CMG CORP | B= | C | 03/09/2021 | | JOHN | JOHN | | B= | C | 6892806 |
CMG CORP | BSP | T | 02/09/2021 | PAID (REC#1749330): extension | NELIDA | NELIDA | | BSP | T | 6865248 |
CMG CORP | B= | P | 02/09/2021 | Temp CO: extension-pending electrical, building and zoning finals ( Expires: 3/11/2021 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6865247 |
CMG CORP | B= | T | 12/03/2020 | PAID (REC#1734222): Temp CO: extension ( Expires: 1/2/2021 12:00:00 AM) | NELIDA | NELIDA | | B= | T | 6795929 |
CMG CORP | B= | P | 10/23/2020 | Temp CO: extension ( Expires: 11/22/2020 12:00:00 AM) | GITA | GITA | | B= | P | 6752614 |
CMG CORP | B= | T | 10/23/2020 | PAID (REC#1724129) TCO. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | GITA | GITA | | B= | T | 6752613 |
CMG CORP | B= | T | 09/09/2020 | PAID (REC#1711484): Temp CO: TCO Pending all required finals/ First 30 days of 90 approved by zoning / Trip f ( Expires: 10/9/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6700782 |
CMG CORP | B= | P | 09/08/2020 | still pending previous inspection comments -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, ALNOR INC. Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6699243 |
CMG CORP | B= | P | 09/04/2020 | missing ANSI compliant counter top at bar area as shown on approved design / need to complete other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, ALNOR INC. Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6697840 |
CMG CORP | BFR | P | 07/09/2020 | pending other rough inspections / observed light gauge framing / reviewed accessible elements with site superintendent | BRIANB | BRIANB | | BFR | P | 6632786 |
CMG CORP | BIN | P | 07/09/2020 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6631313 |
EL PASO ELECTRIC, LLC. | E= | C | 12/11/2020 | Electrical complete / | ROB | ROB | | E= | C | 6805754 |
EL PASO ELECTRIC, LLC. | E= | P | 09/03/2020 | Label panels from one line / One line splice drawings for removal of LG1 and location of panels / Rest - Ok | BRETC | BRETC | | E= | P | 6696328 |
EL PASO ELECTRIC, LLC. | E= | P | 09/01/2020 | Soup kettle, need 3ph 40 or 50 amp cord cap, pull #8 cu / Splice drawings showing new panel location and deletions on panels and one line / Roof - Strap both exhaust fans rest - Ok / | BRETC | BRETC | | E= | P | 6693340 |
EL PASO ELECTRIC, LLC. | ER | C | 09/01/2020 | Above cielings - Ok | BRETC | BRETC | | ER | C | 6693334 |
EL PASO ELECTRIC, LLC. | E= | P | 08/31/2020 | Inspected Kitchen only / Check 208v soup wire, GFCI / Ice maker cord / Brkr lock on oven / Open large Jboxes above panel / Splice one line drawings, 3 panels are shown but only 2 | BRETC | BRETC | | E= | P | 6691511 |
EL PASO ELECTRIC, LLC. | ER | P | 07/09/2020 | All walls ok / Recess fixtures in bar soffit hard lid ok / | ROB | ROB | | ER | P | 6631781 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 09/11/2020 | SMOKE DUCT DETECTOR HAS BEEN REMOVED FROM NOTE 1 ON EQUIPMENT SCHEDULE PER APPROVED SPLICE. | MARKB | MARKB | | H= | C | 6703224 |
ALNOR INC. | H= | C | 09/10/2020 | Condensate complete | MARKB | MARKB | | H= | C | 6701025 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 09/04/2020 | FINAL PENDING - Note 1 under RTU'S on equipment schedule says smoke duct detecors are required. Smoke duct detectors are not required per RTU CFM'S. ABOVE CEILING DUCT, FLEX, DIFFUSERS, GRILLS, HOOD INTERLOCKS, THERMOSTATS, EQUIPMENT ON ROOF ARE ALL COMPLETE. | MARKB | MARKB | | H= | P | 6698161 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 09/04/2020 | Test and Balance Report Received | MARKB | MARKB | | HSP | P | 6697845 |
ALNOR INC. | H= | P | 09/02/2020 | FINAL PENDING - Complete condensate line from wall to floor drain. | MARKB | MARKB | | H= | P | 6694842 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 08/28/2020 | FINAL EQUIPMENT CONNECTIONS, MEDIUM PRESSURE STICKERS, REGULATORS AND TETHERS COMPLETE | MARKB | MARKB | | H= | C | 6689256 |
LANDMARK PLUMBING AND HEATING, INC. | HV | C | 08/28/2020 | WATER HEATER VENT COMPLETE | MARKB | MARKB | | HV | C | 6689253 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 08/26/2020 | GREASE DUCT - 2 LAYERS OF GREASE WRAP AND BANDS COMPLETE FOR BOTH HOODS FROM CURB DOWN TO HOOD COLLARS. | MARKB | MARKB | | HD | P | 6686509 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 08/24/2020 | GREASE DUCT WRAP - Both ducts need to be wrapped up in curb to bottom of curb. Bands inside curbs do not meet wrap instructions. Duct on right hood - cannot verify full 2 layers of wrap, does not measure out to proper thickness. Cannot verify seams are offset correctly. | MARKB | MARKB | | HD | P | 6683809 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 08/24/2020 | Pictures of first layer of grease wrap received | MARKB | MARKB | | HD | P | 6682404 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 08/20/2020 | ADDING LOAD TO GAS METER PER PLAN - COMBINING METERS FOR SUITES 156 INTO 148. | MARKB | MARKB | | HC | C | 6680052 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 08/20/2020 | 10 PSI PRESSURE TEST COMPLETE. PIPING PER PLAN. | MARKB | MARKB | | HI | C | 6680049 |
ALNOR INC. | HRP | P | 08/20/2020 | PRESSURE TEST FOR WALK IN COOLER AND FREEZER CONNECTED TO EQUIPMENT OK. Still need to insulate lines. NO REFRIGERATE ALARMS REQUIRED PER CALC'S PROVIDED ON PLANS. | MARKB | MARKB | | HRP | P | 6680047 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 08/19/2020 | ----ENGINEER OR CONTRACTOR TO ADDRESS: Per plan, RTU-7 & SF-1 area supposed to be on one 11/4" line and kitchen line, water heater & RTU-8 on the other 11/4" line but contractor installed RTU-7, SF-1 And kitchen on one line and water heater and RTU-8 on the other.---- Saw 10 psi test at hood line and one at meter. | MARKB | MARKB | | HI | P | 6678479 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 08/18/2020 | GREASE DUCT LIGHT TEST - LIGHT TEST COMPLETE FOR BOTH DROPS DOWN TO HOOD COLLARS OK TO WRAP. Note: Drops were not wrapped prior to dropping through curb. Will need to verify wrap install up in curbs. | MARKB | MARKB | | HD | P | 6677343 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 08/12/2020 | PLAN SPLICE CHANGED HOODS, MAU, AND GREASE DUCT. HOODS ARE ZERO CLEARANCE. BECAUSE OF PROBLEMS CHANGING OUT PVC PIPE IN PARTY WALL, WILL NEED TO MAKE SURE ALL EQUIPMENT GETS IT'S PROPER CLEARANCE TO COMBUSTIBLES. GREASE DUCT LIGHT TEST ON GROUND - 2 CURB DROPS, 1 HOOD TRANSITION & 1 STRAIGHT PIECE LIGHT TEST OK, STILL NEED BUTT JOINTS. CURB DROPS OK TO WRAP. Still need 4 holes fixed on other hood transition and straight piece. ABOVE CEILING DUCT - MAKEUP AIR DUCT CONNECTED TO HOOD UP TO ROOF OK TO WRAP. | MARKB | MARKB | | HD | P | 6670554 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/26/2020 | REMOVE ALL COMBUSTIBLES FROM HOOD WALL FROM FLOOR LEVEL TO 18" ABOVE HOODS AND 18" ON EITHER SIDE OF HOODS (2 HOODS) | BILLS | BILLS | | HD | P | 6619865 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 09/01/2020 | hoods have been changed to zero clearances per mech inspector | JOHNS | JOHNS | | PTO | C | 6692897 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 09/01/2020 | | JOHNS | JOHNS | | P= | C | 6692893 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 07/08/2020 | pending combustibles in hood wall, rest o.k | JOEL | JOEL | | PTO | P | 6630219 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 06/16/2020 | s.s. and g.w. ok | JOHNS | JOHNS | | PB | C | 6606804 |
EL PASO ELECTRIC, LLC. | XES | T | 12/10/2020 | PAID (REC#1735936): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised panel locations. | BERTHA | BERTHA | | XES | T | 6803730 |
CMG CORP | XBS | T | 10/23/2020 | PAID (REC#1724078): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise counter | MICHAELA | MICHAELA | | XBS | T | 6752002 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 07/16/2020 | PAID (REC#1703351): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: revised hoods | DALEH | DALEH | | XMS | T | 6639446 |