COLARELLI CONSTRUCTION, INC. | B= | C | 09/14/2020 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6703926 |
COLARELLI CONSTRUCTION, INC. | B= | P | 08/25/2020 | . Additional Inspections Required (computer generated): HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6685346 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 06/12/2020 | with completed required inspections all frame okay, Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6603613 |
RYBA ELECTRIC, INC. | E= | C | 08/24/2020 | meter removed / | MIGUEL | MIGUEL | | E= | C | 6682820 |
RYBA ELECTRIC, INC. | E= | P | 08/20/2020 | Final pending removal of meter labeled 130 / rest ok / | MIGUEL | MIGUEL | | E= | P | 6680544 |
RYBA ELECTRIC, INC. | EP | C | 08/19/2020 | T2 200A ok / T1 100A ok / | MIGUEL | MIGUEL | | EP | C | 6677967 |
RYBA ELECTRIC, INC. | E= | P | 08/19/2020 | install handle ties / GFCI quads under panels / label panels w/ phases and colors / remove fuses and meter at service labeled T1 / EDH-1 disconnect missing bond screw, 10A fused / label heat pump disconnects to verify MOCP / | MIGUEL | MIGUEL | | E= | P | 6677966 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/29/2020 | FIRE ALARM INSPECTION: FA complete / | MIGUEL | MIGUEL | | E= | C | 6653480 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 07/29/2020 | FIRE ALARM INSPECTION: rest of ceiling ok / | MIGUEL | MIGUEL | | ER | C | 6653476 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/29/2020 | FIRE ALARM INSPECTION: rest of ceiling ok / | MIGUEL | MIGUEL | | E= | C | 6653477 |
RYBA ELECTRIC, INC. | ER | C | 07/28/2020 | rest of above ceilings ok / | MIGUEL | MIGUEL | | ER | C | 6653184 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 07/24/2020 | FIRE ALARM INSPECTION: short hall and a joining room remaining / FA ok / | MIGUEL | MIGUEL | | ER | P | 6648939 |
RYBA ELECTRIC, INC. | ESP | R | 07/23/2020 | elect ok see plans for ceilings marked / DO NOT COVER THE CEILING DUE TO NO FIRE ALARM INSP/ | BRIAN | BRIAN | | ESP | R | 6647848 |
RYBA ELECTRIC, INC. | ER | P | 06/18/2020 | rest of the walls---ok / | BRIAN | BRIAN | | ER | P | 6609562 |
RYBA ELECTRIC, INC. | ER | P | 06/16/2020 | walls ---see plans / hard lids see plans / | BRIAN | BRIAN | | ER | P | 6606258 |
RYBA ELECTRIC, INC. | ER | P | 06/12/2020 | walls marked on plans / | MIGUEL | MIGUEL | | ER | P | 6603614 |
HVAC SOLUTIONS, INC. | H= | C | 09/14/2020 | PLAN SPLICE COMPLETE | JERRYF | JERRYF | | H= | C | 6703925 |
HVAC SOLUTIONS, INC. | H= | P | 08/26/2020 | PARTIAL PENDING PLAN REVISION - TAB REPORT COMPLETE | JERRYF | JERRYF | | H= | P | 6685468 |
HVAC SOLUTIONS, INC. | H= | P | 08/25/2020 | NEED PLAN REVISION PER PREVIOUS NOTES - NEED CERTIFICATIONS OF TAB REPORT COMPANY OR TAB REPORT APPROVAL LETTER FROM MECHANICAL ENGINEER NOTES: TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 6683899 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 08/06/2020 | ALL LINES LABELED AND ALL DRAINS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6663557 |
HVAC SOLUTIONS, INC. | HD | C | 07/24/2020 | FOR FINAL NEED TAB REPORT, CONDENSATE DRAIN COMPLETED FOR A/C-1, AND PLAN SPLICE FOR RELOCATED ERV | BENH | BENH | | HD | C | 6648944 |
HVAC SOLUTIONS, INC. | HD | P | 07/23/2020 | NEED INSTALLATION INSTRUCTIONS FOR ERV, LINE SET FOR A/C-1 NEEDS TO BE COMPLETED IN CEILING ABOVE I.T. ROOM,WHERE DOES CONDENSATE TERMINATE FOR A/C-1? OK TO INSULATE ERV DUCT, BY FINAL NEED REVISED PLANS FOR ERV RELOCATION, AND TAB REPORT | BENH | BENH | | HD | P | 6647322 |
LANDMARK PLUMBING AND HEATING, INC. | HWP | C | 07/02/2020 | 50 LB TEST OK, OK TO INSULATE, BY FINAL NEED WATER LINES LABELED | BENH | BENH | | HWP | C | 6625237 |
LANDMARK PLUMBING AND HEATING, INC. | HWP | P | 07/01/2020 | LOW TEST SITTING AT 30 PSI REFER TO 304.4.14 IN RBC AMENDMENTS NEEDS TO BE AT 50 PSI | BENH | BENH | | HWP | P | 6623658 |
HVAC SOLUTIONS, INC. | HD | P | 06/25/2020 | INSPECTION WAS FOR ABOVE CEILING SUPPLYS AND RETURNS, OK TO WRAP, WILL STILL NEED RETURNS INSTALLED IN EXAM ROOM 4,5,6,8 AND 9,NEED REVISED APPROVED PLANS SHOWING RELOCATION OF ERV, NEED TO SEE ERV INSTALLED WITH INSTALLATION INSTRUCTIONS AT NEXT INSPECTION, NEED INSTALLATION INSTRUCTIONS FOR HEAT PUMPS TO VERIFY SERVICE CLEARANCES, NO CONDENSATE DRAINS INSTALLED YET, STILL NEED TO SEE A/C-1 INSTALLED IN I.T. ROOM AND CONDENSER INSTALLED | BENH | BENH | | HD | P | 6617228 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 09/02/2020 | Splice approved for Cellular core pvc pipe. | SAMH | SAMH | | P= | C | 6694042 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 09/02/2020 | Splice for Cellular core pvc approved. | SAMH | SAMH | | PB | C | 6694041 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 08/12/2020 | Need Engineers letter for Cellular core pipe as noted at PB inspection. | SAMH | SAMH | | P= | P | 6669751 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 08/12/2020 | Water lines and insulation complete. | SAMH | SAMH | | PTO | C | 6669744 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/30/2020 | DWV complete. Verify insulation and Water lines to rooms 104, 108, and 110. | SAMH | SAMH | | PTO | P | 6622889 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/12/2020 | In wall DWV and Water lines complete. | SAMH | SAMH | | PTO | P | 6603323 |
LANDMARK PLUMBING AND HEATING, INC. | PB | R | 05/21/2020 | Engineers letter requires ASTM D2729 Listing. Pipe installed is Cellular Core. | SAMH | SAMH | | PB | R | 6579214 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 05/14/2020 | Need Engineers letter approving Cellular core pvc underground. Cover at own risk. | SAMH | SAMH | | PB | P | 6572166 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | P | 09/11/2020 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised duct sizes, minor layout, schedule, condensate, OSA dampers | JUSTINC | JUSTINC | | XMS | P | 6703021 |
RYBA ELECTRIC, INC. | XES | T | 09/10/2020 | PAID (REC#1852777): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | T | 6702207 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 09/10/2020 | PAID (REC#1712011): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revised layout | MICHAELA | MICHAELA | | XBS | T | 6702067 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 08/28/2020 | PAID (REC#1709572): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing Delta 2 revisions: P002 adjusted materials schedule | SHANEN | SHANEN | | XPS | T | 6690073 |