BRYAN CONSTRUCTION, INC. | B= | C | 07/02/2020 | | TIMOTHYS | TIMOTHYS | | B= | C | 6626343 |
BRYAN CONSTRUCTION, INC. | BFN | P | 06/30/2020 | Open hole on file / Reinforced slab observation on file / Voided slab observation on file | TIMOTHYS | TIMOTHYS | | BFN | P | 6623082 |
BRYAN CONSTRUCTION, INC. | B= | R | 06/30/2020 | Still need to install grab bars for ambulatory stalls at Rock Mountain restrooms where toilet stalls or toilet stalls plus urinals exceed 6 / Still need 3rd party observations for structural elements in S sheets spliced in | TIMOTHYS | TIMOTHYS | | B= | R | 6623012 |
BRYAN CONSTRUCTION, INC. | B= | R | 01/16/2020 | Need horizontal grab bars for all restrooms to be install at 54" from end wall to end of grab bar / Need to install grab bars for ambulatory restrooms at men's and women's restrooms for rocky mountain restrooms / Need all 3rd party observations for structural elements of micopiles ect per S sheets spliced into plans / No new work done for rocky mountain/aspen ballrooms. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES DBA PLS MECHANICAL Mechanical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES DBA PLS MECHANICAL Plumbing Final Inspection is not Completed yet. | NICK | NICK | | B= | R | 6455268 |
BRYAN CONSTRUCTION, INC. | BFR | P | 08/02/2019 | Framing for rocky mountain restrooms OK per approved plans / Reviewed accessible elements | NICK | NICK | | BFR | P | 6287415 |
BRYAN CONSTRUCTION, INC. | BFR | P | 03/01/2019 | Framing for Fitness Center and Offices (see sheet I-153) OK pending other Roughs / discussed accessible elements | RICHB | RICHB | | BFR | P | 6122136 |
BRYAN CONSTRUCTION, INC. | BFR | R | 01/28/2019 | inspection called on wrong permit - should have been called on permit # M04999 | DANE | DANE | | BFR | R | 6249303 |
BRYAN CONSTRUCTION, INC. | BFR | P | 01/28/2019 | Aspen ballroom and restrooms / framing at restrooms and ballroom at drop ceilings and east wall OK pending other roughs / need to attach MEP permits and have comments input onto correct permit - inspection called in on permit L34078 / used paper plans as inspection called in on wrong permit / discussed accessible elements | DANE | DANE | | BFR | P | 6089727 |
BRYAN CONSTRUCTION, INC. | BSP | T | 05/30/2018 | PAID (REC#1503716) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Revised JRS -1-ADA restroom | SHELLEY | SHELLEY | | BSP | T | 6249267 |
ENCORE ELECTRIC, INC. | E= | C | 05/14/2019 | rocky mountain ball rooms A--- H rockrimmon ball room 3-4 first floor rest rooms aspen ball room all OK | CRAIGS | CRAIGS | | E= | C | 6199017 |
ENCORE ELECTRIC, INC. | EP | C | 05/08/2019 | panel lva--hva--and transformer OK | CRAIGS | CRAIGS | | EP | C | 6193253 |
ENCORE ELECTRIC, INC. | ER | P | 05/08/2019 | above ceiling in Admin and fitness | CRAIGS | CRAIGS | | ER | P | 6193141 |
ENCORE ELECTRIC, INC. | E= | P | 05/08/2019 | Admin and fitness | CRAIGS | CRAIGS | | E= | P | 6193111 |
GLOBAL FIRE & SAFETY, INC. | E= | C | 05/07/2019 | FIRE ALARM INSPECTION: ceilings okay, signed red card | GARYL | GARYL | | E= | C | 6190967 |
ENCORE ELECTRIC, INC. | ER | P | 03/01/2019 | Electrical wall rough ok, FA not complete,-------- do not close walls-------------- / all walls,ok | JOHNN | JOHNN | | ER | P | 6121032 |
ENCORE ELECTRIC, INC. | ER | P | 02/15/2019 | ceiling in Aspen ball room NEED FA attached | GARYL | GARYL | | ER | P | 6108550 |
ENCORE ELECTRIC, INC. | ER | R | 02/08/2019 | F/A not called in, NOTE! ceilings are okay marked/dated on EC prints | GARYL | GARYL | | ER | R | 6101482 |
ENCORE ELECTRIC, INC. | ER | P | 01/31/2019 | walls, see plans, Discussed accessibility requirements with contractor / need to attach FA permit. | JOHNN | JOHNN | | ER | P | 6093568 |
PIPE LINE SPECIALTIES INC. | H= | C | 02/05/2020 | ALL SA / RA / EXHAUST GRILLES AND CONTROLS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6474974 |
PIPE LINE SPECIALTIES INC. | H= | P | 02/03/2020 | TAB REPORT RECEIVED - STILL NEED OTHER ITEMS ADDRESSED | JERRYF | JERRYF | | H= | P | 6471713 |
PIPE LINE SPECIALTIES INC. | H= | P | 01/31/2020 | NEED LADDER TO ACCESS CEILING IN FITNESS ROOM AND ROOM 109 - STOPPED INSPECTION - | JERRYF | JERRYF | | H= | P | 6471500 |
PIPE LINE SPECIALTIES INC. | H= | P | 04/15/2019 | PARTIAL PENDING TAB REPORT FOR RESTROOMS 160 AND 161 ONLY - STILL NEED COMPLETE INSPECTION FOR ROOM 109 | JERRYF | JERRYF | | H= | P | 6166274 |
PIPE LINE SPECIALTIES INC. | HD | P | 03/01/2019 | THIS INSPECTION WAS FOR THE FOLLOWING - BALLROOM RESTROOMS - ABOVE CEILING SA / EXHAUST MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6122099 |
PIPE LINE SPECIALTIES INC. | P= | C | 02/07/2020 | | SAMH | SAMH | | P= | C | 6476437 |
PIPE LINE SPECIALTIES INC. | P= | P | 01/02/2020 | Need plan splice for Water pipe detail at rooms 160 and 161. And splice showing existing drinking fountains. Rest OK. | SAMH | SAMH | | P= | P | 6441178 |
PIPE LINE SPECIALTIES INC. | P= | P | 09/18/2019 | Lacking knee clearance at lavs in room 160 and 161, Drinking fountains do not match plans (pg 1-171), also lacking knee clearance at accessible drinking fountain, Accessible urinal exceeds 17" to rim, and lacks 30" opening, Need trap guards at floor drains, Need vacuum breaker at hose end valve in room 161. Complete PTO. | SAMH | SAMH | | P= | P | 6340230 |
PIPE LINE SPECIALTIES INC. | PTO | P | 07/31/2019 | Rooms 160 and 161 OK. Need plan splice for water pipe detail. | SAMH | SAMH | | PTO | P | 6284276 |
PIPE LINE SPECIALTIES INC. | P= | P | 07/31/2019 | Aspen ball restrooms OK. Still need to complete inspections for rooms 160 and 161. | SAMH | SAMH | | P= | P | 6284274 |
PIPE LINE SPECIALTIES INC. | P= | P | 07/08/2019 | need 16-18 inches from partition to center of toilet at mens aspen ball restroom, still need addition inspections for restrooms 160 and 161. | TAYLOR | TAYLOR | | P= | P | 6255367 |
PIPE LINE SPECIALTIES INC. | PTO | P | 07/08/2019 | still need PTO inspection for restrooms 160 and 161. | TAYLOR | TAYLOR | | PTO | P | 6255350 |
PIPE LINE SPECIALTIES INC. | P= | P | 06/28/2019 | Need to verify rough in inspection for rooms 160, and 161. | SAMH | SAMH | | P= | P | 6248725 |
PIPE LINE SPECIALTIES INC. | PTO | P | 02/01/2019 | Ok for dwv and domestic water Aspen ball restrooms room numbers 110 and 112, discussed accessible elements. | DANR | DANR | | PTO | P | 6095558 |
PIPE LINE SPECIALTIES INC. | PB | C | 01/11/2019 | **NEED TO REVISE PLANS TO SHOW 4 " TIE IN PLAN, PAGE P-101 GENERAL NOTE D STATES 6" TIE IN** rest ok for test / design @ Aspen Ball Room baths | JOHNS | JOHNS | | PB | C | 6249300 |
ENCORE ELECTRIC, INC. | XES | P | 03/21/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised electrical plans and one-line. New 75kva transformer. Verify 240.21 | BERTHA | BERTHA | | XES | P | 6140328 |
BRYAN CONSTRUCTION, INC. | XBS | P | 03/21/2019 | PLAN SPLICE FEE: $0 by: MICHAELA for Construction: Minor architectural revisions | MICHAELA | MICHAELA | | XBS | P | 6140206 |
PIPE LINE SPECIALTIES INC. | XPS | T | 03/19/2019 | PAID (REC#1584172) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 3/19/19: Delta 2 revisions see notes 11, 12, and 13. | SHANEN | SHANEN | | XPS | T | 6137133 |
BRYAN CONSTRUCTION, INC. | XBS | T | 01/17/2019 | PAID (REC#1570344) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add micro piles | MICHAELA | MICHAELA | | XBS | T | 6081575 |
ENCORE ELECTRIC, INC. | XES | T | 12/10/2018 | PAID (REC#1562382) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added scope. Level 3 power plan - receptacle relocations. | BERTHA | BERTHA | | XES | T | 6249287 |
ENCORE ELECTRIC, INC. | XES | T | 11/29/2018 | PAID (REC#1559917) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add fourth for | SHELBY | SHELBY | | XES | T | 6249283 |
PIPE LINE SPECIALTIES INC. | XPS | P | 11/13/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 11-13-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 6249276 |
BRYAN CONSTRUCTION, INC. | XBS | T | 11/13/2018 | PAID (REC#1555849) PLAN SPLICE FEE: $50 by: DANM for Construction: Changing some bathtubs to showers throughout the entire project | DANM | DANM | | XBS | T | 6249275 |
ENCORE ELECTRIC, INC. | XES | T | 11/05/2018 | PAID (REC#1553672) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added Level 5 Power Plan to scope. | BERTHA | BERTHA | | XES | T | 6249271 |
ENCORE ELECTRIC, INC. | XES | T | 04/26/2018 | PAID (REC#1496496) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Relocated receptacles. | BERTHA | BERTHA | | XES | T | 6249259 |
ENCORE ELECTRIC, INC. | XES | T | 03/01/2018 | PAID (REC#1484919) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added scope for Level 6. Relocated receptacles. | BERTHA | BERTHA | | XES | T | 6249245 |
BRYAN CONSTRUCTION, INC. | XBS | T | 02/12/2018 | PAID (REC#1481488) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Accessibility modifications | MICHAELA | MICHAELA | | XBS | T | 6249240 |
ENCORE ELECTRIC, INC. | XES | T | 02/07/2018 | PAID (REC#1480725) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added electrical scope for level 7 and level 8. | BERTHA | BERTHA | | XES | T | 6249236 |
ENCORE ELECTRIC, INC. | XBS | T | 02/06/2018 | PAID (REC#1480593) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revised scope of work to include construction | MICHAELA | MICHAELA | | XBS | T | 6249235 |
PIPE LINE SPECIALTIES INC. | XPS | P | 02/06/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 2-6-2018 | TCRIPPEN | TCRIPPEN | | XPS | P | 6249234 |