ART C KLEIN CONSTRUCTION, INC. | B= | C | 06/24/2020 | All other required Final inspections are complete. (This is a computer generated result) | TIMOTHYS | TIMOTHYS | | B= | C | 6615961 |
ART C KLEIN CONSTRUCTION, INC. | B= | P | 05/29/2020 | Complete MEP finals / Complete outside finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | P | 6587562 |
ART C KLEIN CONSTRUCTION, INC. | B= | P | 05/28/2020 | Complete MEP finals / Complete outside finals / Provide manufacturers installation instructions including clearance to combustibles for smoker on patio -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | P | 6586503 |
ART C KLEIN CONSTRUCTION, INC. | B= | P | 05/21/2020 | Complete pending MEP final inspections and all outside final inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet. UPDATE: 5/27/20 Still need to look at solid fuel burning smoker on patio, please recall building final inspection after MEP and outside finals are complete | TIMOTHYS | TIMOTHYS | | B= | P | 6580154 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 02/19/2020 | All insulation in kitchen area OK | NICK | NICK | | BIN | P | 6486104 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 01/16/2020 | Exterior wall insulation for dining area OK other than section next to gift shop | NICK | NICK | | BIN | P | 6455552 |
ART C KLEIN CONSTRUCTION, INC. | BSP | P | 01/10/2020 | Lath for 2 interior fire places OK | NICK | NICK | | BSP | P | 6449769 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 12/20/2019 | Clearances for both wood burning fireplaces OK and for venting | NICK | NICK | | BFR | P | 6434081 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 12/20/2019 | All exterior rigid insulation OK | NICK | NICK | | BIN | P | 6434072 |
ART C KLEIN CONSTRUCTION, INC. | BSP | P | 12/17/2019 | Eng for welding/bolting on file | NICK | NICK | | BSP | P | 6429217 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 12/09/2019 | Insulation for exterior walls of restrooms OK | NICK | NICK | | BIN | P | 6420891 |
ART C KLEIN CONSTRUCTION, INC. | BFT | C | 12/06/2019 | Open hole on file for east and west portions of building / #2400psf / No drain required per soils | NICK | NICK | | BFT | C | 6418398 |
ART C KLEIN CONSTRUCTION, INC. | BFN | C | 12/06/2019 | Eng letter of observation on file for footing/foundation/ufer | NICK | NICK | | BFN | C | 6418393 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 12/05/2019 | Gift shop exterior wall insulation OK / Missing insulation in mens and womens restrooms exterior walls / Still need insulation at rim in kitchen exterior walls | NICK | NICK | | BIN | P | 6417735 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 12/05/2019 | All interior light gage framing OK for rest rooms/gift shop/kitchen/fireplaces/mechanical room / All exterior porch framing OK / Need welding/bolting observation for structural elements / Reviewed need with contractor for 3rd party observations for footing/foundation | NICK | NICK | | BFR | P | 6417734 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 12/03/2019 | Exterior wall insulation OK for kitchen area only / Still need to install insulation in rim of exterior at kitchen / Still need frame inspection for interior framing and for exterior porch framing | NICK | NICK | | BIN | P | 6414884 |
ART C KLEIN CONSTRUCTION, INC. | BSP | T | 11/15/2019 | PAID (REC#1644918) ADDITIONAL PLAN REVIEW TIME: $50 From: BECKYA Adding Splice fee for Justin | BECKYA | BECKYA | | BSP | T | 6401505 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 10/31/2019 | Floor rigid insulation in dining area OK / Exterior rigid insulation OK | NICK | NICK | | BIN | P | 6384643 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 10/16/2019 | Steel stud framing in dining area over steel beam OK per approved plans at garage door locations | NICK | NICK | | BFR | P | 6370265 |
ART C KLEIN CONSTRUCTION, INC. | BSP | P | 10/16/2019 | Exterior shear OK per approved plans / Walked restrooms with contractor and reviewed accessible elements / Still need 3rd party observation for footing/foundation | NICK | NICK | | BSP | P | 6370264 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 09/24/2019 | Eng on file for truss fixes, fixes OK / All box headers and trimers insulated / All parapet wall framing OK / Need 3rd party observation for welding bolting of structural members | NICK | NICK | | BFR | P | 6346114 |
ART C KLEIN CONSTRUCTION, INC. | BFT | P | 09/24/2019 | Open hole on file / #2400psf / Still need 3rd party observation report for footing/foundation | NICK | NICK | | BFT | P | 6346108 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 09/12/2019 | Frame inspection for exterior steel stud framed walls on south east and north sides of kitchen and bathrooms / Need to pre insulate all box headers installed on exterior walls / Parapet wall framing OK at east side of building on north and west sides / Need open hole report / Need 3rd party observations for footing/foundation/foundation insulation | NICK | NICK | | BFR | P | 6333186 |
ART C KLEIN CONSTRUCTION, INC. | BFT | P | 07/11/2019 | Met on site with contractor and gave OK to use 3rd party for footing/foundation/drain/foundation insulation / Need open hole report | NICK | NICK | | BFT | P | 6260378 |
FOSTER ELECTRIC CORPORATION | E= | C | 06/16/2020 | Corrections made. | BRETC | BRETC | | E= | C | 6605993 |
FOSTER ELECTRIC CORPORATION | E= | R | 06/15/2020 | P1 - Neutral lug/bar is very loose and not sitting flat / 1" PVC connector needs to be in panel P2 - Neutral lu/bar is very loose / GEC will need to be landed in panel | BRETC | BRETC | | E= | R | 6604592 |
FOSTER ELECTRIC CORPORATION | E= | P | 06/02/2020 | Panels P1 and P2 need disconnects installed in building panels or outside disconnects / Label both panels - Main building rest - ok | BRETC | BRETC | | E= | P | 6590510 |
FOSTER ELECTRIC CORPORATION | E= | P | 05/26/2020 | Panel S1 and S2 look at brkr and inside panels - label and AIC / Freezer Heat Trace needs GFCI / Blank ouside east door / Freezer and fridge everything on top need to be Nema 3R / Seal all penetrating conduits in freezer and fridge / Strap RTU's / Label all equipment on roof / | BRETC | BRETC | | E= | P | 6583033 |
FOSTER ELECTRIC CORPORATION | EP | C | 04/21/2020 | | BRETC | BRETC | | EP | C | 6546764 |
FOSTER ELECTRIC CORPORATION | E= | P | 04/21/2020 | Fully rated one line ISC labeling needs to be on all panel equipment / Lemonade mixer needs to be finished / Freezer needs to be finished / Post light will need to be finished / Need to label circuits on all of roof equipment / RTU 1 and RTU 2 need NEMA 3R disco's / Small hood drilled hole needs permanent grommet for sharp metal vibration / Dishwasher needs to be 60a + breaker lock / East outside WP need GFCI . | BRETC | BRETC | | E= | P | 6546757 |
FOSTER ELECTRIC CORPORATION | EUG | C | 04/20/2020 | The rest of ballards around walkway out side / marked on plans | BRETC | BRETC | | EUG | C | 6545438 |
FOSTER ELECTRIC CORPORATION | ER | C | 04/20/2020 | Last two ceilings ice & wrangler room. | BRETC | BRETC | | ER | C | 6545436 |
FOSTER ELECTRIC CORPORATION | EUG | P | 04/09/2020 | EUG: 4/9 marked on drawings | BRETC | BRETC | | EUG | P | 6536382 |
FOSTER ELECTRIC CORPORATION | EUG | P | 04/07/2020 | EUG: Maked on plans - OK | BRETC | BRETC | | EUG | P | 6533269 |
FRONTIER FIRE PROTECTION, LLC. | E= | C | 02/20/2020 | FIRE ALARM INSPECTION: FA complete, | JOHNN | JOHNN | | E= | C | 6487300 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/20/2020 | grid,see rough | JOHNN | JOHNN | | E= | P | 6487299 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/20/2020 | grid: all grid ok except pop rm and wrangler rm, leave tiles open for new wrangler feeder, to be installed later, 15 amp MAU cb's installed, | JOHNN | JOHNN | | ER | P | 6487297 |
FOSTER ELECTRIC CORPORATION | E= | P | 02/13/2020 | Roof top: mushroom fans,ok/ MAU CB'S not in yet, | JOHNN | JOHNN | | E= | P | 6481354 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/06/2020 | grid both bath rms, Ceiling rough ok, FA not complete ---------do not close ceiling-------------- /--------------------ROOF TOP: MAU-1,MAU-3 need 15 amp cb, all sealtite fittings need to be wrench tight, mushroom fans: can not have open conductors before disco, | JOHNN | JOHNN | | ER | P | 6475836 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/04/2020 | fixtures in grid need 4 screws or clips to grid, close open j boxes, | JOHNN | JOHNN | | ER | P | 6473359 |
FOSTER ELECTRIC CORPORATION | ES | C | 01/28/2020 | Commercial Service: 800 amp,4w 120/208v, ok to energize, all panels,ok------------------CHECK panel schedules on final. | JOHNN | JOHNN | | ES | C | 6466357 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/23/2020 | 2 1/2" pvc to future stage,ok | JOHNN | JOHNN | | EUG | P | 6461500 |
FOSTER ELECTRIC CORPORATION | EP | P | 01/23/2020 | A1,,K need plastic bushing, | JOHNN | JOHNN | | EP | P | 6461490 |
FOSTER ELECTRIC CORPORATION | ES | P | 01/23/2020 | Commercial Service: 800 amp,4w, new commercial, ok to energize, -------------------ok up to main in ATS, --------need cold water boned to main service, bond steel also, | JOHNN | JOHNN | | ES | P | 6461486 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/23/2020 | Panels A1,K need plastic bushings on feeder pipes, A2 not ready, | JOHNN | JOHNN | | ER | P | 6461484 |
FOSTER ELECTRIC CORPORATION | ES | R | 01/22/2020 | need CT meter socket mounted,brass tag, #8 cu grd, rest is ok, up to main inside building, -----------NEED to SPLICE SE conductors, installed 3- 400 AL, | JOHNN | JOHNN | | ES | R | 6460380 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/14/2020 | inside main pavillion area: ceiling, walls,ok-----------no FA yet, talked with EC, will call in when ready, | JOHNN | JOHNN | | ER | P | 6452293 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/08/2020 | 2.5" pvc for ticket booth, see plans, | JOHNN | JOHNN | | EUG | P | 6447360 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/02/2020 | all service secondary underground,ok, | JOHNN | JOHNN | | EUG | P | 6441710 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/18/2019 | ADA, men and womens' bathroom, mech closet on 2nd floor | GARYL | GARYL | | ER | P | 6402869 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/15/2019 | Take photos, NEED CALL A HEAD EVERYTIME, stopped by could not access, fresh concrete | GARYL | GARYL | | ER | P | 6401118 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/13/2019 | ONLY exterior patio wall all the way around building, and eug in this portion only , nothing outside of patio | GARYL | GARYL | | ER | P | 6397814 |
FOSTER ELECTRIC CORPORATION | ER | P | 11/07/2019 | walls only, marked and dated on prints, NOTE! south walls to outside in patio area okay | GARYL | GARYL | | ER | P | 6391702 |
FOSTER ELECTRIC CORPORATION | EUG | P | 10/03/2019 | pvc to future BBQ pit, | JOHNN | JOHNN | | EUG | P | 6356253 |
FOSTER ELECTRIC CORPORATION | ESL | P | 10/01/2019 | Kitchen and service area, | GARYL | GARYL | | ESL | P | 6354132 |
FOSTER ELECTRIC CORPORATION | ESL | P | 08/06/2019 | couldn't find an uber, but the ufer is okay | GARYL | GARYL | | ESL | P | 6290802 |
HVAC SOLUTIONS, INC. | H= | C | 05/27/2020 | HOOD 1 INTERLOCKS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6585105 |
HVAC SOLUTIONS, INC. | H= | P | 05/26/2020 | NEED INTERLOCKS AT HOOD 1 NOTES: ALL OTHER INTERLOCKS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6583471 |
HVAC SOLUTIONS, INC. | H= | P | 05/26/2020 | TAB REPORT RECEIVED - WILL NEED CALL AHEAD INFORMATION FOR SOMEONE ON - SITE TO VERIFY INTERLOCKS AT HOODS | JERRYF | JERRYF | | H= | P | 6581979 |
FRONTIER MECHANICAL SYSTEMS INC | HV | C | 05/07/2020 | INSPECTED 2 BOILER VENTS AND CONDENSATES AND 2 TANKLESS WATER HEATER VENTS AND CONDENSATES ON 4/2/2020 | BENH | BENH | | HV | C | 6564952 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 05/07/2020 | ALL FINAL CONNECTIONS / REGULATORS VENTS / FINAL CONNECTIONS AND TIE DOWNS OK | JERRYF | JERRYF | | H= | C | 6564902 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 04/06/2020 | NO NEED TO DELETE KITCHEN EQUIPMENT FROM PLANS IT IS JUST BACK ORDERED PER CONVERSATION WITH JACK ARRINGTON, STILL NEED MEDIUM PRESSURE STENCILING, OK TO ATTACH PICTURES OF STENCILING TO INSPECTION REQUEST | BENH | BENH | | H= | P | 6532375 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 04/02/2020 | NEED THE FOLLOWING: DELETE KITCHEN EQUIPMENT THAT IS NOT USED AND CAP GAS LINES FOR THAT EQUIPMENT, LABEL MEDIUM PRESSURE GAS LINES, REGULATORS ARE IN PLACE AND 2LB LETTER IS ON FILE | BENH | BENH | | H= | P | 6530031 |
HVAC SOLUTIONS, INC. | HD | P | 02/07/2020 | GREASE WRAP OK AT ALL HOODS PENDING INSPECTION OF GREASE ACCESS DOORS AND PILLOWS WILL NEED DOORS REMOVED AND LADDER FOR NEXT INSPECTION | JERRYF | JERRYF | | HD | P | 6477044 |
HVAC SOLUTIONS, INC. | HD | L | 02/03/2020 | NO CALL AHEAD INFORMATION GIVEN - ARRIVED 3:20 - NO ONSITE PERSONNEL - CONTRACTOR WAS TO SUPPLY PICTURES OF 1ST LAYER AND WRAP INSTALL MANUAL PER PREVIOUS NOTES DATED 1 / 23 - WILL NEED PICTURES AND WRAP INSTALL MANUAL TO COMPLETE WRAP INSPECTION - STOPPED INSPECTION - WILL NEED SOMEONE ONSITE FOR NEXT INSPECTION | JERRYF | JERRYF | | HD | L | 6472799 |
HVAC SOLUTIONS, INC. | HD | P | 01/23/2020 | LIGHT TEST OK ON ALL HOODS / OK FOR WRAP / CONTRACTOR TO SUPPLY PICTURES OF 1ST LAYER OF WRAP AND TO HAVE WRAP INSTALL MANUAL AT TIME OF INSPECTION | JERRYF | JERRYF | | HD | P | 6461522 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 01/23/2020 | OK TO SET 2# METER | JERRYF | JERRYF | | HC | C | 6461447 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 01/23/2020 | PRESSURE TEST OK - AND PIPING OK PER REVISED PLAN DATED 1/16/20 - AT FUTURE INSPECTION VERIFY REGULATORS / VENTS / LABELS AND FINAL CONNECTIONS
| JERRYF | JERRYF | | HI | P | 6461446 |
HVAC SOLUTIONS, INC. | HD | P | 01/22/2020 | BY FINAL NEED PLAN REVISED FOR GREASE DUCT TO MATCH AS INSTALLED STILL NEED HOOD #2 INSPECTED ALREADY SCHEDULED FOR 1 / 23 AM INSPECTION NOTES: HOOD #3 OK FOR WRAP | JERRYF | JERRYF | | HD | P | 6460881 |
HVAC SOLUTIONS, INC. | HD | P | 01/21/2020 | GREASE DUCT LIGHT TEST : GREASE DUCT FOR HOOD-1 ONLY OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6458851 |
HVAC SOLUTIONS, INC. | HD | R | 01/17/2020 | THIS INSPECTION WAS FOR THE FOLLOWING - HOODS 1 AND 2 - STOPPED INSPECTION - FOUND SEVERAL HOLES AND 2 GREASE DAMS - RE INSPECT ALL | JERRYF | JERRYF | | HD | R | 6456314 |
HVAC SOLUTIONS, INC. | HD | P | 12/30/2019 | GREASE DUCT FITTINGS WITH MY INTIALS AND DATE ON THEM OK | BENH | BENH | | HD | P | 6439350 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 12/03/2019 | PRESSURE TEST ON 4 GAUGES AND PIPING OK 2 COOK LINES IN WALLS - MAIN LINE IN KITCHEN AREA AND AT EXTERIOR FOR FUTURE SMOKER - BEFORE METER RELEASE NEED THE FOLLOWING - PLANS REVISED SHOWING PIPING AS INSTALLED AND SIZES OF DROPS IN WEST COOK LINE WALL - LINE COMPLETED AND TESTED FOR WATER HEATERS - PLAN REVISED FOR ALL PIPING AT DINING AREA INCLUDING DROPS AT FIREPLACES - STILL NEED ALL REGULATORS / VENTS / LABELS - ALL DINING AREA GAS LINES INSPECTED | JERRYF | JERRYF | | HI | P | 6414717 |
HVAC SOLUTIONS, INC. | HD | P | 12/03/2019 | EAST HOOD WALL OK PLASTIC PIPE HAS BEEN REMOVED | JERRYF | JERRYF | | HD | P | 6414697 |
HVAC SOLUTIONS, INC. | HD | P | 11/19/2019 | NEED ALL PLASTIC PIPING REMOVED FROM EXTERIOR HOOD WALL AT HOOD 1 | JERRYF | JERRYF | | HD | P | 6403582 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/19/2019 | HAD CONSULT WITH FRONTIER ON THE FOLLOWING - SEE REVISED NOTES FROM 11 / 18 ON NEEDING REVISED PLAN FOR CHANGING TO LOW PRESSURE PIPING AT ALL COOK LINES WHERE PLAN SHOWS MEDIUM PRESSURE / CONTRACTOR PROCEEDING AT OWN RISK | JERRYF | JERRYF | | HI | P | 6403580 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 11/19/2019 | STILL NEED ALL TIE INS AT BOILERS NOTES: PRESSURE TEST OK ON ALL HWP PIPING | JERRYF | JERRYF | | HWP | P | 6403577 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/18/2019 | NOTES ADDED ON 11 / 19 CHANGED INSPECTION TO HI - NEED PLAN REVISION ASAP FOR CHANGING FROM MEDIUM PRESSURE TO LOW PRESSURE AT ALL COOK LINES BEFORE METER RELEASE NOTES; PRESSURE TEST OK ON 3 LINES AT EXTERIOR HOOD WALL | JERRYF | JERRYF | | HI | P | 6403103 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 11/18/2019 | NEED 50# ON 100# GAUGE - ALREADY RESCHEDULED FOR 11/19 MUST BE 1 ST INSPECTION | JERRYF | JERRYF | | HWP | P | 6403102 |
HVAC SOLUTIONS, INC. | HD | P | 11/15/2019 | ALL FITTINGS WITH MY INTIALS OK | BENH | BENH | | HD | P | 6401160 |
HVAC SOLUTIONS, INC. | HD | P | 11/14/2019 | ABOVE CEILING SA / RA MAINS AND RUN OUTS AND MUA MAIN LINE OK - INSPECTOR WOULD LIKE TO INSPECT AS MUCH GREASE DUCT AT SHOP AS POSSIBLE BEFORE INSTALL | JERRYF | JERRYF | | HD | P | 6399475 |
FRONTIER MECHANICAL SYSTEMS INC | HO | P | 11/14/2019 | NEED PLAN REVISED TO SHOW NEW LINE TO FUTURE SMOKER WEST SIDE OF BUILDING - NEED APPROVED NAIL PROTECTION AT WALL WHERE PS2 ENTERS BUILDING WILL CONFIRM AT NEXT INSPECTION NOTES: PRESSURE TEST AND PIPING OK AT UNDERGROUND PS 2 FROM BUILDING TO FUTURE SMOKER | JERRYF | JERRYF | | HO | P | 6399474 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 11/13/2019 | PRESSURE TEST OK AND PIPING PER PLAN FOR MAIN SUPPLY AND RETURN LINES FROM IN FLOOR MANIFOLDS TO BOILER ROOM FOR ZONES 1 AND 2 | JERRYF | JERRYF | | HWP | P | 6398235 |
FRONTIER MECHANICAL SYSTEMS INC | HSP | P | 11/13/2019 | HAD CONSULT WITH FRONTIER AND G.C. ON BURIED GAS LINE TO FUTURE SMOKER - WILL NEED GAS LINE EXPOSED AND INSPECTED LINE HAS BEEN COVERED AND PLAN REVISION SHOWING LINE AS INSTALLED BEFORE METER RELEASE | JERRYF | JERRYF | | HSP | P | 6398234 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 11/05/2019 | PRESSURE TEST OK AND PIPING PER PLAN AT ZONE 4 IN-SLAB | JERRYF | JERRYF | | HWP | P | 6389224 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 11/01/2019 | 3 TESTS OK ON IN FLOOR AT THE FOLLOWING ZONES M 1- 2 - 3 | JERRYF | JERRYF | | HWP | P | 6386337 |
HVAC SOLUTIONS, INC. | HD | P | 10/18/2019 | NEED ALL PLASTIC MATERIALS REMOVED FROM INSIDE HOOD WALLS - COULD NOT TELL IF HOODS ARE ZERO CLEARANCE AND APPLIANCES MAY REQUIRE CLEARANCE TO COMBUSTIBLE CONSTRUCTION | JERRYF | JERRYF | | HD | P | 6374164 |
HVAC SOLUTIONS, INC. | HSP | P | 10/09/2019 | HAD CONSULT WITH LUKE FROM HVAC SOLUTIONS ON GREASE FAN LOCATION - WILL NEED REVISED PLAN SHOWING NEW LOCATIONS OF GREASE FANS | JERRYF | JERRYF | | HSP | P | 6362831 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 10/01/2019 | 2 PRESSURE TESTS OK ON ALL 11/4" MAINS FOR HWP UNDER GROUND PIPING - NEED PLANS REVISED SHOWING NEW MAIN LINES AND TIE INS - CONTRACTOR PROCEEDING AT OWN RISK FOR BURIAL | JERRYF | JERRYF | | HWP | P | 6354350 |
HVAC SOLUTIONS, INC. | HSP | P | 09/18/2019 | HAD CONSULT WITH CALEB WITH HVAC SOLUTIONS ON GREASE FAN LOCATIONS ON ROOF - WILL NEED PLAN REVISION FOR RELOCATING FANS | JERRYF | JERRYF | | HSP | P | 6340038 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 05/11/2020 | Corrections made. | SAMH | SAMH | | P= | C | 6566769 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 05/06/2020 | Need Trap guards at emergency floor drains and floor sinks throughout. Need air gap at dishwasher drain. Cap off unused water supply to ice maker. | SAMH | SAMH | | P= | P | 6562927 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 04/02/2020 | Consultation for accessible fixtures and kitchen equipment. | SAMH | SAMH | | P= | P | 6529437 |
FRONTIER MECHANICAL SYSTEMS INC | PGI | C | 11/18/2019 | Vents complete. | SAMH | SAMH | | PGI | C | 6402029 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/18/2019 | Need to verify ceiling insulation. Set mop sinks. Add plan splice for future water line at west side of building. Check mechanical room at final. | SAMH | SAMH | | PTO | P | 6402013 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/12/2019 | 2 line through 6 line DWV and Water ok, excluding insulation and flange anchors. | SAMH | SAMH | | PTO | P | 6396820 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 10/01/2019 | | SAMH | SAMH | | PB | C | 6353311 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/27/2019 | Verify floor drains at K-line. Water under slab to hose bibs, and dwv ok. | SAMH | SAMH | | PB | P | 6350902 |
FRONTIER MECHANICAL SYSTEMS INC | PGI | P | 09/25/2019 | GW plumbing ok to kitchen floor sinks at 8-line to west wall. | SAMH | SAMH | | PGI | P | 6346971 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/25/2019 | Sanitary line ok through 8-line | SAMH | SAMH | | PB | P | 6346967 |
FRONTIER MECHANICAL SYSTEMS INC | PGI | P | 09/20/2019 | Underground vents to outside if structure ok. | SAMH | SAMH | | PGI | P | 6342340 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/20/2019 | DWV and water entry ok from 2-line through 6-line excluding floor drain at J-line. Underground water to north west hose bib ok. | SAMH | SAMH | | PB | P | 6342335 |
FRONTIER MECHANICAL SYSTEMS INC | PGI | P | 09/06/2019 | Changed to PGI inspection. Underground GW to Smoker ok. Verify with local Utilities Jurisdiction before backfilling. | SAMH | SAMH | | PGI | P | 6327494 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 08/09/2019 | Trench drain at G line ok. 2" Water into building. | SAMH | SAMH | | PB | P | 6295945 |
FOSTER ELECTRIC CORPORATION | XES | T | 04/30/2020 | PAID (REC#1682439): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added Panel S3-1 and WRANGLER. Revised power and lighting. Revised schedules. | BERTHA | BERTHA | | XES | T | 6557135 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | T | 04/28/2020 | PAID (REC#1676776): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: change floor sink to floor drain, add service sink, Add line behind fireplace | TCRIPPEN | TCRIPPEN | | XPS | T | 6553479 |
FOSTER ELECTRIC CORPORATION | XES | T | 03/11/2020 | PAID (REC#1669182): PLAN SPLICE FEE: $50 by: BEND for Electrical: Revised one line, schedules, lighting and power throughout. | BEND | BEND | | XES | T | 6507935 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | P | 03/05/2020 | PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice changed ducts to 6 inch remove one 8 " | TCRIPPEN | TCRIPPEN | | XMS | P | 6501629 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 01/16/2020 | PAID (REC#1656266) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice showing new gas line up,, t-stat locations redesign isometric, revise gas system added schedule, showing kitchen equipment | TCRIPPEN | TCRIPPEN | | XMS | T | 6455060 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 12/02/2019 | PAID (REC#1647566) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 5 clouds | DALEH | DALEH | | XMS | T | 6413438 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | P | 11/15/2019 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: Revised gas and other minor changes | DALEH | DALEH | | XMS | P | 6401497 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | P | 11/15/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 11/15/19: Delta 4 revisions 3/4" service line to future smoke house | SHANEN | SHANEN | | XPS | P | 6401451 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 10/02/2019 | PAID (REC#1634483) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised piping | JUSTINC | JUSTINC | | XMS | T | 6355416 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | P | 08/21/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 8/21/19: Delta 3 revisions P1.00 adjusted fixture schedule, P2.01 changed to trough lavs and added drinking fountains and piping | SHANEN | SHANEN | | XPS | P | 6308785 |
ART C KLEIN CONSTRUCTION, INC. | XBS | T | 08/21/2019 | PAID (REC#1629244) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Replaced lavs in restrooms with troughs. | BPHILLIPS | BPHILLIPS | | XBS | T | 6308733 |
ART C KLEIN CONSTRUCTION, INC. | XBS | P | 07/26/2019 | PLAN SPLICE: (No Fee) by: BPHILLIPS for Construction: Revised top of footing elevation. | BPHILLIPS | BPHILLIPS | | XBS | P | 6278792 |