-L ENTERPRISES, INC. | HI | P | 09/27/2019 | NEED REVISED/APPROVED PLANS MATCHING WHAT WAS INSTALLED ON SITE AND CORRECT METER LOCATIONS. PLANS CALL FOR SEVEN METERS AND ONLY TWO ARE BEING INSTALLED AT NORTH WEST CORNER OF BUILDING. CAN NOT RELEASE METERS UNTIL PLANS ARE REVISED/APPROVED. THIS INSPECTION WAS FOR THE METER FOR 2754 ONLY. 38' OF 1" INSTALLED ON ROOF , 1/2 INSTALLED OFF THE END OF THE 1" TO 4 - RTU UNITS.10 LB TEST OK . ALL MEDIUM PRESSURE LABELS IN PLACE. NEED FINAL CONNECTIONS TO ALL EQUIPMENT BY FINAL. | LIDO | LIDO | | HI | P | 6350676 |
KAMPP-L ENTERPRISES, INC. | HI | P | 09/09/2019 | NEED REVISED/APPROVED PLANS MATCHING WHAT WAS INSTALLED ON SITE AND CORRECT METER LOCATIONS. PLANS CALL FOR SEVEN METERS AND ONLY TWO ARE BEING INSTALLED AT NORTH WEST CORNER OF BUILDING. CAN NOT RELEASE METERS UNTIL PLANS ARE REVISED/APPROVED. THIS INSPECTION WAS FOR THE METER FOR 2750 ONLY. 1" MEDIUM PRESSURE CONTINUATION FROM STUB AT ROOF TO TWO RTU'S. MEDIUM PRESSURE STICKERS IN PLACE. CHECK REGULATORS AT FINAL. | DUSTINS | DUSTINS | | HI | P | 6328284 |
KAMPP-L ENTERPRISES, INC. | HI | P | 08/22/2019 | NEED REVISED/APPROVED PLANS MATCHING WHAT WAS INSTALLED ON SITE AND CORRECT METER LOCATIONS. PLANS CALL FOR SEVEN METERS AND ONLY TWO ARE BEING INSTALLED AT NORTH WEST CORNER OF BUILDING. CAN NOT RELEASE METERS UNTIL PLANS ARE REVISED/APPROVED. TWO 1" MEDIUM PRESSURE GAS LINES FROM METER TO ROOF INSTALLED. TWO 10 LB TEST OK. | DUSTINS | DUSTINS | | HI | P | 6310276 |
KAMPP-L ENTERPRISES, INC. | P= | C | 10/21/2019 | | SAMH | SAMH | | P= | C | 6375402 |
KAMPP-L ENTERPRISES, INC. | P= | P | 10/17/2019 | need trap guard at water entry room, rest ok. | TAYLOR | TAYLOR | | P= | P | 6371734 |
KAMPP-L ENTERPRISES, INC. | PTO | C | 08/29/2019 | Need to add plan splice for 1" underground irrigation by final. | SAMH | SAMH | | PTO | C | 6319027 |
KAMPP-L ENTERPRISES, INC. | PRD | C | 08/22/2019 | | TAYLOR | TAYLOR | | PRD | C | 6310624 |
KAMPP-L ENTERPRISES, INC. | PRD | P | 07/03/2019 | **NEED TO add PRD and ORD to scope of work
**STILL NEED to see ord @ lambs tongue discharge point
rest ok for test / design @ prd / ord | JOHNS | JOHNS | | PRD | P | 6253034 |
KAMPP-L ENTERPRISES, INC. | PRD | P | 01/31/2019 | underground roof drain ok. | TAYLOR | TAYLOR | | PRD | P | 6093247 |
KAMPP-L ENTERPRISES, INC. | PB | C | 01/31/2019 | S.S. ok, revise plans plans for 1 inch underground irrigation line by final. | TAYLOR | TAYLOR | | PB | C | 6093228 |
KAMPP-L ENTERPRISES, INC. | PRD | L | 01/24/2019 | cancelled per contractor email | JOHNS | JOHNS | | PRD | L | 6086965 |
KAMPP-L ENTERPRISES, INC. | PB | P | 01/23/2019 | Underground Grease waste OK. Stub out 6" pipe, Add Splice for Grease trap location change. | SAMH | SAMH | | PB | P | 6085831 |
KAMPP-L ENTERPRISES, INC. | XPS | P | 10/10/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 10/10/19: Delta 3 revisions added 1" irrigation line P1.01 adjusted water entry detail, P1.02 adjusted plumbing plan | SHANEN | SHANEN | | XPS | P | 6364837 |
ELITE PROPERTIES OF AMERICA, INC. | XBS | T | 10/10/2019 | PAID (REC#1637364): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 6364472 |
ENCORE ELECTRIC, INC. | XES | T | 09/20/2019 | PAID (REC#1631884): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised plans to indicate service change - from 1200A to 800A | BERTHA | BERTHA | | XES | T | 6343464 |
KAMPP-L ENTERPRISES, INC. | XPS | T | 01/30/2019 | PAID (REC#1572876) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 1/30/19 : Delta 2 revisions : Domestic water entry relocated, grease interceptor relocated, relocated grease and waste line, added underground drains for future fixtures, relocated roof and overflow drains. | SHANEN | SHANEN | | XPS | T | 6092085 |