INNOVATIVE BUILDING SOLUTIONS LLC | B= | C | 12/10/2020 | verification of corrections on file | BRIANB | BRIANB | | B= | C | 6802861 |
INNOVATIVE BUILDING SOLUTIONS LLC | B= | P | 11/16/2020 | Final approved certificates and test report for materials used in fire protection of floor per IRC 302.13 EX #4 on file / pending verification of other corrections noted from previous inspection -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 6777041 |
INNOVATIVE BUILDING SOLUTIONS LLC | B= | P | 11/13/2020 | Temp CO: Pending building final ( Expires: 12/13/2020 12:00:00 AM) | RITA | RITA | | B= | P | 6776261 |
INNOVATIVE BUILDING SOLUTIONS LLC | B= | P | 11/13/2020 | Provide final approval certificates required per product testing report for material used in fire protection of floors per IRC 302.13 EX #4 / Provide product test report for material used in fire protection of floors per IRC 302.13 EX #4 / missing continuous handrail at basement stairs / unfinished basement / no deck installed -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 6776249 |
INNOVATIVE BUILDING SOLUTIONS LLC | BIN | C | 10/30/2020 | Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file | BRIANB | BRIANB | | BIN | C | 6759019 |
INNOVATIVE BUILDING SOLUTIONS LLC | BLA | C | 09/11/2020 | | BRIANB | BRIANB | | BLA | C | 6703513 |
INNOVATIVE BUILDING SOLUTIONS LLC | BIN | P | 09/09/2020 | pending copy of air leakage testing report (Blower Door) Per 2015 IECC Section R402.4.1 | BRIANB | BRIANB | | BIN | P | 6700432 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFR | C | 09/03/2020 | Narrow walls and frame items corrected. | KELLYB | KELLYB | | BFR | C | 6696570 |
INNOVATIVE BUILDING SOLUTIONS LLC | BSP | P | 09/03/2020 | Full structural floor in basement OK from plan splice. | KELLYB | KELLYB | | BSP | P | 6696568 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFR | P | 09/03/2020 | updated truss design on file / still need to perform site visit for frame inspection | BRIANB | BRIANB | | BFR | P | 6695275 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFR | R | 09/02/2020 | inspection stopped - too many items to list / missing overhead garage door to complete dry-in / truss design on file does not match trusses installed / firestop - all / reviewed items found with site rep / need complete re-inspection | BRIANB | BRIANB | | BFR | R | 6694938 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFN | C | 08/31/2020 | soils and foundation design on file | BRIANB | BRIANB | | BFN | C | 6690537 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFD | C | 08/28/2020 | drain observation on file / damp proofing noted / pending completed foundation inspections / updated 2SEPT20 - foundation inspection complete - changed inspection to complete | BRIANB | BRIANB | | BFD | C | 6688726 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFN | P | 08/28/2020 | foundation observation on file / pending completed footing inspection | BRIANB | BRIANB | | BFN | P | 6688725 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFT | C | 08/28/2020 | pending copy of soils letter and foundation design / engineer observation letter for caissons and foundation walls on file / ufer noted / updated - 2SEPT20 - all paper work on file - changed inspection to complete | BRIANB | BRIANB | | BFT | C | 6688723 |
INNOVATIVE BUILDING SOLUTIONS LLC | BSP | P | 08/18/2020 | Verification of 3rd anchor bolt in basement floor on file. | KELLYB | KELLYB | | BSP | P | 6675958 |
INNOVATIVE BUILDING SOLUTIONS LLC | BSP | P | 08/04/2020 | Garage portal OK. | KELLYB | KELLYB | | BSP | P | 6660720 |
INNOVATIVE BUILDING SOLUTIONS LLC | BSP | R | 07/22/2020 | Missing 3rd 1/2" anchor bolts for both ledgers at partial structural floor in basement -- rest OK. | KELLYB | KELLYB | | BSP | R | 6646797 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFD | R | 07/09/2020 | not ready for inspection - still in process of installing drain / no inspection performed | BRIANB | BRIANB | | BFD | R | 6632687 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFN | P | 07/09/2020 | AUTHORIZED INSPECTION BY ENGINEER / all paper work to follow | BRIANB | BRIANB | | BFN | P | 6632671 |
INNOVATIVE BUILDING SOLUTIONS LLC | BFT | P | 07/09/2020 | AUTHORIZED INSPECTION BY ENGINEER / all paper work to follow | BRIANB | BRIANB | | BFT | P | 6632666 |
P&L ELECTRIC INC. YOUR QUALITY CONNECTION | E= | C | 10/29/2020 | Electrical complete / | ROB | ROB | | E= | C | 6757979 |
P&L ELECTRIC INC. YOUR QUALITY CONNECTION | E= | P | 10/28/2020 | need to check the floor heat --- need ceiling blanks in the bed rooms | CRAIGS | CRAIGS | | E= | P | 6756978 |
P&L ELECTRIC INC. YOUR QUALITY CONNECTION | ES | C | 08/31/2020 | Residential Underground: 200 amp 3/w new res | CRAIGS | CRAIGS | | ES | C | 6691587 |
P&L ELECTRIC INC. YOUR QUALITY CONNECTION | ER | C | 08/31/2020 | unfinished basement --- 2 sub panels --- hot tub pre wire --- | CRAIGS | CRAIGS | | ER | C | 6691578 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | H= | C | 11/04/2020 | Note / Unfinished basement / Conditioned crawl space x2 / Louver door / Direct vent furnace / Indirect vent water heater / No A/C / SEE IMAGES. | PAULO | PAULO | | H= | C | 6764030 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | H= | P | 10/30/2020 | still need to address the following-- remove screen to dryer exhaust duct termination hood, mechanically fasten and seal 4" supply air duct in mechanical room at take off to walk in closet (near furnace) (attach clear photos to permit and recall for inspection). (OUTSIDE AIR TO FURNACE RETURN HAS BEEN REMOVED ON MANUAL J PER JUSTIN). Note / Unfinished basement / Conditioned crawl space x2 / Louver door / Direct vent furnace / Indirect vent water heater / No A/C / | PAULO | PAULO | | H= | P | 6760537 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | H= | P | 10/27/2020 | not ready. waived trip fee this time only. need to address the following-- missing outside air to furnace return per plans pg.#16, install water heater vent screen per manufactures installations pg.#31&32, complete furnace air intake per manufactures installations pg.#48(11&12), secure both supply air boots in crawl space #1 & #2 with registers installed, completely seal 8" round return air duct at take off in mechanical room to foyer/hallway, completely seal 4" supply air duct in mechanical room at take off to walk in closet, mechanically fasten 7" supply to crawl space #1 and 5" supply air duct to master bedroom in mechanical room at take off in mechanical room. Whole house ventilation being achieved with exhaust fan and switch located in laundry room. / Note / Unfinished basement / Conditioned crawl space x2 / Louver door / Direct vent furnace / Indirect vent water heater / No A/C / | PAULO | PAULO | | H= | P | 6755142 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | HC | C | 09/01/2020 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 6692580 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | HI | C | 09/01/2020 | 10 LB TEST OK | DAVIDH | DAVIDH | | HI | C | 6692568 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | HRR | C | 09/01/2020 | MECHANICAL ROOM UNFINISHED CHECK WATER HEATER VENT FORMCORE AND FURNACE VENT AT FINAL. / ALSO CHECK FOR SPLICE AT FINAL FOR WHOLE HOUSE VENTILATION | DAVIDH | DAVIDH | | HRR | C | 6692565 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | HI | P | 08/31/2020 | LOW TEST /
1 1/4 INCH MAIN / 1 FURNACE/ 1 RANGE /1 WATER HEATER | ANDREWP | ANDREWP | | HI | P | 6691501 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | HRR | P | 08/31/2020 | PER DUCT DESIGN PLANS (PAGE 16) CALLS FOR 6 INCH OUTSIDE AIR INSTALLED / NEED FURNACE AND WATER HEATER VENTING INSTALLED / NEED FURNACE INSTRUCTIONS ON SITE /
RE INSPECT ALL | ANDREWP | ANDREWP | | HRR | P | 6691500 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | HRR | R | 08/27/2020 | PLANS CALL FOR 6" DAMPERED OUTSIDE AIR TO RETURN OF FURNACE./ GAS IS A SEPARATE INSPECTION PLUG ALL GAS COCKS AND CALL IN A HI INSPECTION/.SEAL ALL SUPPLY AND RETURN AIR JOINTS UPSTAIRS AND DOWNSTAIRS/ NO EQUIPMENT SET NEED ALL MANUALS OF EQUIPMENT THAT IS GOING TO BE SET TO PASS HRR INSPECTION / WATER HEATER MANUAL ALSO REQUIRED/ | DAVIDH | DAVIDH | | HRR | R | 6688022 |
PLATINUM PLUMBING INC | P= | C | 11/09/2020 | OK. Note: PVB installed. | DANR | DANR | | P= | C | 6769121 |
PLATINUM PLUMBING INC | P= | P | 11/02/2020 | hall bath ok, need to see rest ok house completed, note: pvb installed | JOSEPHD | JOSEPHD | | P= | P | 6761128 |
PLATINUM PLUMBING INC | P= | R | 10/29/2020 | not ready tile not completed in showers no counter tops installed, re-inspect all | JOSEPHD | JOSEPHD | | P= | R | 6757705 |
PLATINUM PLUMBING INC | PTO | C | 08/28/2020 | Ok. Note: Master tub tempering valve left side of furnace / irrigation stub / unfinished basement ( basement bath roughed in under floor and in walls only - VTR lav) | DANR | DANR | | PTO | C | 6690071 |
PLATINUM PLUMBING INC | PB | C | 08/28/2020 | Stub in ok. | DANR | DANR | | PB | C | 6690069 |