JACO GENERAL CONTRACTOR, INC. | B= | C | 02/28/2020 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6495507 |
JACO GENERAL CONTRACTOR, INC. | B= | P | 11/20/2019 | pending comletion of plumb final, building okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6405463 |
JACO GENERAL CONTRACTOR, INC. | BFR | C | 11/20/2019 | per previous comment, column that was to be relocated was left in original location, | BOBF | BOBF | | BFR | C | 6405450 |
JACO GENERAL CONTRACTOR, INC. | BFR | P | 10/23/2019 | pending other required inspections , light metal framing for wall separating kitchen from dining area and framing for cloud in dining area okay | BOBF | BOBF | | BFR | P | 6377589 |
JACO GENERAL CONTRACTOR, INC. | BFR | R | 10/18/2019 | need to revise and splice plan showing relocated column and new pad , will need eng stamped open hole / pad installed is 3' x 3' 12" deep with 3 #5 each way top and bottom | BOBF | BOBF | | BFR | R | 6373291 |
GREAT AMERICAN ELECTRIC LLC | E= | C | 11/15/2019 | | BRIAN | BRIAN | | E= | C | 6401440 |
GREAT AMERICAN ELECTRIC LLC | ER | P | 11/12/2019 | above grid ceiling ok / | MIGUEL | MIGUEL | | ER | P | 6396597 |
GREAT AMERICAN ELECTRIC LLC | ER | P | 11/08/2019 | wall adjacent to menu board wall, counter wall, single gang outlet added to beverage wall / | MIGUEL | MIGUEL | | ER | P | 6392891 |
GREAT AMERICAN ELECTRIC LLC | ESL | C | 10/31/2019 | in slab pvc ok / | MIGUEL | MIGUEL | | ESL | C | 6384317 |
GREAT AMERICAN ELECTRIC LLC | ESL | R | 10/28/2019 | was cancelled | CRAIG | CRAIG | | ESL | R | 6381975 |
GREAT AMERICAN ELECTRIC LLC | ER | P | 10/22/2019 | soffit over POS and menu board wall / | MIGUEL | MIGUEL | | ER | P | 6377106 |
GREAT AMERICAN ELECTRIC LLC | ER | P | 10/16/2019 | Discussed accessibility requirements with contractor / ---------- need to change one line to show new branch circuit are coming out of another panel ------------ new panel schedule for what they have touched | CRAIG | CRAIG | | ER | P | 6370489 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 11/27/2019 | engineer letter for aav in images | JOSEPHD | JOSEPHD | | P= | C | 6410790 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 11/27/2019 | | JOSEPHD | JOSEPHD | | PB | C | 6410782 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 11/20/2019 | need engineer letter for aav, still waiting for plan splice to be uploaded will check in morning | JOSEPHD | JOSEPHD | | P= | P | 6405721 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 11/05/2019 | plans not uploaded in yet, cover at own risk, pipe was tested, 2" to hub drain, plans call for floor sink, will need engineer letter for hub drain, need to verify aav on plans once uploaded | JOSEPHD | JOSEPHD | | PB | P | 6388375 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 11/19/2019 | PAID (REC#1645621): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 11/19/19: Delta 5 revisions P1.0 removed fixture schedule to eliminate floor sink, keyed notes P1 & P2, revised plumbing plan | SHANEN | SHANEN | | XPS | T | 6404315 |
GREAT AMERICAN ELECTRIC LLC | XES | T | 11/08/2019 | PAID (REC#1643554): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power, lighting and panel schedules. | BERTHA | BERTHA | | XES | T | 6393029 |
JACO GENERAL CONTRACTOR, INC. | XPS | T | 11/01/2019 | PAID (REC#1641769): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 11/1/19: Delta 4 revisions added plumbing pages P1.0 and P2.0 | SHANEN | SHANEN | | XPS | T | 6385389 |