GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 05/01/2020 | All other required Final inspections are complete. (This is a computer generated result) | DAKOTAB | DAKOTAB | | B= | C | 6558900 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 04/02/2020 | PAID (REC#1671576): ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice remove water lines from AVA | TCRIPPEN | TCRIPPEN | | BSP | T | 6529961 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/10/2020 | BUILDING FINAL COMPLETED ON 3-9-20 -- Building final for phase 2 OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6505260 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2020 | INSPECTION COMPLETED ON 3-9-20 -- Item from previous inspection corrected -- Above lid at ANTE 2269 OK | DAKOTAB | DAKOTAB | | BSP | P | 6505249 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 2-18-19 -- Need to patch hole at fire barrier in ANTE 2269 -- Rest of Above lid inspection at 2nd floor area 122 OK | DAKOTAB | DAKOTAB | | BFR | P | 6505247 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 11-12-19 -- Fire spray at bottom track of trash room 2001 OK | DAKOTAB | DAKOTAB | | BSP | P | 6505240 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 11-8-19 -- Spray foam insulation at drid line 1 from grid line M to grid line W OK per detail | DAKOTAB | DAKOTAB | | BSP | P | 6505233 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 11-8-19 -- Mineral wool at slab edge in trash room 2001 OK per engineering judgment received -- Still need to inspect firespray at bottom track | DAKOTAB | DAKOTAB | | BFR | P | 6505225 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 11-5-19 -- Interior light gauge framing at corridor wall 2294 down to door 2265 OK pending other roughs -- Interior light gauge framing at trash room 2001 OK | DAKOTAB | DAKOTAB | | BFR | P | 6505217 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 10-30-19 -- Air handler 16 interior light gauge wall framing OK | DAKOTAB | DAKOTAB | | BFR | P | 6505206 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 10-25-19 -- Light gauge framed wall at corridor 2294 OK -- Reviewed upcoming inspections | DAKOTAB | DAKOTAB | | BFR | P | 6505199 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 9-25 -- partial framing for common 01 room interior framing and section of framing at corridor to outside of stairwell along matchline/framing is per plan | DAKOTAB | DAKOTAB | | BFR | P | 6505192 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION ENTERED ON PERMIT M35724 -- DATED 9/18 -- SPD wall framing is per plan and listing U419 | DAKOTAB | DAKOTAB | | BFR | P | 6505142 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/09/2020 | Inspection request changed from B= to BSP - Need complete list of inspections performed on wrong permit for this permit from contractor | DAKOTAB | DAKOTAB | | BSP | P | 6505020 |
ENCORE ELECTRIC, INC. | E= | C | 05/01/2020 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6559004 |
ENCORE ELECTRIC, INC. | E= | C | 05/01/2020 | | RANDY | RANDY | | E= | C | 6558899 |
ENCORE ELECTRIC, INC. | E= | C | 03/09/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | C | 6504873 |
ENCORE ELECTRIC, INC. | E= | P | 02/28/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6496653 |
ENCORE ELECTRIC, INC. | ER | P | 02/28/2020 | SPD ceilings phase 2 | RANDY | RANDY | | ER | P | 6496647 |
ENCORE ELECTRIC, INC. | E= | P | 02/26/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6493554 |
ENCORE ELECTRIC, INC. | ER | P | 02/26/2020 | ceilings marked on plans | RANDY | RANDY | | ER | P | 6493546 |
ENCORE ELECTRIC, INC. | ER | P | 12/19/2019 | FIRE ALARM INSPECTION: no FA | RANDY | RANDY | | ER | P | 6432825 |
ENCORE ELECTRIC, INC. | ER | P | 12/19/2019 | 2 can lights marked on plans | RANDY | RANDY | | ER | P | 6432818 |
ENCORE ELECTRIC, INC. | ER | P | 12/04/2019 | SPD ceiling marked on plans | RANDY | RANDY | | ER | P | 6416393 |
ENCORE ELECTRIC, INC. | ER | P | 12/03/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6415266 |
ENCORE ELECTRIC, INC. | ER | P | 12/03/2019 | SPD phase 2 ceilings marked on plans | RANDY | RANDY | | ER | P | 6414613 |
ENCORE ELECTRIC, INC. | ER | P | 12/02/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6413682 |
ENCORE ELECTRIC, INC. | ER | P | 12/02/2019 | SPD walls marked on plans | RANDY | RANDY | | ER | P | 6413563 |
ENCORE ELECTRIC, INC. | ER | P | 11/27/2019 | SPD walls marked on plans | RANDY | RANDY | | ER | P | 6412162 |
ENCORE ELECTRIC, INC. | ER | P | 11/05/2019 | room 2001 ( trash room ) walls marked on plans | CRAIGS | CRAIGS | | ER | P | 6388321 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 04/06/2020 | PHASE -2- MECHANICAL HEAT FINAL COMPLETE / ENGINEER STAMPED TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6531647 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 04/02/2020 | PHASE -2 - HYDRONIC ( HEAT WATER ) COMPLETE. | LIDO | LIDO | | H= | C | 6530349 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 03/05/2020 | PHASE -2 : PARTIAL HEAT FINAL PENDING - NEED SPLICE REMOVING THE COIL FOR VAV 2-244. | LIDO | LIDO | | H= | P | 6501588 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 03/05/2020 | ALL HYDRONIC PIPING COMPLETE. | LIDO | LIDO | | HWP | C | 6501580 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/27/2020 | PHASE -2 PARTIAL HEAT FINAL OK - FINAL PENDING EF-2-8 AND EF-2-14 LABELED FOR THE AREA SERVED / NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6495214 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/20/2020 | 2ND FLOOR M-122 ( BDA 84) ABOVE CEILING FINAL OK. ALL THERMOSTATS IN PLACE. PHASE ENTRY PENDING - 3RD FLOOR PLAN PAGE M-132 ( BDA 85) AHU-16 - FINAL INSPECTION. | LIDO | LIDO | | H= | P | 6487940 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/19/2020 | 2ND FLOOR ( PDF) MH122 ( BDA 84) : SUPPLY AND RETURN GRILLS AND FLEX CONNECTIONS OK. | LIDO | LIDO | | HD | P | 6486578 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/11/2020 | 2ND FLOOR MH-122 ( BDA 84) SUPPLY AIR FLEX CONNECTIONS TO GRILLS OK / DUCT ROUGH AND FINAL CONNECTIONS FOR THE TWO CART WASHERS OK.
| LIDO | LIDO | | HD | P | 6479557 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 01/14/2020 | 2ND FLOOR MP-122 ( BDA 33) - 100 LB TEST FOR HIGH PRESSURE STEAM OK. INSTALLED PER PLANS. OK TO WRAP AND LABEL . HIGH PRESSURE CONDENSATE INSTALLED PER PLANS. | LIDO | LIDO | | HWP | P | 6452942 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 01/09/2020 | 4TH FLOOR M142 ( BDA35) CHILLED WATER SUPPLY/ RETURN UNDER OPERATING PRESSURE - NO VISIBLE LEAKS / INSTALLED PER PLAN. OK TO WRAP AND LABEL. 3RD FLOOR SPLICE DATED 12/23/19 M-132 (BDA 85) : AHU-16- CHILLED WATER SUPPLY / RETURN, HEAT WATER SUPPLY / RETURN UNDER OPERATING PRESSURE NO VISIBLE LEAKS, INSTALLED PER PLAN . UNIT HEATER -HEAT WATER SUPPLY / RETURN UNDER OPERATING PRESSURE NO VISIBLE LEAKS, INSTALLED PER PLAN . OK TO WRAP AND LABEL. | LIDO | LIDO | | HWP | P | 6448154 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/06/2020 | 3RD FLOOR M-132 ( BDA 85) : AHU-16 - FRESH AIR INTAKE PLENUM / FINAL CONNECTIONS TO UNIT AND LOUVER OK. | LIDO | LIDO | | HD | P | 6444622 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/13/2019 | 2ND FLOOR ( SPD AREA) MH-122 ( BDA 84) 1- DAMPER COMPLETE. | LIDO | LIDO | | HD | P | 6427426 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/12/2019 | 2ND FLOOR ( SPD) MP-122 (BDA 33) HEAT WATER SUPPLY AND RETURN FOR VAV-2-246 AND VAV2-245 UNDER OPERATING PRESSURE NO VISIBLE LEAKS , INSTALLED PER PLAN / FINAL TIE-INS OK. | LIDO | LIDO | | HWP | P | 6426368 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/12/2019 | 2ND FLOOR ( SPD ) MH122 ( BDA 84 SPLICE ) 1- DAMPER COMPLETE. ABOVE CEILING SUPPLY DUCT ROUGH OK/ OK TO WRAP. CORRIDOR DUCT ROUGH OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6426366 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/10/2019 | 2ND FLOOR ( SPD) MH-122 ( BDA 84)- 1 - DAMPER FRAME OK. ABOVE CEILING PARTIAL DUCT ROUGH OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6422590 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/09/2019 | CONSULT ON PHASING . 2ND FLOOR ( SPD) MH-122 ( BDA 84)ABOVE CEILING SUPPLY AIR DUCT ROUGH IN CORRIDOR # 2298 OK / OK TO WRAP. 1- DAMPER FRAME IN SAME CORRIDOR OK. | LIDO | LIDO | | HD | P | 6420643 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/05/2019 | ( FACE TIME) 2ND FLOOR ( SPD) MH-122 ( BDA 84 SPLICE) ((TRASH ROOM # 2001 FINAL OK.)) | LIDO | LIDO | | HD | P | 6418139 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/04/2019 | 4TH FLOOR M-142 ( BDA 35) CHILLED WATER SUPPLY AND RETURN / HEAT WATER SUPPLY AND RETURN UNDER OPERATING PRESSURE NO VISIBLE LEAKS, INSTALLED PER PLAN . OK TO WRAP AND LABEL. | LIDO | LIDO | | HWP | P | 6416025 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/03/2019 | 2ND FLOOR ( SPD) MH122 ( BDA 84) SPLICE DATED 11/14/19 - SPLICE COMPLETED PERTAINING TO NOTES DATED 11/12/19 AND 11/4/19. 1 - DAMPER FRAME ABOVE DOUBLE DOOR FRAMED PER STAMPED ENGINEER DETAIL AND LETTER ( SEE IMAGES) . THEE DAMPERS COMPLETE. 2ND FLOOR ( SPD) MH122 ( BDA 82) SUPPLY, RETURN AND EXHAUST DUCT ROUGH OK / OK TO WRAP. VAV 2-245 OK. | LIDO | LIDO | | HD | P | 6414644 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/19/2019 | MH122 (BDA 82 AND 84) SUPPLY AIR DUCT IN TRASH 2001 OK, OK TO WRAP. THREE FIRE/SMOKE DAMPERS COMPLETE. SUPPLY CONNECTIONS TO AHU-16 OK. | DUSTINS | DUSTINS | | HD | P | 6404721 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/12/2019 | NEED REVISED AND APPROVED PLANS FOR ADDED FIRE SMOKE DAMPER IN SUPPLY BELOW RTU-16 ON 3RD FLOOR MH132 ( BDA 34) 2ND FLOOR (SPD AREA) MH-122 ( BDA 82) PARTIAL CART WASH EXHAUST ABOVE CEILING DUCT ROUGH OK / OK TO WRAP. 1- FRAME OK. | LIDO | LIDO | | HD | P | 6396390 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/05/2019 | 2ND FLOOR (SPD AREA) MH-122 ( BDA 32) PARTIAL SUPPLY, RETURN AND EXHAUST ABOVE CEILING DUCT ROUGH OK / OK TO WRAP | LIDO | LIDO | | HD | P | 6389231 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/04/2019 | 2ND LEVEL ( SPD) - MH-122 ( BDA 82) : THREE DAMPERS COMPLETE / TWO DAMPER FRAMES OK. | LIDO | LIDO | | HD | P | 6387797 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/30/2019 | 2ND FLOOR MH -122 ( BDA 81) NEED REVISED AND APPROVED PLANS FOR FOR THE FOLLOWING LISTED - 16 X 16 FIRE DAMPER INSTALLED IN WALL AND DUCT TO ASSEMBLY ROOM # 2263 NOT SHOWN ON PLANS ( DAMPER FRAME HAS ALREADY BEEN INSPECTED) / 24 X 14 EXHAUST DUCT AND FIRE DAMPER FOR EF-2-8 MOVE FROM ROOM # 2263 TO NEW WALL FOR ANTE ROOM # 2269 . ( 1- DAMPER COMPLETE FOR VAV-2-243 ) | LIDO | LIDO | | HD | P | 6384014 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 10/23/2019 | 2ND FLOOR MP122 ( BDA -33) NEED REVISED / APPROVED PLANS FOR COIL ELIMINATED FOR VAV 2-244 . SUPPLY AND RETURN HEAT WATER PIPING TO VAV-2-243 UNDER OPERATING PRESSURE OK / NO VISIBLE LEAKS / OK TO WRAP AND LABEL. VAV-2-243 HEAT WATER SUPPLY AND RETURN FINAL TIE-IN OK. | LIDO | LIDO | | HWP | P | 6378105 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/10/2019 | 2ND FLOOR MH122 ( BDA 113 ) SPLICE PLAN DATED 9-18-19 SHOWS 2 - FIRE DAMPERS DELETED / REFER TO CLOUDED AREAS AND NOTE - 11 . | LIDO | LIDO | | HD | P | 6365222 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/08/2019 | 2ND FLOOR MH-122 ( BDA 32) 5- DAMPER FRAMES OK . | LIDO | LIDO | | HD | P | 6362283 |
OLSON PLUMBING & HEATING COMPANY | HD | P | 10/06/2019 | (( PHASE - 2 )) ( HD ) DUCT ROUGH INSPECTIONS DONE ON PERMIT M35724. THERE ARE STILL INSPECTIONS REMAINING ON THIS PHASE-2 PERMIT. PLEASE CALL DUCT INSPECTIONS ON THIS PHASE -2 UNDER THIS PERMIT NUMBER WHEN READY. | LIDO | LIDO | | HD | P | 6359056 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 03/09/2020 | eye wash installed | TED | TED | | P= | C | 6504248 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/04/2020 | 2nd floor SPD area-- backflows for all sterilizing equipment, trap guards sinks ok, the only thing let is the eye wash reel and it can complete with images | TED | TED | | P= | P | 6499748 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 02/27/2020 | 2nd floor spd under floor in lab ceiling 1st floor | TED | TED | | PTO | C | 6494742 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/29/2020 | low test lab dwv | JOSEPHD | JOSEPHD | | PTO | P | 6468559 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/30/2019 | 2nd floor dwv and water in walls and ceiling for remaining 3 comp. sinks and hand sinks | TED | TED | | PTO | P | 6439309 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/12/2019 | water pipe in wall at 3 comp sinks 2nd floor area 122 from lines 3 to 3.1 ok to insulate | JOSEPHD | JOSEPHD | | PTO | P | 6425723 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/27/2019 | drain line in 2nd floor ceiling for AHU16 floor drain, cart wash dwv in wall and ceiling of 2nd floor, eye wash and sink dwv and water in wall and ceiling 2nd floor, in wall dwv and water 2nd floor 3 comp. sink | TED | TED | | PTO | P | 6411451 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/20/2019 | 2nd floor cart washers drain in 1st floor ceiling ok | TED | TED | | PTO | P | 6405829 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/04/2019 | hot, cold, recurc. piping, drain lines, run to temp. set trailers outside of power plant building | TED | TED | | PTO | P | 6387263 |