PEAK PROFESSIONAL CONTRS INC | B= | C | 08/15/2019 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6302693 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 07/08/2019 | complete other finals/rest ok. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, GRANT DRUMMOND II Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6256077 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 05/24/2019 | all interior light gauge framing is OK pending other roughs / discussed accessible elements | DANE | DANE | | BFR | P | 6209698 |
EL PASO ELECTRIC, LLC. | E= | C | 08/02/2019 | Electrical complete / | ROB | ROB | | E= | C | 6286642 |
EL PASO ELECTRIC, LLC. | E= | R | 08/01/2019 | Need pic of fuse showing if it is RK5 or RK1 / If it is RK1 the label installed on disconnect has to be permanent label as shown below first paragraph of handout / | ROB | ROB | | E= | R | 6284522 |
EL PASO ELECTRIC, LLC. | E= | R | 07/29/2019 | Need to submit letter and label disconnects per handout / | ROB | ROB | | E= | R | 6279379 |
EL PASO ELECTRIC, LLC. | E= | P | 07/22/2019 | Pics ok / Need Ty Handles and info for RTU's / | ROB | ROB | | E= | P | 6271314 |
EL PASO ELECTRIC, LLC. | E= | P | 07/17/2019 | Need pics of cooler and freezer nameplates /Need handle ty's for 3 breakers / | ROB | ROB | | E= | P | 6267136 |
EL PASO ELECTRIC, LLC. | E= | P | 07/03/2019 | Need handle ty's on 3 breakers /Need GFCI protection for all kitchen receptacles 120 and 220 volt /Need pics of nameplates for cooler and freezer / Need fault current at RTU'S / | ROB | ROB | | E= | P | 6253042 |
EL PASO ELECTRIC, LLC. | ER | P | 06/20/2019 | Dining area and front kitchen area grid ceiling ok / | ROB | ROB | | ER | P | 6238026 |
EL PASO ELECTRIC, LLC. | ER | P | 06/12/2019 | NOTE: Pull box for feeders need to be minimum 20" / | ROB | ROB | | ER | P | 6228998 |
EL PASO ELECTRIC, LLC. | ES | C | 06/12/2019 | Commercial Service: 200 amp 4 wire / Ok to set meter / | ROB | ROB | | ES | C | 6228991 |
EL PASO ELECTRIC, LLC. | ER | P | 05/23/2019 | Rough for walls ok / | ROB | ROB | | ER | P | 6208390 |
EL PASO ELECTRIC, LLC. | ER | P | 05/09/2019 | Rough ok for north and south demising walls / | ROB | ROB | | ER | P | 6194033 |
DRUMMOND PLUMBING LLC | H= | C | 08/15/2019 | HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6302692 |
DRUMMOND PLUMBING LLC | H= | P | 07/17/2019 | (RISER ROOM LOCKED NO ACCESS TO ROOF. )SPLICE DOCUMENT IN THE SYSTEM IS NOT STAMPED BY THE (PE) PROFESSIONAL ENGINEER / SPLICE DOCUMENT WILL NEED TO BE STAMPED BY THE PROFESSIONAL ENGINEER AND THEN GO THROUGH PLANS AND REVIEW FOR APPROVAL. GAS CONTRACTOR CHANGED GAS TO MEDIUM PRESSURE /GAS SPICE WILL NEED TO CLARIFY THE GAS PRESSURE FOR THE TENANT SPACE AND SHOW THE CORRECT LOCATION FOR THE REGULATOR, PLEASE COMMUNICATE WITH THE GAS CONTRACTOR FOR INSTALL INFORMATION. (STILL NEED TO SEE FINAL CONNECTIONS AND REGULATORS.) | LIDO | LIDO | | H= | P | 6267516 |
AIRTECH MECHANICAL, INC. | H= | C | 07/16/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6264453 |
AIRTECH MECHANICAL, INC. | H= | P | 07/11/2019 | WALK IN COOLER AND FREEZER ARE (SELF CONTAINED.) PARTIAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6261005 |
DRUMMOND PLUMBING LLC | HI | P | 06/27/2019 | BEFORE I CAN RELEASE THE METER NEED THE PLANS REVISED TO SHOW GAS IS NOW A 2 lb SYSTEM . 10lb TEST OK . NEED REGULATORS AND FINAL CONNECTION TO ROOF TOPS . NEED 2 LB APPROVAL LETTER FOR THIS TENANT SPACE BY FINAL. | LIDO | LIDO | | HI | P | 6246882 |
AIRTECH MECHANICAL, INC. | H= | P | 06/18/2019 | NEED GAS AND REFRIGERATION CONTRACTOR TO ATTACH TO PERMIT. NEED ALL THERMOSTATS AND THE REMOTE SMOKE INDICATOR FOR RTU-1 INSTALLED . NEED TO COMPLETE RTU-2 INSTALL ON ROOF / EXHAUST RISER IS LESS THAN 10ft FROM A MAKE UP AIR UNIT INTAKE.DUCT DETECTOR INSTALLED IN RTU-1. ALL SUPPLY, RETURN AND EXHAUST GRILLS AND REGISTER FINAL CONNECTIONS OK . ( NEED TEST AND BALANCE REPORT.) | LIDO | LIDO | | H= | P | 6235348 |
AIRTECH MECHANICAL, INC. | HD | P | 05/28/2019 | NEED GAS CONTRACTOR TO ATTACH TO PERMIT. DID NOT SEE DUCT DETECTOR IN DUCT, IS SMOKE DETECTOR INTERNALLY MOUNTED IN RTU-1? SUPPLY/RETURN/EXHAUST MAIN TRUNKS AND LATERALS OK, OK TO WRAP. FLEX INSTALLED BUT NO DIFFUSERS. NO ROOF TODAY. | DUSTINS | DUSTINS | | HD | P | 6211932 |
AIRTECH MECHANICAL, INC. | HD | P | 05/24/2019 | LOCKED NO ACCESS. NO DOOR CODE GIVEN. CALLED CONTRACTOR NO ANSWER LEFT MESSAGE. | LIDO | LIDO | | HD | P | 6210845 |
DRUMMOND PLUMBING LLC | P= | C | 07/02/2019 | tenant finish | TED | TED | | P= | C | 6251809 |
DRUMMOND PLUMBING LLC | PTO | C | 05/23/2019 | check water heater connections at final | TED | TED | | PTO | C | 6208940 |
DRUMMOND PLUMBING LLC | PB | P | 05/03/2019 | pending review of grease trap installation instructions. | JOEL | JOEL | | PB | P | 6187367 |
DRUMMOND PLUMBING LLC | XMS | T | 08/13/2019 | PAID (REC#1621870) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: adding press. regs | DALEH | DALEH | | XMS | T | 6298593 |
DRUMMOND PLUMBING LLC | XMS | T | 07/11/2019 | PAID (REC#1613498) PLAN SPLICE FEE: $50 by: SHANEN for Mechanical: Revised to show gas regs | SHANEN | SHANEN | | XMS | T | 6260889 |