CRADDOCK DEVELOPMENT COMPANY, INC. | B= | C | 04/25/2022 | | ERAMIREZ | ERAMIREZ | | B= | C | 7350911 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 03/04/2022 | Still need exterior entrance ramp completed / knee protection at sinks not completed at upper bathrooms / door hardware single action installed / handrail corrected / -- Schedule a new Building Final when above items are complete. | NATHAN | NATHAN | | B= | P | 7291269 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 02/22/2022 | Temp CO: extension ( Expires: 3/24/2022 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 7279113 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 01/20/2022 | Temp CO: Extension pending required finals ( Expires: 2/19/2022 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 7244811 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | T | 10/19/2021 | PAID (REC#1817916): Temp CO: extension pending required finals ( Expires: 11/18/2021 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 7146300 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BE | L | 09/23/2021 | Renewed online for 1/2 Fee at 9/23/2021 10:14:33 AM (RECEIPT #: 1809213) | WEBSITE | WEBSITE | | BE | L | 7117354 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | T | 03/24/2021 | PAID (REC#1759199): tco | JANE | JANE | | B= | T | 6908924 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 03/24/2021 | Temp CO: extension ( Expires: 4/23/2021 12:00:00 AM) | JANE | JANE | | B= | P | 6908923 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | T | 03/08/2021 | PAID (REC#1759191): | JANE | JANE | | B= | T | 6891692 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BE | T | 03/08/2021 | PAID (REC#1759192): TCO | JANE | JANE | | BE | T | 6891691 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 03/08/2021 | Temp CO: extension ( Expires: 3/27/2021 12:00:00 AM) | JANE | JANE | | B= | P | 6891686 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BE | T | 01/28/2021 | PAID (REC#1746177): TCO | JANE | JANE | | BE | T | 6851164 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 01/28/2021 | Temp CO: Extension ( Expires: 2/27/2021 12:00:00 AM) | JANE | JANE | | B= | P | 6851162 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | T | 11/11/2020 | PAID (REC#1729907): Temp CO: Extension pending required finals/ Trip fee added for TCO fee collection ( Expires: 12/11/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6772255 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BE | T | 10/05/2020 | PAID (REC#1718796): TCO fee | JANE | JANE | | BE | T | 6730067 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 10/05/2020 | Temp CO: TCO need building and mech ( Expires: 11/4/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6730059 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BE | T | 08/27/2020 | PAID (REC#1708657): TCO fee | JANE | JANE | | BE | T | 6687426 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 08/27/2020 | Temp CO: Need building and mech ( Expires: 9/26/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6687423 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 07/31/2020 | Temp CO: need mech and elec ( Expires: 8/30/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6657857 |
CRADDOCK DEVELOPMENT COMPANY, INC. | B= | P | 07/31/2020 | Complete Outside agency final inspection / Complete MEP final inspections / Missing panic hardware side exit main level / Missing panic hardware lower level side exit / Lower level side exit threshold not accessible / Building needs accessible entrance at side door / Handrails to basement need to return to wall and are set too low / Need knee protection at both upper restrooms -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): HOMELAND MECHANICAL LLC Mechanical Final Inspection is not Completed yet, MAIN ELECTRIC LTD Electrical Final Inspection is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | P | 6657712 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/31/2020 | Intumescent paint installers letter on file | TIMOTHYS | TIMOTHYS | | BFR | P | 6656768 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/28/2020 | hat channel and 4th layer drywall started and okay. | NATHAN | NATHAN | | BFR | P | 6652873 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/24/2020 | 3rd layer drywall and start of hat channel per FC 5751 | NATHAN | NATHAN | | BFR | P | 6649934 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/21/2020 | 2nd layer drywall at ceiling okay. | NATHAN | NATHAN | | BFR | P | 6644478 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/15/2020 | Partial 1st layer drywall at ceiling per FC 5751 only | NATHAN | NATHAN | | BFR | P | 6638768 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/14/2020 | 2nd layer drywall both sides of wall completed. | NATHAN | NATHAN | | BFR | P | 6636386 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/10/2020 | Rock and rock attachment ok both sides of basement wall now / Received UL listed product data sheet for Intumescent coating used on steel columns and beams Firetex FX5090 | TIMOTHYS | TIMOTHYS | | BFR | P | 6633864 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 07/07/2020 | 1st layer rock and rock attachment ok at basement wall | TIMOTHYS | TIMOTHYS | | BFR | P | 6628934 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | R | 07/06/2020 | Basement wall screw spacing still not corrected per previous inspection notes | TIMOTHYS | TIMOTHYS | | BFR | R | 6627567 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | R | 07/01/2020 | 1st layer drywall at basement wall need screw spacing and top corrected per table 721.1.2 14-15 | NATHAN | NATHAN | | BFR | R | 6624254 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 06/24/2020 | beams at upstairs to truss need weld observation at beam to beam, missing H2,5 at truss to beam | NATHAN | NATHAN | | BFR | P | 6616349 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 06/19/2020 | Window king studs installed. | NATHAN | NATHAN | | BFR | P | 6610410 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 05/29/2020 | king studs not added. | NATHAN | NATHAN | | BFR | P | 6587741 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 05/29/2020 | letter calls for 2 king studs each side framing now is only 1 call frame when king studs are corrected. | NATHAN | NATHAN | | BFR | P | 6586877 |
CRADDOCK DEVELOPMENT COMPANY, INC. | BFR | P | 05/27/2020 | Provide header schedule for windows framed new 2-2x12 header with 2T1K installed, exterior wall restrooms and downstairs walls with completed required inspections okay, Discussed continuity of walls and ceiling up to bottom of floor sheathing, Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6584805 |
MAIN ELECTRIC LTD | E= | C | 08/07/2020 | splice received, A1 on one-line and power plan ok / | MIGUEL | MIGUEL | | E= | C | 6664690 |
MAIN ELECTRIC LTD | E= | P | 07/28/2020 | correction not made: see previous notes and submit to plan review, fuses and disco,ok | JOHNN | JOHNN | | E= | P | 6651914 |
MAIN ELECTRIC LTD | E= | P | 07/22/2020 | splice: add one line to show panel "A1" and AIC, power plan to show location of A1/ basement heaters: turn fuses so they can be read/ add disco at air curtain/ rest ok/ Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | JOHNN | JOHNN | | E= | P | 6645726 |
MAIN ELECTRIC LTD | E= | P | 07/20/2020 | corrections not made, group neutrals in 1 pipe in A1/ water cooler gfci/ add disco on air curtain/ a/c units in ground: wrench tight sealtite, and strap within 3'/ basement: remove mc cable near rear heater or put in j box/ 2 basement heaters need proper wire size and cb's for 10k,@240/ label all a/c units/ RTU-3 needs 35 amp max cb or fuse/ | JOHNN | JOHNN | | E= | P | 6642620 |
MAIN ELECTRIC LTD | E= | P | 07/17/2020 | bath outlet within 6' of sink needs gfci/ water cooler needs gfci/ is there a disco for the air curtain?/ panel A1: branch cb's need to be 22K/ remove bond screw/ group neutrals/ label where panel is fed from/ still need to look downstairs and hvac/ need electrician onsite/ | JOHNN | JOHNN | | E= | P | 6641961 |
MAIN ELECTRIC LTD | ER | P | 06/19/2020 | all walls,ok | JOHNN | JOHNN | | ER | P | 6610696 |
MAIN ELECTRIC LTD | ER | P | 05/27/2020 | corrections made/ still need rough on main floor center wall and electrical room, | JOHNN | JOHNN | | ER | P | 6583943 |
MAIN ELECTRIC LTD | ER | P | 05/26/2020 | walls upstairs and downstairs / multiple areas no straps or straps outside requirements / meet accessibility height requirements in restrooms and break room / | MIGUEL | MIGUEL | | ER | P | 6582389 |
HOMELAND MECHANICAL LLC | H= | C | 10/16/2020 | MECHANICAL FINAL COMPLETE, TAB REPORT ATTACHED, SEE IMAGES | BENH | BENH | | H= | C | 6743648 |
HOMELAND MECHANICAL LLC | H= | P | 10/15/2020 | PARTIAL PENDING REVISED TAB REPORT | BENH | BENH | | H= | P | 6742854 |
HOMELAND MECHANICAL LLC | H= | P | 10/01/2020 | NEED THE FOLLOWING - PROPER DISTANCE TO OSA FROM FURNACE ON ROOF - INSTALL BALANCING DAMPERS AT BOTH OSA DUCTS - INSULATE ALL OSA DUCT - TAB REPORT | JERRYF | JERRYF | | H= | P | 6726701 |
HOMELAND MECHANICAL LLC | H= | P | 08/03/2020 | PICTURES OF STEEL COVER ON ROOF INSULATION RECEIVED - STILL NEED OTHER ITEMS ADDRESSED FROM PREVIOUS INSPECTION | JERRYF | JERRYF | | H= | P | 6658285 |
HOMELAND MECHANICAL LLC | H= | P | 07/31/2020 | F-1 AND F-2 OUTSIDE AIR IS OUTSIDE THE +/- 10 % RANGE, PER TAB REPORT F-2 DOESN'T HAVE ANY OUTSIDE AIR INSTALLED,WILL REQUIRE REBALANCING, QUESTIONING IF THAT INSULATION IS ALLOWED TO BE EXPOSED ON ROOF LIKE THAT OR WILL NEED METAL COVERING, ENGINEERED LETTER FOR EQUIPMENT CHANGE RECEIVED, SEE IMAGES | BENH | BENH | | H= | P | 6656691 |
HOMELAND MECHANICAL LLC | H= | P | 07/14/2020 | PARTIAL PENDING THE FOLLOWING - TAB REPORT - EQUIPMENT CHANGE LETTER FROM ENGINEER PER PREVIOUS NOTES - NEED ALL EXTERIOR DUCT INSULATED TO R12 AND PROTECTED - CONTRACTOR ATTACH PICTURES OF BOTH INSULATION LAYERS AND SKIN AND ENGINEER LETTER TO TAB REPORT | JERRYF | JERRYF | | H= | P | 6636509 |
HOMELAND MECHANICAL LLC | HC | C | 07/14/2020 | RELEASE METER | JERRYF | JERRYF | | HC | C | 6636497 |
HOMELAND MECHANICAL LLC | HI | C | 07/14/2020 | PLAN REVISION FOR GAS COMPLETE OK TO RELEASE METER | JERRYF | JERRYF | | HI | C | 6636487 |
HOMELAND MECHANICAL LLC | HD | P | 07/02/2020 | NEED REVISED PLAN PER PREVIOUS NOTES AND APPROVED EQUIPMENT SUBMITTAL - AT FINAL VERIFY RTU DUCT ON ROOF HAS BEEN INSULATED AND - VERIFY ROUND DUCT CONNECTION AT BASEMENT FURNACE SUPPLY PLENUM HAS BEEN SECURED AND SEALED - NEED TAB REPORT | JERRYF | JERRYF | | HD | P | 6625799 |
HOMELAND MECHANICAL LLC | HI | P | 07/02/2020 | CANNOT RELEASE METER UNTIL REVISED PLAN IS APPROVED PER PREVIOUS NOTES NOTES: PRESSURE TEST OK - VERIFY ALL FINAL CONNECTIONS AT FINAL | JERRYF | JERRYF | | HI | P | 6625792 |
HOMELAND MECHANICAL LLC | HRP | C | 06/02/2020 | PRESSURE TEST OK AND PIPING PER PLAN - DRAINS ARE COMPLETE AT MAIN FLOOR FURNACE - STILL NEED BASEMENT FURNACE DRAIN | JERRYF | JERRYF | | HRP | C | 6590559 |
HOMELAND MECHANICAL LLC | HI | P | 06/02/2020 | PRESSURE TEST AND PIPING OK ON MAIN FLOOR ONLY - STILL BASEMENT / ROOF AND REVISED PLAN TO MATCH INSTALLED ROUTING | JERRYF | JERRYF | | HI | P | 6590557 |
HOMELAND MECHANICAL LLC | HD | P | 06/02/2020 | NEED REVISED PLAN FOR RELOCATED DUCT WORK ON BASEMENT AND MAIN FLOOR - NEED RETURN COMPLETED AT BASEMENT FURNACE - NEED APPROVED EQUIPMENT SUBMITTAL FOR AMANA EQUIPMENT WHERE CARRIER IS SCHEDULED NOTES: EXPOSED SA / RA MAINS AND RUN OUTS OK ON BASEMENT AND 1ST FLOOR | JERRYF | JERRYF | | HD | P | 6590554 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 07/02/2020 | | SAMH | SAMH | | P= | C | 6625817 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 06/30/2020 | Lacking side clearance at toilets, Need Engineers letter to use existing Cast iron pipe for underground as previously noted. | SAMH | SAMH | | P= | P | 6622441 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 06/15/2020 | Need Engineers letter to use existing Cast Iron waste underground. | SAMH | SAMH | | PB | P | 6604358 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/15/2020 | Complete PB, Check Mechanical room by final. Note: AAV at lower level sink in wall. | SAMH | SAMH | | PTO | P | 6604355 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/01/2020 | Upper level Waste and Water complete excluding flanges and Water heater. Lower level overhead Waste and Water complete back to Mechanical room. Note: Need Engineers letter to use existing underground 3" waste to mechanical room. Discussed Accessible Elements with contractor. | SAMH | SAMH | | PTO | P | 6589117 |
HOMELAND MECHANICAL LLC | XMS | T | 08/27/2020 | PAID (REC#1710326): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 6688121 |
MAIN ELECTRIC LTD | XES | T | 08/06/2020 | PAID (REC#1702248): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Splice to address inspector's comments. Revisions throughout. | BERTHA | BERTHA | | XES | T | 6662954 |