CMG CORP | B= | C | 06/07/2019 | | SCOTTS | SCOTTS | | B= | C | 6224435 |
CMG CORP | B= | P | 05/17/2019 | flush controls in women's bathroom not on open side of compartment -- complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ALPHALETE MECHANICAL LLC Plumbing Final Inspection is not Completed yet, INTERMOUNTAIN POWER SERVICES INC Electrical Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6203087 |
CMG CORP | BFR | P | 04/02/2019 | framing per plan -- Reviewed Accessible Elements / | SCOTTS | SCOTTS | | BFR | P | 6152624 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 06/04/2019 | UL listed lights okay | CHIPO | CHIPO | | E= | C | 6218861 |
INTERMOUNTAIN POWER SERVICES INC | E= | P | 05/14/2019 | Need UL listing information on "Gas Pipe" light fixtures to final-----all else okay | CHIPO | CHIPO | | E= | P | 6199078 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 03/29/2019 | Rough complete for walls complete / | ROB | ROB | | ER | P | 6148927 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 03/26/2019 | Wall rough ok except bar / | ROB | ROB | | ER | P | 6145147 |
INTERMOUNTAIN POWER SERVICES INC | ESL | C | 03/08/2019 | EUG for bar ok / 1-3/4" PVC / | ROB | ROB | | ESL | C | 6127812 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/04/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES) | LIDO | LIDO | | H= | C | 6218820 |
ALNOR INC. | H= | C | 05/14/2019 | | LIDO | LIDO | | H= | C | 6199080 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 05/14/2019 | PARTIAL PENDING: NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6199050 |
ALNOR INC. | H= | P | 05/10/2019 | PARTIAL PENDING: NEED ROOF ACCESS. | LIDO | LIDO | | H= | P | 6195723 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 05/10/2019 | PARTIAL PENDING: NEED ROOF ACCESS AND TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6195719 |
ALNOR INC. | HRP | C | 05/02/2019 | 125LB TEST OK FOR WALK-IN COOLER LINESET | BILLS | BILLS | | HRP | C | 6185611 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/08/2019 | AFTER FURTHER REVIEW A REVISED/ APPROVED EQUIPMENT SCHEDULE OR ENGINEER APPROVED SUBMITTAL WILL NOT BE REQUIRED FOR EXISTING ROOF TOP UNIT. | LIDO | LIDO | | HD | P | 6159469 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/03/2019 | PLAN SHOWS EXISTING CARRIER ROOFTOP UNIT / THE EXISTING ROOF TOP UNIT IS A LENNOX - NEED A REVISED/ APPROVED EQUIPMENT SCHEDULE OR AN ENGINEER APPROVED SUBMITTAL. ((ALL ABOVE CEILING DUCT ROUGH OK.ALL EXHAUST FANS OK .)) NEED TEST AND BALANCE REPORT BY FINAL. | LIDO | LIDO | | HD | P | 6154333 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | L | 04/02/2019 | SUITE LOCKED, NO ACCESS. | DUSTINS | DUSTINS | | HD | L | 6152926 |
ALPHALETE MECHANICAL LLC | P= | C | 06/04/2019 | correction made | TED | TED | | P= | C | 6219695 |
ALPHALETE MECHANICAL LLC | P= | P | 05/21/2019 | need water hammer on dish washer supply | TED | TED | | P= | P | 6206067 |
ALPHALETE MECHANICAL LLC | P= | P | 05/14/2019 | install dish washer, rest ok | TED | TED | | P= | P | 6198049 |
ALPHALETE MECHANICAL LLC | PTO | C | 04/03/2019 | AAV at bar in wall ( x2 ), Check water heater and VTR clearance at final. | SAMH | SAMH | | PTO | C | 6153569 |
ALPHALETE MECHANICAL LLC | PTO | P | 04/02/2019 | field cancel | TED | TED | | PTO | P | 6152165 |
ALPHALETE MECHANICAL LLC | PB | C | 03/08/2019 | sanitary and grease test and design ok, water looped under floor to front ok | TED | TED | | PB | C | 6128745 |