THE COPESTONE COMPANY | B= | C | 06/25/2019 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6244031 |
THE COPESTONE COMPANY | B= | P | 06/05/2019 | pending H=/correction complete. Additional Inspections Required (computer generated): MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6221084 |
THE COPESTONE COMPANY | B= | P | 06/04/2019 | Temp CO: Temp CO: ( Expires: 7/4/2019 12:00:00 AM) | ROSE | ROSE | | B= | P | 6219781 |
THE COPESTONE COMPANY | B= | P | 05/07/2019 | Temp CO: need mech and building ( Expires: 6/6/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6191409 |
THE COPESTONE COMPANY | B= | P | 04/26/2019 | complete other finals -- complete guard on roof per splice submitted -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, ALPHALETE MECHANICAL LLC Mechanical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6180069 |
THE COPESTONE COMPANY | BSP | P | 03/01/2019 | Training with Brain B on light gage steel framing / Code study / Construction types / Accessible elements of restrooms and service counter / Panic hardware at exit per 1010.1.10 2015 IBC / plan reading / Code interpretation and application | JUSTINL | JUSTINL | | BSP | P | 6122173 |
THE COPESTONE COMPANY | BFR | P | 03/01/2019 | observed light gauge stl wall and soffit frame / need to complete other rough inspections including mech inspections for hood wall / reviewed accessible elements with the site superintendent / Training with PPRBD inspector Justin / IIB construction / A-2 occupancy / 56 oc load / reviewed approved design - sticker, wall types on design, and went over accessible elements in restrooms and at sales counter / also discussed 1010.1.10 panic hardware and fire exit hardware | BRIANB | BRIANB | | BFR | P | 6122172 |
FOSTER ELECTRIC CORPORATION | E= | C | 04/25/2019 | Electrical complete / | ROB | ROB | | E= | C | 6178411 |
FOSTER ELECTRIC CORPORATION | E= | R | 04/24/2019 | KEF-1 AND 2 need to be 15 amp breakers-----WR gfci on roof and filler plate-----lock for sign | RANDY | RANDY | | E= | R | 6177175 |
FOSTER ELECTRIC CORPORATION | E= | P | 04/17/2019 | still need to look at rooftop, pendant lights, ansul system, check the 3 outlets behind cooking equipment next inspection | RANDY | RANDY | | E= | P | 6169172 |
FOSTER ELECTRIC CORPORATION | E= | R | 04/11/2019 | Not ready for final yet / | ROB | ROB | | E= | R | 6162759 |
FOSTER ELECTRIC CORPORATION | ER | P | 04/11/2019 | Rough for all grid ceilings ok / | ROB | ROB | | ER | P | 6162751 |
FOSTER ELECTRIC CORPORATION | ER | P | 03/08/2019 | ER for 1 wall and soffit ok / Highlited and dated print / | ROB | ROB | | ER | P | 6127796 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/27/2019 | All walls okay to rock except walls with panel "A" and panel "B"----Panel "B" needs to be relocated as it currently is installed where a walk-in cooler will be. | CHIPO | CHIPO | | ER | P | 6118984 |
FOSTER ELECTRIC CORPORATION | EUG | P | 02/13/2019 | 20' 3/4" pvc from wall to island in kitchen ok / | ROB | ROB | | EUG | P | 6105838 |
MAUI MECHANICAL, INC. | H= | C | 06/25/2019 | ADDED HEAT FINAL AT CONTRACTORS REQUEST ( MAUI MECHANICAL ). RECEIVED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6244030 |
MAUI MECHANICAL, INC. | H= | P | 06/21/2019 | REMOTE SMOKE INDICATOR INSTALLED ( SEE IMAGES ). STILL NEED REVISED TEST AND BALANCE REPORT, OR STAMPED ENGINEER LETTER APPROVING THE READINGS . REFER TO NOTES DATED 5/28/19 | LIDO | LIDO | | H= | P | 6238894 |
MAUI MECHANICAL, INC. | H= | P | 05/28/2019 | MECHANICAL FINAL OK PENDING: STILL NEED REMOTE INDICATOR INSTALLED AND REVISED TEST AND BALANCE REPORT OR APPROVED BY ENGINEER. | DUSTINS | DUSTINS | | H= | P | 6211860 |
MAUI MECHANICAL, INC. | H= | P | 05/28/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MULTIPLE SUPPLY READINGS ARE OUTSIDE +/- 10% ALLOWABLE READINGS. NO OUTSIDE AIR READINGS IN REPORT. TAB SHOWS REQUIRED CFM FOR MULTIPLE SUPPLY ARE LOWER THAN THE PLAN CALLS FOR. NEED REVISED TEST AND BALANCE REPORT WITH PROPER READINGS AND REQUIRED CFM OR HAVE ENGINEER APPROVE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6211320 |
ALPHALETE MECHANICAL LLC | H= | C | 05/01/2019 | HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6184596 |
ALPHALETE MECHANICAL LLC | H= | P | 04/26/2019 | PARTIAL PENDING : SUPPORT WATER HEATER VENT AND INTAKE 1 FOOT FROM TANK AND EVERY 4 FEET AFTER. WATER HEATER CONCENTRIC VENT TERMINATION NEEDS TO BE 12" MINIMUM OF ROOF SURFACE , NEED TO COMPLETE CONDENSATE DISPOSAL FOR WATER HEATER , GAS REGULATOR IN KITCHEN FOR COOK LINE AND WATER HEATER - WHEN USING A VENT LIMITER MUST BE INSTALLED HORIZONTAL . | LIDO | LIDO | | H= | P | 6180182 |
MAUI MECHANICAL, INC. | H= | P | 04/25/2019 | PARTIAL PENDING : MAKE UP AIR UNIT IS LESS THAN 10 FEET FROM ROOF PARAPET THAT IS LESS THAN 42" HIGH / THIS WILL REQUIRE A GUARD RAIL , DETAILED SPLICE FROM THE ENGINEER FOR GUARD RAIL HAS BEEN APPROVED BY PLANS AND REVIEW, WILL NEED TO BE INSPECTED BY BUILDING AFTER INSTALL. MISSING REMOTE SMOKE INDICATOR ( LED). NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6178796 |
MAUI MECHANICAL, INC. | H= | P | 04/24/2019 | PARTIAL PENDING : MAKE UP AIR UNIT IS LESS THAN 10 FEET FROM ROOF PARAPET THAT IS LESS THAN 42" HIGH / THIS WILL REQUIRE A GUARD RAIL , WILL NEED A DETAILED SPLICE FROM THE ENGINEER AND SPLICE WILL NEED TO GO THROUGH PLANS AND REVIEW FOR APPROVAL , GUARD RAIL WILL NEED TO BE INSPECTED BY BUILDING / REFER TO 2015 IFGC CODE SECTION 306.6 . RTU-1B WILL NEED OUTSIDE AIR OR ECONOMIZER INSTALLED, KEF-2 IS MISSING THE FIRE ROPE. RTU-1A IS NOT INTER -LOCKED WITH KITCHEN HOOD-1 AND 2, NEED DOOR TO OFFICE IN KITCHEN UNDER CUT FOR RETURN AIR PASSAGE, THERMOSTATS NEEDS TO BE 48" TO THE TOP OFF FINISHED FLOOR.
| LIDO | LIDO | | H= | P | 6177353 |
MAUI MECHANICAL, INC. | HD | P | 04/19/2019 | NOT READY / FIELD CANCELED BY MECHANICAL CONTRACTOR | LIDO | LIDO | | HD | P | 6171967 |
ALPHALETE MECHANICAL LLC | HC | C | 04/10/2019 | 772 k ADDED TO EXISTING MEDIUM GAS METER. | LIDO | LIDO | | HC | C | 6160917 |
ALPHALETE MECHANICAL LLC | HI | P | 04/09/2019 | (NOT ALLOWED TO USE BRASS LIMITERS FOR OUTSIDE GAS REGULATORS ON ROOF/ NEED TO RE- INSPECT REGULATORS ON ROOF, NEED TO ADD ONE GAS OUTLET TO THE SCOPE OF WORK MAKING IT A TOTAL OF SIX ) STILL NEED FINAL CONNECTIONS AND REGULATORS FOR WATER HEATER AND COOK-LINE WITH RESTRAINTS IN PLACE. NEED WATER HEATER VENT . 10 lb TEST OK , GAS INSTALLED PER PLAN .FINAL CONNECTION CONNECTION TO ROOF EQUIPMENT OK . | LIDO | LIDO | | HI | P | 6160270 |
MAUI MECHANICAL, INC. | HSP | P | 04/08/2019 | RECEIVED CAPTIVE AIR LETTER APPROVING THE TYPE-1 KITCHEN HOOD EXHAUST RISER BEING RELOCATED. ( SEE IMAGES ) | LIDO | LIDO | | HSP | P | 6158100 |
MAUI MECHANICAL, INC. | HD | P | 04/05/2019 | (20 X 18 MAKE UP AIR DUCT INSTALLED / PLANS SHOW 26X18 DUCT TO BE INSTALLED , 10" DUCT INSTALLED FOR DISH WASHER HOOD EXHAUST / PLAN SHOWS 10 X 10 TO BE INSTALLED -INSTALL PER PLAN OR HAVE PLANS REVISED /APPROVED.) NEED KITCHEN HOOD INTERLOCKS. NEED ITEMS ADDRESSED FROM INSPECTION NOTES DATED 4/3/19 . NEED TEST AND BALANCE REPORT BY FINAL. KITCHEN HOOD OK. RTU- 1B - ABOVE CEILING DUCT ROUGH AND GRILLS AND REGISTER FINAL CONNECTIONS OK .GREASE DUCT OK. | LIDO | LIDO | | HD | P | 6157262 |
ALNOR INC. | H= | C | 04/05/2019 | WALK IN COOLER/ FREEZER OK. NOTES: SELF CONTAINED UNITS | LIDO | LIDO | | H= | C | 6157231 |
MAUI MECHANICAL, INC. | HD | P | 04/03/2019 | TYPE 1 KITCHEN HOOD EXHAUST RISER WAS REMOVED AND RELOCATED ON HOOD / NEED TO RESEARCH THIS /WILL ADD TO NOTES AFTER. NEED CONTRACTOR INSTALLING GAS PIPING AND WATER HEATER VENT ATTACHED TO PERMIT. PLANS SHOW EXISTING TRANE ROOF TOP UNIT AND NEW TRANE ROOF TOP UNIT / THE EXISTING UNIT IT A LENNOX AND THE NEW UNIT IS A CARRIER - NEED REVISED / APPROVED EQUIPMENT SCHEDULE OR ENGINEERED APPROVED SUBMITTALS. GREASE DUCT EXHAUST RISER FOR KITCHEN HOOD LIGHT TEST HAS ONE HOLE . NEED SECOND LAYER OF PRE-MANUFACTURED GREASE DUCT COMPLETED AT TOP OF HOOD CONNECTION / REST OF GREASE DUCT OK. MAKE UP AIR UNIT IS LESS THAN 10 FEET FROM ROOF PARAPET THAT IS LESS THAN 42" HIGH / THIS WILL REQUIRE A GUARD RAIL , WILL NEED A DETAILED SPLICE FROM THE ENGINEER AND SPLICE WILL NEED TO GO THROUGH PLANS AND REVIEW FOR APPROVAL , GUARD RAIL WILL NEED TO BE INSPECTED BY BUILDING / REFER TO 2015 IFGC CODE SECTION 306.6 . RTU-1 ABOVE CEILING SUPPLY, RETURN DUCT ROUGH OK . EXHAUST DUCT ROUGH ABOVE BATHROOM HARD LIDS OK | LIDO | LIDO | | HD | P | 6154385 |
MAUI MECHANICAL, INC. | HD | P | 03/19/2019 | NEED CONTRACTOR INSTALLING WATER HEATER VENT AND INSTALLING GAS PIPING TO ATTACH TO PERMIT. RTU-1 INSPECTION ; MISSING DUCT DETECTOR .ABOVE CEILING SUPPLY AND RETURN DUCT ROUGH OK / OK TO WRAP. TYPE 1 HOOD WALL OK . | LIDO | LIDO | | HD | P | 6137152 |
ALPHALETE MECHANICAL LLC | P= | C | 04/26/2019 | tenant finish | TED | TED | | P= | C | 6179481 |
ALPHALETE MECHANICAL LLC | PTO | C | 04/02/2019 | insulation ok, will check R.T.U. fill and drain down at final, check water heater connections at final | TED | TED | | PTO | C | 6152174 |
ALPHALETE MECHANICAL LLC | PTO | P | 03/04/2019 | still need to insulate water piping, note: dwv and water in walls and ceiling ok | TED | TED | | PTO | P | 6123208 |
ALPHALETE MECHANICAL LLC | PB | P | 02/12/2019 | need plan splice for future grease and sanitary stubs run into unit 160, note: test and design ok | TED | TED | | PB | P | 6105128 |
THE COPESTONE COMPANY | XBS | T | 04/25/2019 | PAID (REC#1593327) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added guard to rooftop around mechanical equipment | LBENNETT | LBENNETT | | XBS | T | 6177587 |
ALNOR INC. | XMS | T | 04/11/2019 | PAID (REC#1593325) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised grease duct and RTU schedule | JUSTINC | JUSTINC | | XMS | T | 6162951 |