GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 05/12/2020 | | LONNYS | LONNYS | | B= | C | 6568837 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/20/2020 | Building final OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6517118 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/17/2020 | ABOVE LID -- Items from previous inspection corrected -- Above lid OK | DAKOTAB | DAKOTAB | | BSP | P | 6513079 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2020 | ABOVE LID AT AREA 121 -- Need to mud and tape drywall patches -- Need to firecaulk group of electrical conduits at sterile storage -- Rest OK pending other roughs | DAKOTAB | DAKOTAB | | BSP | P | 6505993 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 2-25-20 -- Above lid at restroom 2249 and 2250 OK -- Door infill frame at 2 doors in 2256 OK | DAKOTAB | DAKOTAB | | BFR | P | 6505382 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 2-6-20 -- Gypsum attachment and firestopping at penetrations at restrooms 2249 and 2250 OK per UL U419 -- Training with Dave | DAKOTAB | DAKOTAB | | BSP | P | 6505380 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 2-6-20 -- Steel stud framing at 1hr fire barrier in room 2256,2251, and 2258 OK per UL U419 -- Interior light gauge framing at in rooms 2251 and 2258 OK -- Training with Dave | DAKOTAB | DAKOTAB | | BFR | P | 6505378 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED - 1-28-20 -- Light gauge framing at 1 hr fire barrier wall at rest room 2249 and 2250 OK per UL U419 -- Light gauge framing at rear wall of compressor room 2260 OK | DAKOTAB | DAKOTAB | | BFR | P | 6505376 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 12-4-19 -- Firespray at slab edge in AHU 3038 OK | DAKOTAB | DAKOTAB | | BSP | P | 6505368 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- INSPECTION DATED 12-3-19 -- Mineral wool firestop at slab edge in AHU 3038 OK -- Still need to inspect firespray at bottom track | DAKOTAB | DAKOTAB | | BSP | P | 6505364 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 11-27-19 -- Remainder of light gauge framing at area 122 OK pending other roughs | DAKOTAB | DAKOTAB | | BFR | P | 6505279 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2020 | INSPECTION COMPLETED ON PERMIT M35724 -- DATED 11-5-19 -- Still need to do above lid inspection in room 3038 and discussed engineer judgment at shaft infill in room 3038 per detail 2 on sheet A300 | DAKOTAB | DAKOTAB | | BFR | P | 6505271 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/09/2020 | Inspection request changed from BFR to BSP - Need complete list of inspections performed on wrong permit for this permit from contractor | DAKOTAB | DAKOTAB | | BSP | P | 6505022 |
ENCORE ELECTRIC, INC. | E= | C | 05/01/2020 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6559053 |
ENCORE ELECTRIC, INC. | E= | C | 03/20/2020 | phase 3 final | RANDY | RANDY | | E= | C | 6517252 |
ENCORE ELECTRIC, INC. | ER | P | 03/12/2020 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6509768 |
ENCORE ELECTRIC, INC. | ER | P | 03/12/2020 | sterile storage and staging ceilings-----marked on plans | RANDY | RANDY | | ER | P | 6509621 |
ENCORE ELECTRIC, INC. | ER | P | 02/28/2020 | phase 3 wall | RANDY | RANDY | | ER | P | 6496640 |
ENCORE ELECTRIC, INC. | ER | P | 02/25/2020 | bath lids spd. second access required for j-boxes | BRET | BRET | | ER | P | 6491341 |
ENCORE ELECTRIC, INC. | ER | P | 02/07/2020 | sterile storage walls | RANDY | RANDY | | ER | P | 6476978 |
ENCORE ELECTRIC, INC. | ER | P | 02/04/2020 | FA with electric | RANDY | RANDY | | ER | P | 6473503 |
ENCORE ELECTRIC, INC. | ER | P | 02/04/2020 | 2 bathroom walls marked on plans | RANDY | RANDY | | ER | P | 6473473 |
ENCORE ELECTRIC, INC. | ER | P | 02/03/2020 | FIRE ALARM INSPECTION: area marked by Randy on previous date | BRET | BRET | | ER | P | 6471916 |
ENCORE ELECTRIC, INC. | ER | P | 01/31/2020 | sterile storage walls marked on plans | RANDY | RANDY | | ER | P | 6471173 |
ENCORE ELECTRIC, INC. | ER | P | 01/30/2020 | sterile storage walls marked on plans | RANDY | RANDY | | ER | P | 6470077 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 04/15/2020 | RECEIVED ENGINEER STAMPED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6540726 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 04/14/2020 | PHASE -3 MECHANICAL FINAL PENDING : FULL ENGINEER STAMPED TEST AND BALANCE REPORT WILL BE REQUIRED. ( Discussed with Kyle S) | LIDO | LIDO | | H= | P | 6539785 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 03/18/2020 | PHASE -3 PARTIAL HEAT FINAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6514168 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 03/17/2020 | PHASE 3 HYDRONIC HEAT FINAL COMPLETE. | LIDO | LIDO | | H= | C | 6512766 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 03/17/2020 | STILL NEED REMOTE SMOKE INDICATORS INSTALLED / NEED TEST AND BALANCE REPORT/ ((ALL THERMOSTATS INSTALLED. )) | LIDO | LIDO | | H= | P | 6512723 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 03/12/2020 | MH-121 ( BDA 136) ALL SUPPLY, RETURN AND EXHAUST GRILLS AND REGISTERS IN PLACE. NEED REMOTE SMOKE INDICATORS, THERMOSTATS AND TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6509084 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | C | 03/02/2020 | MH-121 ( BDA 136 ) 1- DAMPER FAME OK / 1 DAMPER COMPLETE / ALL FIRE / FIRE SMOKE DAMPERS IN THIS AREA ARE COMPLETE / ALL DUCT ROUGH IN THIS AREA COMPLETE. | LIDO | LIDO | | HD | C | 6497573 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/27/2020 | 2ND FLOOR MH-121 ( BDA 132) - TWO DAMPERS COMPLETE. | LIDO | LIDO | | HD | P | 6495218 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/20/2020 | ((SPLICE COMPLETED FOR 1- FIRE DAMPER REMOVED AND 1- FIRE DAMPER CHANGED TO FIRE SMOKE DAMPER .)) 2ND FLOOR MH-121 ( BDA 136) 3- DAMPERS COMPLETE / 1- FRAME OK / DUCT ROUGH ABOVE BATHROOM HARD LIDS OK. | LIDO | LIDO | | HD | P | 6487948 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/13/2020 | 2ND LEVEL MH-121 ( BDA 132) 4- DAMPER FRAMES OK. | LIDO | LIDO | | HD | P | 6482144 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/11/2020 | 2ND FLOOR MH-121 ( BDA 132) - NEED INSTALL INSTRUCTIONS FOR THE THREE ROUND FIRE SMOKE DAMPERS . 1 - DAMPER COMPLETE. SUPPLY DUCT BRANCH LINES OK. | LIDO | LIDO | | HD | P | 6479565 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/31/2020 | 2NF FLOOR MH-121 ( BDA 136) TB2-74 - PLAN SPLICE DATED 1/17/20 :18 X 12 FIRE DAMPER DELETED FROM INSTALL , NEED REVISED PLAN TO SHOW THE CODE SECTION AND EXCEPTION FOR A THROUGH PENETRATION THROUGH A FIRE BARRIER WHEN A FIRE DAMPER IS NOT INSTALLED. SUPPLY AND RETURN PARTIAL DUCT ROUGH OK. | LIDO | LIDO | | HD | P | 6471225 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/29/2020 | 2ND FLOOR MH121 ( BDA 132) ; 4 - DAMPER FRAMES OK / 4- DAMPERS COMPLETE / SUPPLY AND RETURN PARTIAL DUCT ROUGH OK. OK TO INSULATE. | LIDO | LIDO | | HD | P | 6468622 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/28/2020 | 2ND FLOOR MH121 ( BDA 132) ; 1 DAMPER FRAME OK. | LIDO | LIDO | | HD | P | 6466826 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/17/2020 | 2ND FLOOR MH-121 ( BDA 132) 1- DAMPER FRAMES OK / MEDIUM PRESSURE DUCT ROUGH OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6457150 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/16/2020 | 2ND FLOOR MH-121 ( BDA 132) 2- DAMPER FRAMES OK / 1- DAMPER COMPLETE. VAV 2-249 , MEDIUM PRESSURE TIE IN AND PARTIAL LOW PRESSURE DUCT OK / OK TO WRAP. | LIDO | LIDO | | HD | P | 6455581 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/14/2020 | 2ND FLOOR MH-121 ( BDA 132) 1 - DAMPER FRAME OK / 1- DAMPER COMPLETE. | LIDO | LIDO | | HD | P | 6452914 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/09/2020 | 2ND FLOOR MH-121 ( BDA 132) 1- DAMPER FRAME OK. | LIDO | LIDO | | HD | P | 6448138 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 03/27/2020 | ok for phase 3 | JOSEPHD | JOSEPHD | | P= | C | 6524067 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 03/27/2020 | | JOSEPHD | JOSEPHD | | PTO | C | 6524064 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/20/2020 | dwv area 111 over head ok | JOSEPHD | JOSEPHD | | PTO | P | 6517321 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/18/2020 | consultation | JOSEPHD | JOSEPHD | | PTO | P | 6514350 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/13/2020 | water in walls and ceiling 2nd floor area 121 | TED | TED | | PTO | P | 6481768 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/10/2020 | dwv in walls and ceiling 2nd floor area 121 | TED | TED | | PTO | P | 6477856 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 03/27/2020 | PLAN SPLICE FEE: $0 by: TCRIPPEN for Mechanical: new splice removing hot and cold from VAV | TCRIPPEN | TCRIPPEN | | XMS | P | 6524382 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 02/19/2020 | PAID (REC#1665070): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: okay new splice relocate doors and FSD | TCRIPPEN | TCRIPPEN | | XMS | T | 6485652 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 02/19/2020 | PAID (REC#1664499): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revise smoke barrier location. | SHELLEY | SHELLEY | | XBS | T | 6485599 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 01/17/2020 | PAID (REC#1656637) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice re route HWR and HWS lines, re route ducts changed a Damper type Adjusted schedules | TCRIPPEN | TCRIPPEN | | XMS | T | 6456388 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 12/23/2019 | PAID (REC#1652060) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: added unit heatyer and fire/smoke dampers | TCRIPPEN | TCRIPPEN | | XMS | T | 6435721 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 11/14/2019 | PAID (REC#1644456) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: relocate duct and Fire Damper | TCRIPPEN | TCRIPPEN | | XMS | T | 6399173 |
ENCORE ELECTRIC, INC. | XES | P | 11/01/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Add smoke dampers | SHELBY | SHELBY | | XES | P | 6386378 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 11/01/2019 | PAID (REC#1644706) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 6386332 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | P | 11/01/2019 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Steel platform | MICHAELA | MICHAELA | | XBS | P | 6386281 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 11/01/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 11/1/19: Delta ASI-19 revisions PP111 piping to FS-1, PP121 adjusted floor plan for FS-1 | SHANEN | SHANEN | | XPS | P | 6386259 |
ENCORE ELECTRIC, INC. | XES | P | 10/04/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Phasing | SHELBY | SHELBY | | XES | P | 6357584 |
ENCORE ELECTRIC, INC. | XES | P | 10/03/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: For phases | SHELBY | SHELBY | | XES | P | 6357247 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XMS | T | 09/30/2019 | PAID (REC#1637868) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Plan approval is for phasing only. See previously approved plan for all mechanical work. | JUSTINC | JUSTINC | | XMS | T | 6351862 |