PRO WALL SYSTEMS LLC | B= | C | 06/08/2020 | All other required Final inspections are complete. (This is a computer generated result) | CHUCK | CHUCK | | B= | C | 6596648 |
PRO WALL SYSTEMS LLC | B= | P | 06/02/2020 | Building final OK pending completion of external agency final inspection. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | CHUCK | CHUCK | | B= | P | 6590678 |
PRO WALL SYSTEMS LLC | B= | P | 05/31/2020 | Building final OK pending completion of mechanical and external agency final inspections. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), CLEAR WATER PLUMBING, HEATING & UTILITIE Mechanical Final Inspection is not Completed yet, MICK HEATING & SHEET METAL Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | P | 6588209 |
PRO WALL SYSTEMS LLC | B= | P | 05/26/2020 | Offices changed to Showroom areas and wall types with hard lids at restroom and mop closet have been changed per latest plan splice. Building final OK pending completion of mechanical and external agency final inspections. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), CLEAR WATER PLUMBING, HEATING & UTILITIE Mechanical Final Inspection is not Completed yet, MICK HEATING & SHEET METAL Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | P | 6583498 |
PRO WALL SYSTEMS LLC | B= | R | 05/11/2020 | Need to resolve demising wall frame and bathroom/mop closet wall bracing items from BFR inspection - NOTE: Bathroom/Mop Closet is hard lid, not suspended ceiling / Offices are not accessible due to door thresholds (approx. 2 1/4" high) / Need to complete MEP final inspections // Rest of building final OK. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), CLEAR WATER PLUMBING, HEATING & UTILITIE Mechanical Final Inspection is not Completed yet, CLEAR WATER PLUMBING, HEATING & UTILITIE Plumbing Final Inspection is not Completed yet, COPPER SMITH ELECTRIC INC Electrical Final Inspection is not Completed yet, MICK HEATING & SHEET METAL Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | R | 6567334 |
PRO WALL SYSTEMS LLC | BFR | P | 02/04/2020 | Attach electrical permit and complete all rough inspections / Demising wall P3 not framed per detail 5 A2.1 / Restroom walls P1 missing diagonal bracing at 48"o.c. | TIMOTHYS | TIMOTHYS | | BFR | P | 6473610 |
COPPER SMITH ELECTRIC INC | E= | C | 05/21/2020 | | BRET | BRET | | E= | C | 6579326 |
COPPER SMITH ELECTRIC INC | E= | P | 05/07/2020 | relocate water cooler receptacle have covered by cooler | BRET | BRET | | E= | P | 6564554 |
COPPER SMITH ELECTRIC INC | E16 | R | 04/13/2020 | inspection was for 200 amp panel in unit 172 permit not pulled for that space install light and switch to illuminate panel | BRET | BRET | | E16 | R | 6538833 |
COPPER SMITH ELECTRIC INC | ES | C | 03/31/2020 | Commercial Service: 125 amp service to unit 180 ok to energize | BRET | BRET | | ES | C | 6526959 |
COPPER SMITH ELECTRIC INC | ES | R | 03/26/2020 | 200 amp breaker installed replace with 125 amp | BRET | BRET | | ES | R | 6522360 |
COPPER SMITH ELECTRIC INC | ER | C | 02/18/2020 | Walls ok / | BRETC | BRETC | | ER | C | 6484457 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | H= | C | 06/02/2020 | GAS FINAL COMPLETE. | TREVORH | TREVORH | | H= | C | 6589798 |
MICK HEATING & SHEET METAL CO. | H= | C | 06/02/2020 | MECHANICAL FINAL COMPLETE. | TREVORH | TREVORH | | H= | C | 6589646 |
MICK HEATING & SHEET METAL CO. | H= | P | 05/28/2020 | TEST AND BALANCE REPORT RECEIVED SEE IMAGES, T-STAT AND REMOTE INDICATOR OK COULD NOT LOCATE WATER LEVEL MONITORING DEVICE WITH IN ROOF TOP UNIT, OK TO ATTACH PICTURE. FINAL PENDING-----CONTRACTOR ADDING ROOF TOP UNIT TO SCOPE OF WORK, AND VERIFICATION OF THE WATER LEVEL MONITORING DEVICE. | TREVORH | TREVORH | | H= | P | 6586420 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HC | C | 05/28/2020 | RELEASE 1 PSIG METER | TREVORH | TREVORH | | HC | C | 6585405 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HI | C | 05/28/2020 | A LETTER FROM CITY UTILITIES APPROVING THE 1 PSIG SYSTEM IS ON FILE SEE IMAGES, PIPING INSTALLED PER PLANS. FINAL PENDING CONTRACTOR REQUESTING FINAL, NO ONSITE REQUIRED. | TREVORH | TREVORH | | HI | C | 6585403 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HI | P | 05/04/2020 | ON SHEET M 1.2 THE DETAIL IS SHOWING A 1 PSIG GAS SYSTEM WILL NEED CLARIFICATION FROM THE ENGINEER, IF THIS IS GOING TO BE A 2 PSIG SYSTEM WILL NEED TO SEE THE LETTER FROM CSU APPROVING THE 2 PSIG SYSTEM BY FINAL . 10 LB TEST OK MEDIUM PRESSURE REGULATOR AND STENCILING IN PLACE, WILL RELEASE METER AFTER CLARIFICATION. | TREVORH | TREVORH | | HI | P | 6559688 |
MICK HEATING & SHEET METAL CO. | HD | P | 05/04/2020 | THERE APPEARS TO BE AN OPEN SANITARY WASTE VENT OPEN ABOVE THE RESTROOMS PLEASE VERIFY WHAT THIS PIPE IS,WILL CONSULT PLUMBING INSPECTOR, NEED TO ADD NEW RTU TO SCOPE OF WORK, CONTRACTOR WILL NEED TO BE AWARE OF THE LETTER FROM THE STRUCTURAL ENGINEER FOR SPECIFIC REQUIREMENTS FOR THE NEW ROOF TOP UNIT, EXPOSED SUPPLY DUCTING AND SURFACE MOUNTED GRILLES OK, EXHAUST DUCTING AND FAN OK, AT FINAL WILL NEED TO SEE, THE NEW RTU LABELED AS TO THE RTU NUMBER AND SUIT SERVED, WILL NEED WATER LEVEL MONITORING AND DUCT DETECTORS REMOTE INDICATOR . THE CONTINUATION OF THE RETURN AIR DUCT. T-STAT LOCTION. | TREVORH | TREVORH | | HD | P | 6559639 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HI | L | 05/01/2020 | CANCELLED AT CALL AHEAD. NO PRESSURE GAUGE OR TEST READY AT THIS TIME. THIS WILL BE TO RELEASE METER FOR EXISTING GAS INSTALLED AT CORE AND SHELL FOR RTU. PLEASE RE-CALL INSPECTION WHEN READY. | DUSTINS | DUSTINS | | HI | L | 6557960 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | C | 05/15/2020 | Corrections made. | DANR | DANR | | P= | C | 6573371 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | C | 05/15/2020 | Ok. | DANR | DANR | | PTO | C | 6573370 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | P | 05/13/2020 | PTO not completed ( expose all covered piping at water heater deck ) / need air gap at T&P / rest ok. | DANR | DANR | | P= | P | 6570477 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | P | 02/03/2020 | All in wall plumbing ok. | SAMH | SAMH | | PTO | P | 6472693 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PB | C | 01/17/2020 | | SAMH | SAMH | | PB | C | 6456668 |
PRO WALL SYSTEMS LLC | XBS | T | 05/12/2020 | PAID (REC#1679792): PLAN SPLICE FEE: $50 by: DANM for Construction: Revised partition type details | DANM | DANM | | XBS | T | 6567961 |
COPPER SMITH ELECTRIC INC | XES | P | 03/18/2020 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Add RTU | SHELBY | SHELBY | | XES | P | 6513967 |
PRO WALL SYSTEMS LLC | XBS | P | 03/10/2020 | PLAN SPLICE: (No Fee) by: DANM for Construction: Structural review for new RTU | DANM | DANM | | XBS | P | 6505434 |