RAY - ECCHER SERVICES, LLC | B= | C | 12/12/2019 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 6426178 |
RAY - ECCHER SERVICES, LLC | B= | P | 12/10/2019 | Finished basement. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | NICK | NICK | | B= | P | 6423227 |
RAY - ECCHER SERVICES, LLC | BIN | C | 12/10/2019 | | NICK | NICK | | BIN | C | 6423219 |
RAY - ECCHER SERVICES, LLC | BFN | C | 12/10/2019 | Open hole states no drains required | NICK | NICK | | BFN | C | 6421895 |
RAY - ECCHER SERVICES, LLC | B= | T | 12/09/2019 | PAID (REC#1649185) AFTER-HOURS INSPECTION: $200 From: TERRI 12/10/19 4PM | TERRI | TERRI | | B= | T | 6420923 |
RAY - ECCHER SERVICES, LLC | BLA | C | 07/26/2019 | | NICK | NICK | | BLA | C | 6278599 |
RAY - ECCHER SERVICES, LLC | BIN | P | 07/02/2019 | Need to install air barrier at master bath tub location / All other insulation OK / Check attic at final | NICK | NICK | | BIN | P | 6251524 |
RAY - ECCHER SERVICES, LLC | BFR | C | 07/02/2019 | Eng on file for hold downs throughout / All frame items OK | NICK | NICK | | BFR | C | 6251501 |
RAY - ECCHER SERVICES, LLC | BSP | P | 06/27/2019 | All piers for decks OK per foundation design | NICK | NICK | | BSP | P | 6246263 |
RAY - ECCHER SERVICES, LLC | BFR | P | 06/17/2019 | Need to install LS70 clips at all tails of trusses to structural facia per splice / Still need to install HTS20 straps for girders throughout or provide Eng letter for use of flat straps / Still need inspection or Eng for nailing of F16 truss to roof decking 8" oc / All other items OK / Splice in for use of 5 2x6 post in place of steel post for girder at exterior wall location / OK to insulate | NICK | NICK | | BFR | P | 6233876 |
RAY - ECCHER SERVICES, LLC | BFR | R | 06/12/2019 | Coil straps installed in place of HTS20 straps throughout for girder trusses / Need to install A35 clips at 16" oc for F16 truss at interior shear wall / Need to inspect or provide letter for 8" oc nail of roof decking to F16 truss / Approved plans call for 3" steel column at exterior wall location for GG girder / Need to install bolts for 4 ply LVL at garage per BCI manual / Need to install strap at top of balloon frame wall / Need to open up soffit at East side of house to inspect framing per splice / Need to install nailing for portal frame per approved plans, 3" oc / Need to install straps on both sides of opening for portal frame walls per approved plans / Need Eng for non fully nailed HUS28 hangers throughout with not full bearing / Need to install angle bracing for lateral bracing installed over 20' in length at 45 degree angle spanning 3 trusses at D trusses / Still need to inspect post for porches and deck frames and piers need inspected / Need 3rd party observation for foundation drain / Need to dry in house, windows and doors | NICK | NICK | | BFR | R | 6229107 |
RAY - ECCHER SERVICES, LLC | BIN | P | 05/29/2019 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6213742 |
RAY - ECCHER SERVICES, LLC | BFN | P | 03/06/2019 | (2) interior pads OK per plans / still need to inspect exterior piers | RICHB | RICHB | | BFN | P | 6126042 |
RAY - ECCHER SERVICES, LLC | BFT | C | 01/09/2019 | Open Hole received - 2400 psf (matches foundation design), drain required at usable space, floating framing required | RICHB | RICHB | | BFT | C | 6072591 |
RAY - ECCHER SERVICES, LLC | BFN | P | 01/07/2019 | Formwork & reinforcement for all foundation walls OK per plans - (2) ufers observed / formwork & reinforcement for all interior pads EXCEPT (2) at North end (in Library) OK per plans - still need to inspect remaining (2) pads / still need Open Hole / still need to inspect exterior piers | RICHB | RICHB | | BFN | P | 6070006 |
RAY - ECCHER SERVICES, LLC | BFT | P | 12/17/2018 | Provide copy of soils and open hole reports / Interior pads and exterior piers not inspected at this time / Foundation design 2,400 psf / Reinforced footing forms okay / 2 ufers located on the north side | SHAUN | SHAUN | | BFT | P | 6055234 |
RAY - ECCHER SERVICES, LLC | E= | C | 12/10/2019 | | CRAIGS | CRAIGS | | E= | C | 6422550 |
RAY - ECCHER SERVICES, LLC | E= | R | 12/09/2019 | need afci thru out, bulbs in garage door openers to test gfci, all outside outlets are loose, master bath shades: need specs uploaded to permit and not installed yet, floor heat does not trip gfci on stat, need flex from stat to floor, all closets: can not have open cans, open small fixture in laundry hallway, open grd?some smokes no power, library outlets not working, 2 mech rms: need gfci and blocking over top of all horizontal nm cable, sub panel feeder connector is loose, a/c's: label with paint marker or brass tag to match panel schedule, 4 metal LB'S need to be grounded, | JOHNN | JOHNN | | E= | R | 6420708 |
RAY - ECCHER SERVICES, LLC | ES | C | 06/24/2019 | Residential Underground: new 200 amp, 3-wire, meter set okay | GARYL | GARYL | | ES | C | 6241947 |
RAY - ECCHER SERVICES, LLC | ER | C | 05/30/2019 | cen-vac installed, sub panel in basement okay, service not ready, will need to check ufer depending on location of main disconnect | GARYL | GARYL | | ER | C | 6214873 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 11/27/2019 | finished basement, 2 furnaces direct vent a/c x2 louver door | DAVIDH | DAVIDH | | H= | C | 6411652 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 05/29/2019 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 6213431 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 05/29/2019 | finished basement , a/c line set and coils x 2, direct vent furnaces x 2 , 2 water heaters | DAVIDH | DAVIDH | | HRR | C | 6213425 |
O.M.A.G.M., INC. | HI | C | 05/09/2019 | 10 lb test okay note 1 1/1/4" main 2, furnaces,2 water heater and 2 fireplaces | DAVIDH | DAVIDH | | HI | C | 6193765 |
FIREPLACE WAREHOUSE | HV | C | 05/07/2019 | note inspected 2 fireplaces 1 main level and 1 basement framing and vent | DAVIDH | DAVIDH | | HV | C | 6191373 |
RAY - ECCHER SERVICES, LLC | P= | C | 12/10/2019 | tempering at water heaters, no irrigation, finished basement. | TAYLOR | TAYLOR | | P= | C | 6422597 |
RAY - ECCHER SERVICES, LLC | P= | P | 12/09/2019 | Need following items. Tempering device for master tub, Shock arrestors at both kitchen dishwashers, Access panel for basement jack and jill tub drain, Backflow device or terminate Irrigation stub at mechanical room. Rest OK. | SAMH | SAMH | | P= | P | 6420525 |
RAY - ECCHER SERVICES, LLC | PTO | C | 06/05/2019 | Corrections made. Need access to slip joint waste and overflows at basement tubs at final. | SAMH | SAMH | | PTO | C | 6221578 |
RAY - ECCHER SERVICES, LLC | PTO | P | 06/03/2019 | Complete water, and set basement tubs. DWV OK. Note: VTR, AAV at kit prep sink and bar, Hub drain in kitchen cabinet, Finished basement, Irrigation does not stub out to exterior of structure. Verify mixing valve at master tub by final. | SAMH | SAMH | | PTO | P | 6217847 |
RAY - ECCHER SERVICES, LLC | PB | C | 03/04/2019 | | SAMH | SAMH | | PB | C | 6123850 |
RAY - ECCHER SERVICES, LLC | XBS | T | 06/13/2019 | PAID (REC#1606347) PLAN SPLICE FEE: $50 by: DANM for Construction: Framing revisions for non-balloon framed wall + support for roof overhang | DANM | DANM | | XBS | T | 6230690 |
RAY - ECCHER SERVICES, LLC | XBS | T | 04/15/2019 | PAID (REC#1590350) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised framing to eliminate steel column | LBENNETT | LBENNETT | | XBS | T | 6165973 |