THE WHITING-TURNER CONTRACTING COMPANY | B= | C | 09/27/2022 | | DAKOTAB | DAKOTAB | | B= | C | 7531905 |
THE WHITING-TURNER CONTRACTING COMPANY | B= | P | 08/29/2022 | Temp CO: Pending required inspections ( Expires: 9/28/2022 12:00:00 AM) | AMYP | AMYP | | B= | P | 7498807 |
THE WHITING-TURNER CONTRACTING COMPANY | B= | P | 08/01/2022 | Temp CO: Pending fire and building finals ( Expires: 8/31/2022 12:00:00 AM) | RITA | RITA | | B= | P | 7466058 |
THE WHITING-TURNER CONTRACTING COMPANY | B= | P | 07/06/2022 | Temp CO: Pending fire, zoning, engineering, mechanical and building finals ( Expires: 8/5/2022 12:00:00 AM) | RITA | RITA | | B= | P | 7435701 |
THE WHITING-TURNER CONTRACTING COMPANY | B= | P | 06/23/2022 | pending completion of all other required inspections, building okay / training with Shaun T. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, MTECH MECHANICAL TECHNOLOGIES GROUP, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7422804 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 06/23/2022 | training with BobF- building final/ egress and accessibility | SHAUN | SHAUN | | BSP | P | 7422788 |
THE WHITING-TURNER CONTRACTING COMPANY | B= | P | 06/10/2022 | pending completion of other required inspections - 2nd floor okay except fire caulk in elec rooms -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, MTECH MECHANICAL TECHNOLOGIES GROUP, INC Mechanical Final Inspection is not Completed yet, ELEVATOR: TK ELEVATOR CORPORATION Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7407106 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 05/16/2022 | penetration protection on inside of elevator shaft okay | BOBF | BOBF | | BSP | P | 7376844 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 05/09/2022 | Training with Bob F / Reviewed elements of Building Final / Accessibility requirements | PAULP | PAULP | | BSP | P | 7369275 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 05/09/2022 | training with Bob- building final- accessible elements, counters, reach ranges, grab bars, ramps, floor surfaces, door hardware, signs | SHAUN | SHAUN | | BSP | P | 7369260 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 05/09/2022 | Training with Bob F / Reviewed elements of building final for type II-B addition requirements / Reviewed elements of accessibility to include ramps, handrails, landings, etc. / Reviewed elements of restroom accessibility / Reviewed elements of egress, door hardware, sciffs, door weight, exits, signage, tactile requirements, etc. | CHRISTINEH | CHRISTINEH | | BSP | P | 7369257 |
THE WHITING-TURNER CONTRACTING COMPANY | B= | P | 05/09/2022 | inspection was for main level only / missing ANSI compliant signs throughout / provide penetration protection in elevator equipment room / rest room tile adjacent to breakroom needs tapered transition from tile to concrete floor / training with Christine H, Paul P and Shaun T -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet, MTECH MECHANICAL TECHNOLOGIES GROUP, INC Mechanical Final Inspection is not Completed yet, ELEVATOR: TK ELEVATOR CORPORATION Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7369246 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 04/19/2022 | reviewed elements and time line for building final with Hunter and Creighton via phone | BOBF | BOBF | | BSP | P | 7343020 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 03/31/2022 | courtesy visit to review accessibility requirements at ramps with landings and 180 degree turn - arounds | BOBF | BOBF | | BFR | P | 7322237 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 01/27/2022 | observed intumescent spray at steel beams in east and west stairways, will need sertification of spray as well as depth for rating | BOBF | BOBF | | BFR | P | 7252843 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 12/16/2021 | courtesy visit to clarify RBD inspects to 2009 ANSI, and requirements for grab bars, toilet paper dispensors and air dryers. | BOBF | BOBF | | BFR | P | 7212117 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 12/09/2021 | reviewed requirements for location of swing bars in rest rooms and reviewed the use of CPVC conduit through non rates walls | BOBF | BOBF | | BFR | P | 7204218 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 11/30/2021 | head of wall at 3rd floor supply shaft okay / drywall install at cloud ceilings all 1st floor north end corridors okay | BOBF | BOBF | | BFR | P | 7192258 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 11/18/2021 | wall framing complete on south 1/2 of level 3 / grid x framing for hallways at northeast corner od 1st floor okay | BOBF | BOBF | | BFR | P | 7182662 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 11/11/2021 | non rated wall framing on south half of 3rd floor except area I6 okay, discussed phased final inspections requirements for submitting color coded plan | BOBF | BOBF | | BFR | P | 7173844 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 11/03/2021 | drywall install per V455 at 3rd floor elevator doors and 3rd floor return shaft complete / grid-x framing in auditorium okay | BOBF | BOBF | | BFR | P | 7163896 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 10/21/2021 | detail for W-L-8079 penetration protection on file | BOBF | BOBF | | BFR | P | 7149320 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 10/19/2021 | Final layer drywall install per V455 ayta shaft in room 30001 okay / penetration protection per UL-W-L 8079 at elevator equipment room okay | BOBF | BOBF | | BFR | P | 7147117 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 10/14/2021 | penetration protection at west stairway okay / final layer drywall install at 2nd floor elevators and 2nd floor mech return shaft per v455 okay / reviewed accessible elements for 1st floor restrooms and break room | BOBF | BOBF | | BFR | P | 7142166 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | R | 10/08/2021 | final layer drywall per V455 install at return shaft next to stairs and elect shaft on 3rd floor requires screws 8" on edges and 12" on field | BOBF | BOBF | | BFR | R | 7136057 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 09/23/2021 | Framing per L501 at level 2 elec room on east end okay/ frywall install per V455 and L501 rooms 2001 and 2802 okay / hilti brick install at elec blockouts at west stairs between 1st and 2nd floor okay / training with Christine K, reviewed assemblies V455 and L 501framing and drywall requirements | BOBF | BOBF | | BFR | P | 7118420 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 09/23/2021 | Training with Bob F / Discussed assemblies V455 and L501 | CHRISTINEH | CHRISTINEH | | BSP | P | 7118412 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 09/17/2021 | Framing and core board per V455 for exhaust shaft next to east stairway on 2nd floor okay / framing and coreboard per V 455 each side of elevator doors on 2nd and 3rd floors okay | BOBF | BOBF | | BFR | P | 7111632 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 09/10/2021 | drywall install on inside of rooms 1802 and 1701 per U 465 okay , framing and coreboard per V 455 at mech shafts for east and west returns and middle supply on 2nd and 3rd floors okay / verified FRT stamps are on "C" side of AC plywood | BOBF | BOBF | | BFR | P | 7103768 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 09/01/2021 | framing for rated walls at rooms 1701 and 1802 per U 465 okay / 2nd level wall framing at all corridor walls and primary RF walls okay | BOBF | BOBF | | BFR | P | 7093381 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 08/20/2021 | interior wall framing on 2nd floor from grid line D going south and grid line 4 going east okay / framing for horizontal assembly at future elec room next to west stairs on 2nd floor per L501 okay | BOBF | BOBF | | BFR | P | 7080440 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 08/03/2021 | 2nd layer drywall install per L501 at 2nd floor electric connection room okay | BOBF | BOBF | | BFR | P | 7059360 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 08/02/2021 | Training with Bob F / Reviewed elements of L501 and V455 / Ceiling drywall inspection | PAULP | PAULP | | BSP | P | 7057832 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 08/02/2021 | final layer drywall install per L501 in elevator equipment room okay / framing for shase assembly per V455 and L502 at 2nd floor electric connection room okay / training with Paul P. reviewed elements of L501 and V455 rated assemblies | BOBF | BOBF | | BFR | P | 7057831 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 07/30/2021 | drywall install per U 465 inside of east, west and north walls of west side elec room okay, 1st layer and start of 2nd layer drywall install per L501 in elevator equipment room okay | BOBF | BOBF | | BFR | P | 7056304 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 07/28/2021 | penetration protection above ceiling in elevator equipment room okay | BOBF | BOBF | | BFR | P | 7052993 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 07/20/2021 | shaftwall framing and coreboard per V455 and west side of east stairs 2nd floor okay /pending completion of other required inspections, interior non rated framing on 1st floor okay, framing anf FRT at electric room on west side of 1st floor okay | BOBF | BOBF | | BFR | P | 7042890 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 07/15/2021 | 1st layer drywall install on bottom of shaft in room 1100 per L501 okay / 1st layer drywall install n walls of shaft in room 1100 per V 455 okay | BOBF | BOBF | | BFR | P | 7037776 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 07/12/2021 | Training with Bob F / Reviewed elements of V455 and I501 rated assemblies / Reviewed IECC 402 Commercial Insulation | PAULP | PAULP | | BSP | P | 7032845 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 07/12/2021 | Framing and coreboard per V455 at shaft in roo 110 and continuing to roof okay / framing for horizontal assembly per l 501 in room 1100 okay / framing and core board for ech shaft next to elevator shaft okay / insulation around perimeter of 1st and 2nd floors okay / pentration protection at east stairway okay / training with Paul P. Reviewed rated shaft assemblies, horizontal assemblies and using Hilti bricks for pentration protection | BOBF | BOBF | | BFR | P | 7032838 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 06/28/2021 | penetration protection at rated concrete walls in east stairway okay / non rated wall and ceiling framing on inside of rated walls of east stairway okay / reviewed V455 and I 501 rated assemblies for use in mech shaft at elevator equipment room | BOBF | BOBF | | BFR | P | 7017917 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | L | 06/23/2021 | field canceled by Hunter | BOBF | BOBF | | BFR | L | 7012414 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 06/16/2021 | Drywall install at elevator equipment room per U 465 okay, still need to complete penetration protection / framing and coreboard install at mech shaft in receiving room 1100 is not per listings U 497 and g 586 that are propriatary to national gyp, american installed / insulation at north and exterior walls of non secure office area okay | BOBF | BOBF | | BFR | P | 7004724 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 06/09/2021 | framing at elevator equipment room okay , drywall install per UL 465 at rooms 1202 and 1203 complete / mineral wool and fire spray protection between floor and exterior wall at west wall and north wall to entry okay | BOBF | BOBF | | BFR | P | 6996733 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 05/26/2021 | drywall install per U 465 on sout side of wall room 1202 okay, still need outside walls on north and west side | BOBF | BOBF | | BFR | P | 6982154 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 05/24/2021 | Training with Bob F / Reviewed nonrequired rated assemblies / Reviewed rated assembly U465 / Discussed Skip rooms/walls and egress requirements | CHRISTINEH | CHRISTINEH | | BSP | P | 6979168 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 05/24/2021 | Drywall install at room 1202 per UL U 465 okay, rated wall assembly is not required by IBC / training with Christine K - reviewed rated wall assemblies when not required by IBC , reviewed UL U465 assembly | BOBF | BOBF | | BFR | P | 6979161 |
THE WHITING-TURNER CONTRACTING COMPANY | BIN | P | 05/13/2021 | framing for room 1202 and insulation at exterior wall for room 1202 okay | BOBF | BOBF | | BIN | P | 6967742 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 04/12/2021 | sheathing on exterior west and north sides okay / reviewed elements of accessibility within 1009 ANSI / reviewed requirements for building final in existing building | BOBF | BOBF | | BFR | P | 6930692 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 03/26/2021 | pending other required inspections - exterior FRT shear south wall Grid 9 okay / upper level parapet framing on east and south walls okay | BOBF | BOBF | | BFR | P | 6912550 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 03/17/2021 | pending completion of other inspections / parapet framing from grid lines 1 to 2 and A to E okay / strut clips on exterior wall at grid 7 to 9 and A to E okay | BOBF | BOBF | | BFR | P | 6901990 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 03/10/2021 | exterior structural stud framing below lower roof drom grid line 7 to 9 okay / dens deck installition at inside of parapet on lower roof from grid line 7 to 9 okay | BOBF | BOBF | | BFR | P | 6895584 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 03/04/2021 | parapet framing at lower roof grid line 7 to 9 okay | BOBF | BOBF | | BFR | P | 6888981 |
THE WHITING-TURNER CONTRACTING COMPANY | BFR | P | 02/01/2021 | pending completion of other required inspections - non rated wall framing in rooms E 2001, 2002., 2003 and 2003a OKAY, non rated walls for rooms E1800 and 1900 okay / pending completion of splice for new elec room in existing building framing of 2 new walls to deck okay | BOBF | BOBF | | BFR | P | 6855074 |
THE WHITING-TURNER CONTRACTING COMPANY | BFI | P | 01/22/2021 | R-12,5, 2.5" rigid installed entire perimeter. | NATHAN | NATHAN | | BFI | P | 6845636 |
THE WHITING-TURNER CONTRACTING COMPANY | BSP | P | 01/19/2021 | Met with site superintendents Hunter and Creighton to discuss required inspections and plans, POC are in the notes. | NATHAN | NATHAN | | BSP | P | 6840470 |
GREINER ELECTRIC, LLC. | E= | C | 06/27/2022 | site lighting ----------------- boiler room ------------------- generator ---------------------- tap boxes for buss way --------------- all ok | CRAIG | CRAIG | | E= | C | 7425906 |
GREINER ELECTRIC, LLC. | E= | P | 06/15/2022 | | CRAIG | CRAIG | | E= | P | 7411893 |
GREINER ELECTRIC, LLC. | ER | P | 06/15/2022 | UPS 1, 2, 3. 4, AND 5 OK TAP BOXES IN ROOMS 2803, 2402, 2401, 3401, 3402, 1505, 1407, 10212, 1305, 1309, AND 1311 B OK | CRAIG | CRAIG | | ER | P | 7411879 |
GREINER ELECTRIC, LLC. | EP | P | 06/13/2022 | UPS1B3 100 AMP 4/W OK | CRAIG | CRAIG | | EP | P | 7408697 |
GREINER ELECTRIC, LLC. | E= | P | 06/13/2022 | | CRAIG | CRAIG | | E= | P | 7408693 |
GREINER ELECTRIC, LLC. | ER | P | 06/13/2022 | CH - 1, 2, 3 RTU 1, 2 CH 1, 2, 3 CRAC 1.1, 1.2, 1.3, 2.1, 2..2 OK NOTE | CRAIG | CRAIG | | ER | P | 7408691 |
GREINER ELECTRIC, LLC. | E= | P | 06/10/2022 | | CRAIG | CRAIG | | E= | P | 7408119 |
GREINER ELECTRIC, LLC. | EP | P | 06/10/2022 | NDL3B / T - NDL3B / NH3 / NL3 / T - NL3 / NDH3 / NH3B / NH3A / SL1B ALL OK | CRAIG | CRAIG | | EP | P | 7408098 |
GREINER ELECTRIC, LLC. | E= | P | 06/09/2022 | | CRAIG | CRAIG | | E= | P | 7405171 |
GREINER ELECTRIC, LLC. | EP | P | 06/09/2022 | SL2A / NH2 / SL2B / NH2C / NL2C1 / NL2C2 / NL2B5 / NL3B 1, 2, 3, 4, 5 / NL3A 1, 2 / NL3A3 ALL OK | CRAIG | CRAIG | | EP | P | 7405165 |
GREINER ELECTRIC, LLC. | E= | P | 06/08/2022 | | CRAIG | CRAIG | | E= | P | 7403505 |
GREINER ELECTRIC, LLC. | ER | P | 06/08/2022 | LDF rooms on 2 and 3 floor ok | CRAIG | CRAIG | | ER | P | 7403487 |
GREINER ELECTRIC, LLC. | E= | P | 06/07/2022 | | CRAIG | CRAIG | | E= | P | 7401868 |
GREINER ELECTRIC, LLC. | ER | C | 06/07/2022 | LDF rooms on 1 and 2 floor ok note LDF room 2403 and 2202 not ready up size grd wire to SL2A ok | CRAIG | CRAIG | | ER | C | 7401857 |
GREINER ELECTRIC, LLC. | E= | P | 06/06/2022 | | CRAIG | CRAIG | | E= | P | 7400200 |
GREINER ELECTRIC, LLC. | ER | P | 06/06/2022 | Quad I ok not ready LDF rooms | CRAIG | CRAIG | | ER | P | 7400197 |
GREINER ELECTRIC, LLC. | E= | P | 05/26/2022 | | CRAIG | CRAIG | | E= | P | 7390135 |
GREINER ELECTRIC, LLC. | ER | P | 05/26/2022 | 3 rd floor Quad H ok not ready is LDF rooms 2 nd floor corridor and vault rooms / water fountains ok | CRAIG | CRAIG | | ER | P | 7390132 |
GREINER ELECTRIC, LLC. | E= | P | 05/24/2022 | GFCI protection for water fountains needs to be accessible without tools - still need LDS rooms, vault room and corridor for 2nd floor - all else okay for 2nd floor final | CHIPO | CHIPO | | E= | P | 7387387 |
GREINER ELECTRIC, LLC. | E= | P | 05/16/2022 | | JIMMY | JIMMY | | E= | P | 7376749 |
GREINER ELECTRIC, LLC. | ER | P | 05/16/2022 | Sump pumps need to be single yoke recep or GFCI protected / lights in elevator shaft / elevator room ok | JIMMY | JIMMY | | ER | P | 7376748 |
GREINER ELECTRIC, LLC. | E= | P | 05/10/2022 | | CRAIG | CRAIG | | E= | P | 7370127 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 05/10/2022 | FIRE ALARM INSPECTION: FIRE ALARM COMPLETE | CRAIG | CRAIG | | E= | C | 7369980 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 05/10/2022 | FIRE ALARM INSPECTION: CCF room ok | CRAIG | CRAIG | | ER | P | 7369979 |
GREINER ELECTRIC, LLC. | E= | P | 05/10/2022 | Quad G 1, 2, 3 and 4 ok not ready LDF rooms, 2401 and 2402 rooms | CRAIG | CRAIG | | E= | P | 7369972 |
GREINER ELECTRIC, LLC. | E= | P | 05/05/2022 | | CRAIG | CRAIG | | E= | P | 7365081 |
GREINER ELECTRIC, LLC. | E= | P | 05/05/2022 | QUAD B, C, D, AND E OK NOTE GFI PLUG BY SINK IN ROOM 1018 ---------- GRAB AND GO ROOM NOT READY | CRAIG | CRAIG | | E= | P | 7365080 |
GREINER ELECTRIC, LLC. | E= | P | 05/04/2022 | | CRAIG | CRAIG | | E= | P | 7363211 |
GREINER ELECTRIC, LLC. | E= | P | 05/04/2022 | Quad A ok note room 1308 not ready | CRAIG | CRAIG | | E= | P | 7363210 |
GREINER ELECTRIC, LLC. | E= | P | 04/29/2022 | NOT READY | CRAIG | CRAIG | | E= | P | 7357270 |
GREINER ELECTRIC, LLC. | EP | P | 04/29/2022 | PANELS 70 AMP 4/W SLIC / 60 AMP 4/W SL1A / T - NLM3 15 KVA / 60 AMP 4/W NLM3 / 100 AMP 4/W NHM3 / T - NL2 30 KVA / 100 AMP 4/W NL2 ALL OK
FROM PF - SL2A NEED TO UP SIZE EQUIPMENT GRD WIRE TO 60 AMP SL2A PANEL ( FROM #4 TO #1 CU ) | CRAIG | CRAIG | | EP | P | 7357261 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 04/13/2022 | FIRE ALARM INSPECTION: ABOVE CEILING IN I - 5 AREA FOR FIRE ALARM | CRAIG | CRAIG | | ER | P | 7336546 |
GREINER ELECTRIC, LLC. | EP | P | 04/13/2022 | SUB PANELS 150 AMP 4/W NL2B3 / NL2B4 250 AMP 4/W NL2A1 75 KVA T - NL2A1 ALL OK
| CRAIG | CRAIG | | EP | P | 7336542 |
GREINER ELECTRIC, LLC. | ER | P | 04/13/2022 | ABOVE CEILING IN I - 5 AREA OK | CRAIG | CRAIG | | ER | P | 7336535 |
GREINER ELECTRIC, LLC. | EP | P | 04/07/2022 | SEE NOTES | CRAIG | CRAIG | | EP | P | 7330619 |
GREINER ELECTRIC, LLC. | ER | P | 04/07/2022 | TALKED ABOUT DC CABLES TO UPS RACKS | CRAIG | CRAIG | | ER | P | 7330492 |
GREINER ELECTRIC, LLC. | EP | P | 04/07/2022 | SUB PANELS DSL1, SL1A, NDL3A, NL3A1 WITH 2 SECTIONS , NL3A2 ALL OK PF - NDL3A POWER FILTER AND T - NDL3A 112.5 KVA XFMR OK | CRAIG | CRAIG | | EP | P | 7330483 |
GREINER ELECTRIC, LLC. | EP | P | 04/05/2022 | PF - NDL2B OK 150 KVA XFMR T - NDL2B OK SUB PANELS NDL2B / NL2B1 / NL2B2 / NL2B5 ALL OK | CRAIG | CRAIG | | EP | P | 7326668 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 04/05/2022 | FIRE ALARM INSPECTION: ABOVE CEILING IN AREA I - 4 OK | CRAIG | CRAIG | | ER | P | 7326663 |
GREINER ELECTRIC, LLC. | ER | C | 04/05/2022 | ABOVE CEILING IN AREA I - 4 OK NOT READY ARE ROOMS 3404 NEEDS TO MOVE LIGHT OR RAISE FAN COIL FOR CLEARANCE FOR 480 V DISCONNECT AND 3410 NEEDS TO MOVE SPRINKLER HEAD FOR LIGHT ------ REST OK | CRAIG | CRAIG | | ER | C | 7326658 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 03/25/2022 | FIRE ALARM INSPECTION: 3 RD FLOOR QUAD AREA I - 1 / I - 2 / I - 3 FOR FIRE ALARM IN CEILING OK | CRAIG | CRAIG | | ER | P | 7314646 |
GREINER ELECTRIC, LLC. | EP | P | 03/25/2022 | panels HEM 1 / LEM 1 / NLM1A / NLM1B / NL1B4 AND 15 KVA XFMR T - LEM1 ALL OK | CRAIG | CRAIG | | EP | P | 7314641 |
GREINER ELECTRIC, LLC. | ER | P | 03/25/2022 | 3 rd floor Quad area I 1 / I 2 / I 3 for above ceiling ok | CRAIG | CRAIG | | ER | P | 7314632 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 03/21/2022 | FIRE ALARM INSPECTION: 3 rd floor for area H 1 / H 2 / and H 3 above ceiling for fire alarm ok | CRAIG | CRAIG | | ER | P | 7308597 |
GREINER ELECTRIC, LLC. | ER | P | 03/21/2022 | 3 rd floor for area H 1 / H 2 / and H 3 above ceiling ok | CRAIG | CRAIG | | ER | P | 7308591 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 03/16/2022 | FIRE ALARM INSPECTION: inspection was done on 3/15/2022 | CRAIG | CRAIG | | ER | P | 7303303 |
GREINER ELECTRIC, LLC. | EUG | P | 03/16/2022 | 2 - 1" pvc to last site pole lights --------------------- consultation on RTU' s for working clearance | CRAIG | CRAIG | | EUG | P | 7303302 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 03/15/2022 | FIRE ALARM INSPECTION: ABOVE CEILING IN G 1 AND G 2 AREA ON THIRD FLOOR FOR FIRE ALARM OK | CRAIG | CRAIG | | ER | P | 7302320 |
GREINER ELECTRIC, LLC. | ER | P | 03/15/2022 | ABOVE CEILING IN G 1 AND G 2 AREA ON THIRD FLOOR OK | CRAIG | CRAIG | | ER | P | 7302316 |
GREINER ELECTRIC, LLC. | ER | P | 03/11/2022 | need access to tap boxes for bus way | CRAIG | CRAIG | | ER | P | 7298165 |
GREINER ELECTRIC, LLC. | ER | P | 03/02/2022 | guard shack ok | CRAIG | CRAIG | | ER | P | 7287297 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 03/01/2022 | FIRE ALARM INSPECTION: fire alarm above ceiling in G 1 / G 2 / G 3 / G 4 and G 5 areas | CRAIG | CRAIG | | ER | P | 7285393 |
GREINER ELECTRIC, LLC. | ER | P | 02/28/2022 | ABOVE CEILING IN G 1 / G 2 / G 3 / G 4 / G 5 AREA OK | CRAIG | CRAIG | | ER | P | 7284501 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 02/18/2022 | FIRE ALARM INSPECTION: Fire Alarm above ceiling in F 1 / F 2 / F 3 areas | CRAIG | CRAIG | | ER | P | 7275949 |
GREINER ELECTRIC, LLC. | ER | P | 02/17/2022 | CEILING IN 1000 G AND F 1 AREA / F 2 AREA / F 3 AREA ALL OK | CRAIG | CRAIG | | ER | P | 7274321 |
GREINER ELECTRIC, LLC. | ER | P | 02/15/2022 | lobby 1000 for ceiling ok | CRAIG | CRAIG | | ER | P | 7271016 |
GREINER ELECTRIC, LLC. | EP | C | 02/10/2022 | PF - NH2C 250 AMP 4/W OK PANEL NH2C 250 AMP 4/W OK | CRAIG | CRAIG | | EP | C | 7266445 |
GREINER ELECTRIC, LLC. | ER | P | 02/10/2022 | above ceiling in corridor 1300 ok | CRAIG | CRAIG | | ER | P | 7266440 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 02/04/2022 | FIRE ALARM INSPECTION: FIRE ALARM IN DRIOP CEILING IN CORRIDOR 1005 AND 1005 STORAGE ROOM 1002 / 1003 / 1003 A OK | CRAIG | CRAIG | | ER | P | 7260446 |
GREINER ELECTRIC, LLC. | EP | P | 02/04/2022 | PF - UPS1 450 AMP 2 SET OF 4/W OK 225 AMP 4/W TO NHM1B PANEL OK T - NLM1A 15 KVA XFMR OK T - NDL1B3 300 KVS XFMR OK | CRAIG | CRAIG | | EP | P | 7260442 |
GREINER ELECTRIC, LLC. | ER | P | 02/04/2022 | drop ceiling in rooms 1005 / 1005 storage / 1002 / 1003 / 1003 A | CRAIG | CRAIG | | ER | P | 7260430 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 02/03/2022 | FIRE ALARM INSPECTION: DROP CEILING IN CORRIDOR 1600 AND 1700 FOR FIRE ALARM OK | CRAIG | CRAIG | | ER | P | 7258807 |
GREINER ELECTRIC, LLC. | EP | P | 02/03/2022 | ATS - S HEM1 150 AMP 4/W OK AT - S HSB 175 AMP 4/W OK ECB 25 AMP 4/W / ECB 175 AMP 4/W OK XFMR DSL - 1 112.5 OK DSL - 1 PANEL 400 AMP 2 SET OF 4/W OK | CRAIG | CRAIG | | EP | P | 7258805 |
GREINER ELECTRIC, LLC. | ER | P | 02/03/2022 | DROP CEILING IN CORRIDOR 1700 AND 1600 OK | CRAIG | CRAIG | | ER | P | 7258791 |
GREINER ELECTRIC, LLC. | EP | P | 01/28/2022 | panel s NHM1A 225 AMP 4/W MLO / NH2A 50 AMP 4/W MLO OK PF - NH2A / PF - SL2A POWER FILTERS OK 75 KVA XFMR T - NL2A1 OK 100 AMP 4/W TO TRACK BUSWAY IN ROOM 2803 OK | CRAIG | CRAIG | | EP | P | 7253956 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 01/28/2022 | FIRE ALARM INSPECTION: F A above ceiling in rooms 1603 / 1605 / 1607 / 1608 / 1606 / 1604 / 1602 / 1705 / 1706 / 1704 / 1703 / 1013 / 1006 / 1007 / 1008 / 1101 | CRAIG | CRAIG | | ER | P | 7253923 |
GREINER ELECTRIC, LLC. | ER | P | 01/28/2022 | above ceiling in rooms 1603 / 1605 / 1607 / 1608 / 1606 / 1604 / 1602 / 1705 / 1706 / 1704 / 1703 / 1013 / 1006 / 1007 / 1008 / 1101 | CRAIG | CRAIG | | ER | P | 7253922 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 01/25/2022 | FIRE ALARM INSPECTION: above ceiling for FA in Quad A ok room 1402 Not Ready Corridor 1300 C ok training rooms B 1310 / B 1307 / D 1306 and E 1303 for above ceiling ok | CRAIG | CRAIG | | ER | P | 7249121 |
GREINER ELECTRIC, LLC. | ER | P | 01/25/2022 | above ceiling in Quad A ok room 1402 Not Ready Corridor 1300 C ok training rooms B 1310 / B 1307 / D 1306 and E 1303 for above ceiling ok | CRAIG | CRAIG | | ER | P | 7249120 |
GREINER ELECTRIC, LLC. | EP | P | 01/18/2022 | panels NL1B5 / NH1A / NC1A6 all 100 amp 4/w all ok | CRAIG | CRAIG | | EP | P | 7241263 |
GREINER ELECTRIC, LLC. | ER | P | 01/18/2022 | walls in room COS 1 and soffit in room 2002 A both ok | CRAIG | CRAIG | | ER | P | 7241249 |
GREINER ELECTRIC, LLC. | EP | P | 01/13/2022 | SPD - 2 OK 800 AMP 4/W NDH2 PANEL / 225 AMP 4/W NH1A1 PANEL BOTH OK 112.5 KVA T - NDL1B1 / 75 KVA T - NDL1B2 / 2 - 30 KVA T - NL1A5 and NL2 OK PF - NHM1B and PF - NH1A1 BOTH OK | CRAIG | CRAIG | | EP | P | 7238579 |
GREINER ELECTRIC, LLC. | ER | P | 01/13/2022 | walls in 3 rd floor southwest break room ok | CRAIG | CRAIG | | ER | P | 7238559 |
GREINER ELECTRIC, LLC. | EP | P | 01/11/2022 | PANELS NL1A1 100 AMP 4/W AND NL1A4 100 AMP 4/W BOTH OK 30 KVA TFMR T - NL1A4 OK | CRAIG | CRAIG | | EP | P | 7235989 |
GREINER ELECTRIC, LLC. | ER | P | 01/11/2022 | 3 RD FLOOR NORTH BATHROOM CEILING OK | CRAIG | CRAIG | | ER | P | 7235988 |
GREINER ELECTRIC, LLC. | EP | P | 01/10/2022 | Commercial Service: Panels NL1A2 --- NLIA3 --- NL1B1 --- NL1B2 ---NL1B3 OK. --- | AARONR | AARONR | | EP | P | 7233711 |
GREINER ELECTRIC, LLC. | ER | P | 01/10/2022 | Women's restroom # 3008 hard lid OK. | AARONR | AARONR | | ER | P | 7233706 |
GREINER ELECTRIC, LLC. | EP | P | 01/07/2022 | PF - NDH1B 400 AMP 4/W TO PANEL NDH1B 400 AMP 4/W 60 AMP 4/W NH1B MLO PANEL PANEL NDL1B1 400 AMP 4/W PANEL NDL1B2 250 AMP 4/W ALL OK 45 KVA T - NLM1A 112.5 KVA T - NDL1A BOTH OK | CRAIG | CRAIG | | EP | P | 7232309 |
GREINER ELECTRIC, LLC. | ES | C | 01/07/2022 | Commercial Service: looked at service section 2, 3, and 4 ok | CRAIG | CRAIG | | ES | C | 7232294 |
GREINER ELECTRIC, LLC. | ER | P | 01/07/2022 | inspected up to main disconnect for elevator 2 ok | CRAIG | CRAIG | | ER | P | 7232289 |
GREINER ELECTRIC, LLC. | ER | P | 12/22/2021 | CORRECTOR 1300 C FOR ABOVE CEILING OK HALF WALL IN ROOMS 2002 A / 2302 OK RE LOCK MC CABLE SUPPORT EVER 6' UNDER FLOORS | CRAIG | CRAIG | | ER | P | 7218352 |
GREINER ELECTRIC, LLC. | ER | P | 11/23/2021 | Area I5 walls rooms 3502-3512 and corridors 3500 A,B,C & D. / | LOGANP | LOGANP | | ER | P | 7187417 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/19/2021 | FIRE ALARM INSPECTION: FIRE ALARM IN FIRE HARD LID CEILING IN CORRIDOR QUAD E 1000 B, 10000 C, 1000 D, AND 1000 E OK FIRE ALARM IN 2ND FLOOR BATHROOMS FOR HARD LID CEILING OK | CRAIG | CRAIG | | ER | P | 7183876 |
GREINER ELECTRIC, LLC. | ER | P | 11/19/2021 | HARD LID CEILING IN CORRIDOR QUAD E 1000 B, 10000 C, 1000 D, AND 1000 E OK 2ND FLOOR BATHROOMS FOR HARD LID CEILING | CRAIG | CRAIG | | ER | P | 7183871 |
GREINER ELECTRIC, LLC. | ER | P | 11/17/2021 | walls in Quad I - 4 rooms and break room 3013 ok | CRAIG | CRAIG | | ER | P | 7179867 |
GREINER ELECTRIC, LLC. | ER | P | 11/15/2021 | rough in for walls on 3rd floor zone I - 3 okay | CHIPO | CHIPO | | ER | P | 7176743 |
GREINER ELECTRIC, LLC. | ER | P | 11/10/2021 | WALLS IN QUAD I 1 & 2 OK | CRAIG | CRAIG | | ER | P | 7171826 |
GREINER ELECTRIC, LLC. | ER | P | 11/08/2021 | wall rough 3rd floor zone H3 okay | CHIPO | CHIPO | | ER | P | 7169280 |
GREINER ELECTRIC, LLC. | ER | P | 11/04/2021 | Ceiling in room 1304 Auditorium | JOSEPH | JOSEPH | | ER | P | 7166231 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/03/2021 | FIRE ALARM INSPECTION: Walls ok area H2 rooms 3701-3709 and Corridors 3700 A,B,C,D,E & F. / | LOGANP | LOGANP | | ER | P | 7164342 |
GREINER ELECTRIC, LLC. | ER | P | 11/03/2021 | Walls ok area H2 rooms 3701-3709 and Corridors 3700 A,B,C,D,E & F. / | LOGANP | LOGANP | | ER | P | 7164329 |
GREINER ELECTRIC, LLC. | ER | P | 11/01/2021 | walls on 3 rd floor H 1 Quad ok | CRAIG | CRAIG | | ER | P | 7161114 |
GREINER ELECTRIC, LLC. | ER | P | 10/28/2021 | auditorium walls only ok | CRAIG | CRAIG | | ER | P | 7158320 |
GREINER ELECTRIC, LLC. | ER | P | 10/27/2021 | walls in G 5 area rooms 2502 / 2504 ok | CRAIG | CRAIG | | ER | P | 7156634 |
GREINER ELECTRIC, LLC. | ER | P | 10/25/2021 | walls in 2005, 2006 ok C 1 lights in bathrooms 2008, 2009 ok WALLS IN G 4 AREA OK WALLS IN G 5 OK NOT READY IN G 5 ARE 2502 AND 2504 | CRAIG | CRAIG | | ER | P | 7153191 |
GREINER ELECTRIC, LLC. | ER | P | 10/20/2021 | Walls in areas G2 & G3 rooms 2202-2209 and 2302 -2307 and corridors 2200 A,B,C,D & E and corridors 2300 A,B,C & D--- | LOGANP | LOGANP | | ER | P | 7148696 |
GREINER ELECTRIC, LLC. | ER | P | 10/18/2021 | walls in rooms 2101 thur 2109 and 2010 and 2100 C | CRAIG | CRAIG | | ER | P | 7144937 |
GREINER ELECTRIC, LLC. | ER | P | 10/14/2021 | wall in rooms 2602 thur 2616 and 2 nd floor stair well both ok | CRAIG | CRAIG | | ER | P | 7141790 |
GREINER ELECTRIC, LLC. | EUG | P | 10/11/2021 | 1 1/2 " PVC TO POLE BASIN FOR CAMERA ONLY SOUTH EAST OF SITE OK | CRAIG | CRAIG | | EUG | P | 7137690 |
GREINER ELECTRIC, LLC. | ER | P | 10/11/2021 | HARD LID CEILING IN ROOMS 1310, 1307, 1311, 1000 A VESTIBULE , 1001 AND 3/4" EMT FOR FIRE ALARM HAD CONSULTATION WITH CONTRACTOR FOR VFD' S IN BOILER ROOM FOR WORKING CLEARANCE ( 480 V ) WALLS IN F - 2 QUAD OK | CRAIG | CRAIG | | ER | P | 7137686 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 10/05/2021 | FIRE ALARM INSPECTION: Fire Alarm rough in for 2nd floor area F1 okay | CHIPO | CHIPO | | ER | P | 7130814 |
GREINER ELECTRIC, LLC. | ER | P | 10/05/2021 | Two light pole bases closest to job trailer entrance okay / 2nd floor area F1 rough in okay minus TV wall | CHIPO | CHIPO | | ER | P | 7130804 |
GREINER ELECTRIC, LLC. | ER | P | 09/29/2021 | 3rd floor bathroom walls room #'s 3008 & 3009 ok. / | LOGANP | LOGANP | | ER | P | 7124717 |
GREINER ELECTRIC, LLC. | ER | P | 09/28/2021 | partial walls marked in red ---rooms 2616--2613--2604--2703--2705---ok 6 pole light bases --ok | BRIAN | BRIAN | | ER | P | 7122268 |
GREINER ELECTRIC, LLC. | EUG | P | 09/27/2021 | one light pole base on NW corner of building, 3 on east side of building, and one on NE corner okay | CHIPO | CHIPO | | EUG | P | 7120918 |
GREINER ELECTRIC, LLC. | ER | P | 09/21/2021 | E QUAD RESTROOMS FOR CEILING 1005 B / 1005 C OK 3RD FLOOR WEST STAIR WALLS OK | CRAIG | CRAIG | | ER | P | 7114573 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 09/17/2021 | FIRE ALARM INSPECTION: rough in for fire alarm in rooms 2303, 2304, 2305, 2404, 2406, 2408, 2511, and west stairwell 1st to 2nd floor - okay | CHIPO | CHIPO | | ER | P | 7111987 |
GREINER ELECTRIC, LLC. | ER | P | 09/17/2021 | rough in for walls in rooms 2303, 2304, 2305, 2404, 2406, 2408, 2511, and west stairwell from 1st to 2nd floor okay | CHIPO | CHIPO | | ER | P | 7111984 |
GREINER ELECTRIC, LLC. | ER | P | 08/30/2021 | WALLS IN ROOMS 1001, 1004, 1703, 1704, 1705, 1706, 1801, AND HALLWAY 1700 OK | CRAIG | CRAIG | | ER | P | 7090313 |
GREINER ELECTRIC, LLC. | ER | P | 08/18/2021 | walls in corridor 1400 and room 1404 --------------- 6 TV back boxes ok | CRAIG | CRAIG | | ER | P | 7076221 |
GREINER ELECTRIC, LLC. | ER | P | 08/10/2021 | 2 - 112.5 kva / 1 - 45 kva DSL and NDL1A and NLM1A OK ECB 25 / ECB 175 OK BUSS GUTTER ABOVE ATS OK WALLS IN ROOMS 1602, 1604, 1606 and 1608 OK | CRAIG | CRAIG | | ER | P | 7066586 |
GREINER ELECTRIC, LLC. | EUG | P | 08/04/2021 | 6 pole basin with 2 - 1" pvc and 1 1/2 pvc for data to 1 pole basin ok | CRAIG | CRAIG | | EUG | P | 7059916 |
GREINER ELECTRIC, LLC. | ER | P | 08/04/2021 | walls in rooms 1601, 1603, 1605, 1607, and exterior wall ok | CRAIG | CRAIG | | ER | P | 7059897 |
GREINER ELECTRIC, LLC. | EUG | P | 08/02/2021 | 3/4" pvc for sl bench seat lights on north side of building ok | CRAIG | CRAIG | | EUG | P | 7057094 |
GREINER ELECTRIC, LLC. | ER | P | 08/02/2021 | walls 1401, 1403, 1405, 1406 ok fire alarm in 1401 ok hard lid ceiling 1000 A | CRAIG | CRAIG | | ER | P | 7057083 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 07/28/2021 | FIRE ALARM INSPECTION: FIRE ALARM IN ROOM 1011 B OK | CRAIG | CRAIG | | ER | P | 7052257 |
GREINER ELECTRIC, LLC. | ER | P | 07/28/2021 | HARD LID CEILING IN ROOM 1011 B | CRAIG | CRAIG | | ER | P | 7052246 |
GREINER ELECTRIC, LLC. | ER | P | 07/27/2021 | SEE NOTES | CRAIG | CRAIG | | ER | P | 7049953 |
GREINER ELECTRIC, LLC. | ER | P | 07/27/2021 | inter walls in rooms 1002, 1003, 1003 A, 1310, 1309, 1307, 1306, 1305, AND 1303 ------------ TV BOXES NOT READY IN ROOMS 1303, 1306, 1310 ------------------ EXTERNAL WALL WILL BE SURFACE MOUNT ( GREEN WALL ) PICTURES OF GFIP PAPERWORK OK | CRAIG | CRAIG | | ER | P | 7049951 |
GREINER ELECTRIC, LLC. | ER | P | 07/26/2021 | WALLS IN ROOMS 1002, 1003, 1003 A, 1018 OK | CRAIG | CRAIG | | ER | P | 7048851 |
GREINER ELECTRIC, LLC. | ES | C | 07/26/2021 | Commercial Service: 4000 AMP 4/W NEW SERVICE OK TO SET METER ---------------------------- NOTE INSPECTED TO MAIN BREAKER ONLY --------------- 400 AMP DISCONNECT OK | CRAIG | CRAIG | | ES | C | 7048850 |
GREINER ELECTRIC, LLC. | EUG | P | 07/23/2021 | 4 - 4" pvc for PDS DUCT BANK tied into PDS VAULT OK | CRAIG | CRAIG | | EUG | P | 7046840 |
GREINER ELECTRIC, LLC. | EUG | P | 07/21/2021 | 9 light pole bases with grounded cages along main entry okay / trench for ground level lightning protection ring okay | CHIPO | CHIPO | | EUG | P | 7044257 |
GREINER ELECTRIC, LLC. | ER | P | 07/21/2021 | 2nd floor bath room walls rough in okay | CHIPO | CHIPO | | ER | P | 7044253 |
GREINER ELECTRIC, LLC. | EUG | P | 07/13/2021 | 4 - 4" pvc for PDS duct bank on west side of building ok | CRAIG | CRAIG | | EUG | P | 7033305 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 07/13/2021 | FIRE ALARM INSPECTION: 3/4" conduct for fire alarm in bathrooms 1016, 1017 ok | CRAIG | CRAIG | | ER | P | 7033304 |
GREINER ELECTRIC, LLC. | ER | P | 07/13/2021 | above ceiling in bathrooms 1016, 1017 | CRAIG | CRAIG | | ER | P | 7033298 |
GREINER ELECTRIC, LLC. | EUG | P | 07/07/2021 | 6 - 2" PVC FOR DATA 3" PVC FOR SPARE WEST OF BUILDING OK | CRAIG | CRAIG | | EUG | P | 7027392 |
GREINER ELECTRIC, LLC. | EUG | P | 07/01/2021 | last 4 pole basin on east side ok | CRAIG | CRAIG | | EUG | P | 7022382 |
GREINER ELECTRIC, LLC. | EUG | P | 06/30/2021 | south and east 10 pole basin with 2 - 1" pvc and 1 1/2" pvc for camera east of building 6 - 1" 1 1/4 " 1 1/2" for site home runs | CRAIG | CRAIG | | EUG | P | 7020343 |
GREINER ELECTRIC, LLC. | ER | P | 06/28/2021 | stair well A ok walls in rooms 1005, 1005 A, 1005 B, 1005 E, 1006, 1007, 1008, 1008 A, Fire Alarm for Stair well A and bathrooms for conduit ok | CRAIG | CRAIG | | ER | P | 7017588 |
GREINER ELECTRIC, LLC. | ER | P | 06/07/2021 | elevator room / 1009, 1010, 1100, 1101, and 1102 for walls only | CRAIG | CRAIG | | ER | P | 6992938 |
GREINER ELECTRIC, LLC. | EUG | P | 06/02/2021 | 1" PVC FOR LIGHT POLES AND 1 " PVC TO MUSTER STATION IN CORNER ON SOUTH AND SOUTHEAST OK | CRAIG | CRAIG | | EUG | P | 6988439 |
GREINER ELECTRIC, LLC. | ER | P | 05/26/2021 | rough in for Quad D men's and women's bathrooms okay | CHIPO | CHIPO | | ER | P | 6981781 |
GREINER ELECTRIC, LLC. | EUG | P | 05/26/2021 | stub outs to generator pad okay | CHIPO | CHIPO | | EUG | P | 6981780 |
GREINER ELECTRIC, LLC. | EUG | P | 05/24/2021 | T - 32 BOX HEADING WEST FOR 6 - 2" AND 3:" PVC STOPPING AT FENCE -------------- 1 1/2" PVC HEADING SOUTH TO POLE LIGHTS FOR CAMERA S | CRAIG | CRAIG | | EUG | P | 6978586 |
GREINER ELECTRIC, LLC. | ESL | P | 05/13/2021 | east and north turnstile for security ok | CRAIG | CRAIG | | ESL | P | 6968107 |
GREINER ELECTRIC, LLC. | ER | P | 05/13/2021 | electrical room for walls and 7 soffit lights on north entry area ok | CRAIG | CRAIG | | ER | P | 6968102 |
GREINER ELECTRIC, LLC. | EUG | P | 05/13/2021 | 1 1/2 " pvc to southwest light pole ok | CRAIG | CRAIG | | EUG | P | 6968091 |
GREINER ELECTRIC, LLC. | EUG | P | 05/06/2021 | west side of building 7 - 2" pvc and 3" pvc and 1 1/4" pvc heading west also 6- 4" pvc and 2" pvc and 1" pvc heading west then heading north ok | CRAIG | CRAIG | | EUG | P | 6959553 |
GREINER ELECTRIC, LLC. | EUG | P | 04/22/2021 | 8 pole basin in parking lot ok | CRAIG | CRAIG | | EUG | P | 6943381 |
GREINER ELECTRIC, LLC. | EUG | P | 04/21/2021 | 4 pole basin in parking lot ok | CRAIG | CRAIG | | EUG | P | 6941669 |
GREINER ELECTRIC, LLC. | EUG | P | 04/14/2021 | 8 pole lights bases ok | CRAIG | CRAIG | | EUG | P | 6933719 |
GREINER ELECTRIC, LLC. | EUG | P | 04/06/2021 | 1 1/4" and 1" pvc from old building to new guard shack ok | CRAIG | CRAIG | | EUG | P | 6923435 |
GREINER ELECTRIC, LLC. | EUG | P | 03/31/2021 | 1 " pvc to 9 parking lot pole lights | CRAIG | CRAIG | | EUG | P | 6917728 |
GREINER ELECTRIC, LLC. | ER | P | 03/31/2021 | 8 lighting protection | CRAIG | CRAIG | | ER | P | 6917710 |
GREINER ELECTRIC, LLC. | ER | P | 03/09/2021 | 3 RD FLOOR FOR 20 FLOOR BOXES ONLY OK | CRAIG | CRAIG | | ER | P | 6894099 |
GREINER ELECTRIC, LLC. | ESL | P | 03/09/2021 | EM AND MAIN ELECTRICAL ROOM | CRAIG | CRAIG | | ESL | P | 6894098 |
GREINER ELECTRIC, LLC. | ER | P | 03/01/2021 | 22 floor boxes from C to A column and from 2 to 7 column ok | CRAIG | CRAIG | | ER | P | 6884017 |
GREINER ELECTRIC, LLC. | ESL | P | 02/25/2021 | 8 floor boxes and 10 sleeves on 2 nd floor line 2 to 7 and from E to C only ok | CRAIG | CRAIG | | ESL | P | 6881202 |
GREINER ELECTRIC, LLC. | ESL | P | 02/09/2021 | 4 floor boxes and 4 security turnstiles ok | CRAIG | CRAIG | | ESL | P | 6864715 |
GREINER ELECTRIC, LLC. | ER | P | 01/29/2021 | all of these notes are for existing building for walls in IT room E 1902 A / E 1902 / E 1901 /AV room / Hallway E 1118 / E 2003 do not dry wall south wall / E 2002 do not dry wall west wall / need demo plans for E 1900 / E 1120 before dry wall ESL E 1118 ok to back fill | CRAIG | CRAIG | | ER | P | 6853804 |
GREINER ELECTRIC, LLC. | ESL | P | 01/26/2021 | 2 - 1" pvc with boxes ok | CRAIG | CRAIG | | ESL | P | 6849448 |
GREINER ELECTRIC, LLC. | ESL | P | 01/19/2021 | 2 - 1" pvc to boxes in auditorium existing building will need permit for work being done 3 floor boxes | CRAIG | CRAIG | | ESL | P | 6840953 |
GREINER ELECTRIC, LLC. | ESL | P | 01/04/2021 | 4 floor boxes only ok | CRAIG | CRAIG | | ESL | P | 6824852 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | C | 07/13/2022 | PLAN SPLICES ARE COMPLETE | JERRYF | JERRYF | | H= | C | 7443785 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 07/06/2022 | PARTIAL PENDING APPROVED PLAN SPLICES NOTE / ROOF OK / | JERRYF | JERRYF | | H= | P | 7435872 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 07/06/2022 | NEED ROOF INSPECTION AND PLAN SPLICES NOTE / TAB REPORT AND ENGINEER APPROVAL LETTER FOR TAB RECEIVED | JERRYF | JERRYF | | H= | P | 7435539 |
TK ELEVATOR CORPORATION | H= | C | 06/22/2022 | ELEVATORS COMPLETE | ROBERTV | ROBERTV | | H= | C | 7421687 |
TK ELEVATOR CORPORATION | HE= | P | 05/16/2022 | (ELEVATOR #1) - NEED BUFFER DATA TAGS INSTALLED IN PIT. NEED UPTHRUST ECCENTRIC ADJUSTED ON 2ND FLOOR. (BOTH ELEVATORS) NUMBER BOTH ELEVATOR MACHINES IN MACHINE ROOM..............BOTH ELEVATORS OK FOR PUBLIC USE. | ROBERTV | ROBERTV | | HE= | P | 7377615 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 03/23/2022 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR BDA PAGE 184 - TRAILER SHEET MT - 2M - 102 HIGH LIGHTED IN PURPLE DOTS SA / EX GRILLES IN RESTROOMS (OK) - 3RD FLOOR BDA PAGE 184 - TRAILER SHEET MT - 2M - 103 HIGH LIGHTED WITH BLUE BOX - ALL SA / RA / EXHAUST GRILLES (OK) | JERRYF | JERRYF | | H= | P | 7311719 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 03/08/2022 | UNABLE TO ACCESS PLANS IN COMPUTER - THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR TRAILER SHEET MT - 2M - 101 HIGH LIGHTED IN GREEN BOX SA/ RA GRILLES IN ROOM 1311 (OK) - 2ND FLOOR TRAILER SHEET MT - 2M - 102 HIGH LIGHTED IN PURPLE SA / RA GRILLES CONF. ROOM 2002A AND 2302 (OK) - 3RD FLOOR TRAILER SHEET MT - 2M - 103 HIGH LIGHTED IN PURPLE BOX SA / RA / EXHAUST GRILLES / MAN BAR ACCESS DOORS FROM GRID LINES 2 THROUGH 4 AND A THROUGH E (OK) | JERRYF | JERRYF | | H= | P | 7293737 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 02/22/2022 | THIS INSPECTION WAS FOR THE FOLLOWING BDA PAGE 184 2ND FLOOR SOUTH WEST CORNER -TRAILER SHEET MT - 2M -102 HIGH LIGHTED WITH PINK BOX ABOVE CEILING SA / RA GRILLES AND FINAL CONNECTIONS (QUESTION SERVICE ACCESS AT FCU - 11.4 AND TB 2403 NOTES: ALL SA / RA GRILLES AND FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 7277613 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 02/16/2022 | UNABLE TO VIEW PLAN IN COMPUTER (INSPECTION DONE WITH TRAILER PLANS) THIS INSPECTION WAS FOR THE FOLLOWING - TRAILER SHEET MT - 2M - 101 1ST FLOOR FROM GRID LINES 1 TO 2 AND A THROUGH E - CORRIDOR 1300 B AND TRAILER SHEET MT - 2M - CCF ROOMS - ABOVE CEILING SA / RA / EXHAUST GRILLES AND CONNECTIONS AND GRILLES AT CCF CRAC UNITS IN THESE AREAS (((OK))) | JERRYF | JERRYF | | H= | P | 7272668 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 02/08/2022 | THIS INSPECTION FOR FIRST FLOOR HYDRONIC PIPING AT ROOMS #1504 AND 1407. PIPE TEST OK FOR INSULATION. STILL NEED TO SEE FINAL CONNECTIONS TO CRAC UNITS. PLAN PAGE MT-2M-111, MARKED WITH GREEN DOTS. | BILLS | BILLS | | HWP | P | 7263020 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 02/08/2022 | THIS INSPECTION FOR SECOND FLOOR FINAL-- ABOVE CEILING SUPPLY, RETURN, TRANSFER AIR, AND FINAL CONNECTIONS OK FOR GRID LINES 4.5/7 TO A/C.5 EXCEPT FOR ROOMS #2002A, #2302, AND CORRIDOR #2300C. PLAN PAGE MT-2M-102 MARKED WITH A GREEN BOX. | BILLS | BILLS | | H= | P | 7263010 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 02/03/2022 | FIELD CANCELLED BY CONTRACTOR | BILLS | BILLS | | H= | P | 7259327 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | H= | P | 01/31/2022 | CHANGED INSPECTION TO HEAT FINAL - THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 184 / TRAILER SHEET MT -2M - 102 HIGH LIGHTED WITH BLUE BOX - ABOVE CEILING SA / RA / TRANSFER GRILLES AND FINAL CONNECTIONS FROM GRID LINES A THROUGH E AND 2 THROUGH 4 (ALL GRILLES ARE COMPLETE) | JERRYF | JERRYF | | H= | P | 7255377 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/21/2022 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR -BDA PAGE 185 / TRAILER SHEET MT - 2M - 103 HIGH LIGHTED IN ORANGE - LOW / MEDIUM PRESSURE TIE INS / RUN OUTS / BOXES (ALL OK) | JERRYF | JERRYF | | HD | P | 7246763 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/18/2022 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR- BDA SHEET 185 / TRAILER SHEET MT - 2M - 103 HIGH LIGHTED IN PINK - SOUTH END BOXES / SA MAINS / RUN OUTS / BOXES (OK) - RA / SA MAIN DUCT (OK) | JERRYF | JERRYF | | HD | P | 7241842 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 01/18/2022 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR SOUTH - BDA PAGE 189 / TRAILER SHEET MT - 2M - 113 - SOUTH END HWP HIGH LIGHTED IN GREEN / CHILLED MAINS / BRANCHES (PRESSURE TEST (OK) - PIPING PER PLAN (OK) - NORTH END ALL BOX CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | HWP | P | 7241831 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/14/2022 | THIS INSPECTION WAS FOR THE FOLLOWING 1ST FLOOR BDA PAGES 182 AND 183 - SA / RA / EXHAUST GRILLES / ACCESS DOORS / SOUND BOOTS IN THE FOLLOWING QUAD AREA'S HIGH LIGHTED IN ORANGE SQUARE ON TRAILER SHEET MT - 2M - 101 - NOTES: ALL GRILLES / DOORS ARE COMPLETE) | JERRYF | JERRYF | | HD | P | 7239403 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/10/2022 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR BDA PAGE 183 / TRAILER SHEET MT- 2M- 101 AREA B HIGH LIGHTED WITH PURPLE BOX - ABOVE CEILING SA / RA / EXHAUST GRILLES / FINAL CONNECTIONS / BOXES IN THE FOLLOWING ROOMS - CORRIDOR 1300C / TRAINING ROOMS - 1310 / 1307 / 1306 / 1303 / LDF ROOMS 1309 / 1305 / STORAGE 1302 (OK) 3RD FLOOR BDA PAGE 185 / TRAILER SHEET MT-2M-103 SOUTH SIDE HIGH LIGHTED IN PINK LINE - ABOVE CEILING LOW / MEDIUM PRESSURE SA / RA / EXHAUST MAINS / TIE INS / BOXES (OK) | JERRYF | JERRYF | | HD | P | 7233451 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 01/03/2022 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR NORTH - BDA PAGE 185 / TRAILER SHEET MT - 2M - 103 HIGH LIGHTED WITH YELLOW X - LOW / MEDIUM PRESSURE TIE INS - BOXES - RUN OUTS / EXHAUST MAIN AND RUN OUTS (OK) | JERRYF | JERRYF | | HD | P | 7226198 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/30/2021 | THIS INSPECTION WAS FOR THE FOLLOWING 3RD FLOOR NORTH WEST - BDA PAGE 189 / SHEET MT - 2M - 113 HIGH LIGHTED IN PURPLE - HWP / CHILLED MAIN / BRANCHES / VAV TIE INS (PRESSURE TEST OK AND PIPING PER PLAN) | JERRYF | JERRYF | | HWP | P | 7224753 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/29/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND LEVEL BDA PAGE 184 - TRAILER SHEET MT - 2M - 102 HIGH LIGHTED IN RED X - VAV / MEDIUM / LOW PRESSURE TIE INS (OK) - 3RD FLOOR BDA PAGE 185 - TRAILER SHEET MT - 2M - 103 HIGH LIGHTED IN BLUE X - EXHAUST MAIN / RA / SA MAINS / RUN OUTS (OK) | JERRYF | JERRYF | | HD | P | 7223394 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/21/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR BDA PAGE 184 / TRAILER SHEET MT - 2M - 102 HIGH LIGHTED IN ORANGE DOTS ABOVE CEILING SA MEDIUM AND LOW PRESSURE TIE INS / RUN OUTS / BOXES - PICK FOUR ROOM SA / RA MAIN DUCTS (OK) - 3RD FLOOR BDA 185 / TRAILER SHEET MT - 2M - 103 HIGH LIGHTED IN ORANGE DOTS LOW PRESSURE TIE INS / BOXES / RUN OUTS (OK) | JERRYF | JERRYF | | HD | P | 7217052 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/21/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR NORTH BDA 189 / TRAILER SHEET MT - 2M - 113 HIGH LIGHTED IN ORANGE - CHILLED MAINS AND BRANCHES (TEST OK AND PIPING PER PLAN) | JERRYF | JERRYF | | HWP | P | 7217042 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/20/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 1483 REVISED BOILER ROOM - HWP AND CHILLED MAINS AND TIE INS (OK) - 3RD FLOOR NORTH BDA PAGE 189 / TRAILER PAGE MT - 2M - 113 HIGH LIGHTED IN ORANGE - HWP MAINS AND BRANCHES (OK ) (PIPED PER PLAN) | JERRYF | JERRYF | | HWP | P | 7214641 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/16/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 185 / TRAILER SHEET NUMBER MT - 2M - 103 HIGH LIGHTED IN YELLOW DOTS - RETURN AIR MAIN DUCT FROM GRID LINES 4 THROUGH 2 AND E THROUGH D (OK) | JERRYF | JERRYF | | HD | P | 7211192 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/15/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR BDA PAGE 185 / TRAILER SHEET MT - 2M - 103 HIGH LIGHTED IN YELLOW FROM GRID LINES 2 THROUGH 3 AND LINES A THROUGH C - MEDIUM / LOW PRESSURE SA MAINS / TIE INS / RUN OUTS / RETURN AIR MAIN DUCT / TRANSFERS (OK) | JERRYF | JERRYF | | HD | P | 7209854 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/14/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR BDA PAGE 189 / TRAILER SHEET PAGE MT - 2M - 113 HWP SUPPLY AND RETURN / CHILLED SUPPLY AND RETURN PIPING AT CORRIDOR'S 3000A / 3000C / 3000D HIGH LIGHTED IN YELLOW ON TRAILER PLANS (TESTS OK AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7208537 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/13/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR BDA PAGE 184 - TRAILER SHEET MT - 2M - 102 HIGH LIGHTED IN PURPLE DOTS - RETURN MAIN DUCT AT SOUTH END TO MAN BAR AT CORRIDOR (OK) | JERRYF | JERRYF | | HD | P | 7206360 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/10/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 3RD FLOOR (BDA PAGE 185 / TRAILER SHEET MT - 2M - 103 HIGH LIGHTED IN GREEN - MEDIUM PRESSURE MAIN DUCT AT SOUTH SIDE OF BUILDING (OK) - STILL ALL RUN OUTS | JERRYF | JERRYF | | HD | P | 7205030 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/09/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR BDA PAGE 187 / TRAILER SHEET MT - 2M - 111 HIGH LIGHTED IN PINK - TIE INS AND TEST AT AT FCU UNITS 10 AND 11 (OK) - 3RD FLOOR BDA PAGE 189 / TRAILER SHEET MT - 2M - 113 HIGH LIGHTED IN BLUE - HWP PIPING AND TEST FROM MAINS IN CORRIDOR THROUGH ROOF FOR RTU'S 1 AND 2 (OK) - STILL NEED TIE INS AT UNITS | JERRYF | JERRYF | | HWP | P | 7203357 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | L | 12/08/2021 | NOT READY - STOPPED INSPECTION | JERRYF | JERRYF | | HD | L | 7201680 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/08/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR BDA PAGE 186 / TRAILER SHEET MT - 2M - 11 HIGH LIGHTD IN BLUE CIRCLES - CCF ROOM FCU 11 / CHILLED AND HWP CONNECTIONS AND TEST (OK) - 2ND FLOOR CHILLED AND HWP CONNECTIONS AT FCU'S AND BOXES - BDA PAGE 187 / TRAILER SHEET NUMBER MT 0 2M - 112 HIGH LIGHTED IN RED (OK) | JERRYF | JERRYF | | HWP | P | 7201672 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/07/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR - BDA 183 - TRAILER PAGE SHEET MT - 2M - CCF HIGH LIGHTED IN RED - ABOVE CEILING /FCU'S / SA / RA DROPS IN BOTH CCF ROOMS (OK) BOILER FLUES (OK) ((((STILL NEED COMBUSTION AIR PIPING)))) - 2ND FLOOR BDA 184 / TRAILER PLAN PLAN SHEET MT - 2M - 102 HIGH LIGHTED IN RED DOTS - ABOVE CEILING EXHAUST / SA / RA MEDIUM PRESSURE MAINS IN ROOMS 2000A AND 2000D CORRIDOR (OK) - 3RD FLOOR BDA PAGE 185 - TRAILER SHEET MT - 2M - 103 - HIGH LIGHTED IN PURPLE DOTS - RESTROOM EXHAUST / MEDIUM PRESSURE SA MAIN (OK) | JERRYF | JERRYF | | HD | P | 7200017 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/03/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - LEVEL 1 - CCF ROOM RA TIE INS TO BOXES HIGH LIGHTED IN PINK ON SHEET MT - 2M - 101 ON TRAILER PLANS (OK) LEVEL 2 SOUTH BDA 184 - SHEET MT - 2M - 101 HIGH LIGHTED IN PINK ON TRAILER - ABOVE CEILING LOW PRESSURE RUN OUTS AND Z TRANSFERS (OK) | JERRYF | JERRYF | | HD | P | 7196915 |
THYSSENKRUPP ELEVATOR CORPORATION | HER | P | 12/03/2021 | (ELEVATOR #2) - OK FOR CONSTRUCTION USE. ALLOWANCE OF PRESENTLY INSTALLED ELECTRICAL SHUNT TRIP BREAKERS AND FLOW DEVICE FOR FIRE SPRINKLERS IN ELEVATOR PIT NEED TO BE DISCUSSED WITH COLORADO SPRINGS FIRE DEPARTMENT. FIRE SPRINKLERS IN ELEVATOR PIT WILL NOT AFFECT ELEVATOR OPERATION...... REMAINING ITEMS WILL BE INSPECTED AT FINAL. | ROBERTV | ROBERTV | | HER | P | 7196801 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 12/01/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR BDA PAGE 183 - HIGH LIGHTED IN BLUE ON TRAILER PLANS - CCF ROOMS 1504 AND 1505 - LOW PRESSURE MAINS / TAPS / FCU - (OK) - CORRIDOR 1000K MEDIUM PRESSURE MAIN SA / EX RUN OUTS (OK) - 2ND FLOOR BDA PAGE 184 - SHEET MT -2M - 102 HIGH LIGHTED IN YELLOW SLASH - CORRIDOR 2000D - MEDIUM PRESSURE MAIN AND EXHAUST (OK) | JERRYF | JERRYF | | HD | P | 7194096 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/30/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - LEVEL 2 NORTH BDA PAGE 184 - SHEET MT - 2M - 102 ON TRAILER PLANS HIGH LIGHTED IN BLUE SLASH - ABOVE CEILING SA LOW PRESSURE RUN OUTS AND MEDIUM PRESSURE TIE INS AND BOXES - EXHAUST RUN OUTS (ALL OK) | JERRYF | JERRYF | | HD | P | 7191555 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/29/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR NORTH BDA PAGE 184 - SHEET MT - 2M - 102 HIGH LIGHTED IN PINK DOTS ON TRAILER PLANS FROM GRID LINES 2 THROUGH 4 AND D THROUGH E - LOW PRESSURE RUN OUTS (ALL OK) | JERRYF | JERRYF | | HD | P | 7190112 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/23/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR AREA B SOUTH (BDA PAGE 184 / SHEET MT - 2M - 102 ON TRAILER PLANS HIGH LIGHTED WITH PICK SLASH) MEDIUM PRESSURE SA AND RA MAIN DUCTS (ALL OK) - 3RD FLOOR AREA A NORTH (BDA PAGE 185 / SHEET MT - 2M - 103 HIGH LIGHTED IN PINK SLASH ON TRAILER PLANS ) - (MEDIUM PRESSURE SA MAIN DUCT OK) | JERRYF | JERRYF | | HD | P | 7187939 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 11/18/2021 | INSPECTION FOR THE FOLLOWING-- (MT-2M-112) 65# test ok to level 2 HWP supply and return piping for South wing of building (OK TO INSULATE AND LABEL), 65# test ok to level 2 supply and return chilled water piping for South wing of building (OK TO INSULATE AND LABEL). | PAULO | PAULO | | HWP | P | 7182895 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/18/2021 | INSPECTION FOR THE FOLLOWING-- (MT-2M-101) 1- 8" round duct in lobby (OK TO INSULATE), 2- 10" round supply ducts in (CONNECTOR AREA/OK TO INSULATE). | PAULO | PAULO | | HD | P | 7182878 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/10/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR AREA B / BDA PAGE 182 - SHEET MT - 2M - 101 ON TRAILER PLANS HIGH LIGHTED IN PINK - SLOT DIFFUSERS IN ROOM 1304 AUDITORIUM (ALL OK) - 2ND FLOOR BDA PAGE 183 -/ SHEET MT - 2M - 102 - HIGH LIGHTED IN PINK ON TRAILER PLANS - ABOVE CEILING LOW PRESSURE MAINS AND RUN OUTS (ALL OK) | JERRYF | JERRYF | | HD | P | 7171913 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/08/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR AREA B - BDA PAGE 183 - SHEET MT - 2M - 101 ON TRAILER PLANS HIGH LIGHTED IN BLUE LINE - 2ND FLOOR BDA PAGE MT - 2M - 102 - HIGH LIGHTED IN BLUE - INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR -SA FLEX DUCTS IN AUDITORIUM ((OK)) / FCA 2.5 LOW PRESSURE AND MEDIUM PRESSURE TIE INS / RUN OUTS AND BOX) (((OK)) - 2ND FLOOR BDA PAGE 184 - SHEET MT - 2M - 102 - RA MAIN DUCT IN CORRIDOR 2000C / LOBBY 2000 / / RETURN AIR LOOP IN ROOM 2804 ((((ALL OK))) | JERRYF | JERRYF | | HD | P | 7168518 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/04/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND LEVEL BDA PAGE 184 (SHEET MT - 2M -102 ON TRAILER PLANS HIGH LIGHTED IN GREEN - ABOVE CEILING - BOXES / MEDIUM PRESSURE TIE INS / LOW PRESSURE MAINS / RUN OUTS / TRANSFER DUCTS NOTE: ALL OK | JERRYF | JERRYF | | HD | P | 7165506 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 11/02/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR NORTH END BDA PAGE 184 TRAILER PLAN SHEET MT - 2M - 102 HIGH LIGHTED IN GREEN DOTS NOTES: BOX TB - 2708 BOX / DUCT MAIN AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 7162497 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 11/02/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND LEVEL NORTH HWP / CHILLED MAIN LINES HIGH LIGHTED IN PINK ON TRAILER PLANS SHEET MT - 2M - 112 (BDA PAGE 188) - STILL NEED ALL TIE INS AT ALL BOXES NOTES: PRESSURE TESTS OK AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7162470 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 10/29/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR AREA A FCU #6 IN STAIRWELL B NEXT TO CORRIDOR 1000K BDA PAGE 186 (SHEET MT - 2M - 111 ON TRAILER PLANS HIGH LIGHTED IN PINK SLASH NOTES: PRESSURE TEST OK AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7159498 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 10/28/2021 | THIS INSPECTION WAS FOR THE FOLLOWING 1ST FLOOR AND 2ND FLOOR CONDENSATE DRAINS IN WALLS HIGH LIGHTED IN PURPLE ON SHEET MT - 2M - 111 AND SHEET MT - 2M - 112 TRAILER PLANS ONLY NOTES: DRAINS IN WALL OK | JERRYF | JERRYF | | HWP | P | 7157858 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/28/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR CCF ROOM 1504 - HIGH LIGHTED IN YELLOW ON BDA SHEET 183 / SHEET MT - 2M - CCF PLAN IN TRAILER) NEED APPROVED PLAN SPLICE TO MATCH INSTALLED (CONTRACTOR PROCEEDING AT OWN RISK) / ABOVE CEILING SA / RA MAINS (OK) - 2ND FLOOR MEDIUM PRESSURE SA / RA MAINS (HIGH LIGHTED IN PINK ON BDA PAGE 184 / SHEET MT - 2M - 102 ON TRAILER PLANS (NEED APPROVED SPLICE) SA / RA MEDIUM PRESSURE MAINS OK) | JERRYF | JERRYF | | HD | P | 7157853 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 10/26/2021 | THIS INSPECTION WAS FOR HWP / CHILLED TIE INS AND CONDENSATE DRAINS AT THE FOLLOWING BOXES IN AREA B 1ST FLOOR CORRIDOR 1300C AND AV ROOM 1304 A ON BDA PAGE 187 (SHEET MT - 2M - 111 ON TRAILER PLANS HIGH LIGHTED IN GREEN SLASH NOTES: TIE INS AND DRAINS OK AT THE FOLLOWING BOXES - CORRIDOR 1300 C - FAN COIL UNITS 11.3 / 10.2 / 10.3 / 10 . 4 / 10 . 5 / AV ROOM 1304 A - FCU 2.5 | JERRYF | JERRYF | | HWP | P | 7154602 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 10/20/2021 | THIS INSPECTION WAS FOR CHILLED WATER SUPPLY AND RETURN MAINS ON ROOF FROM DOG HOUSE TO CHILLERS 1 / 2 / 3 ON BDA PAGE 191 - (OK TO INSULATE) NOTES: PRESSURE TEST OK AND PIPING PER APPROVED PLANS | JERRYF | JERRYF | | HWP | P | 7148260 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | L | 10/19/2021 | CANCELED BY CONTRACTOR NOT READY | JERRYF | JERRYF | | HWP | L | 7146283 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/14/2021 | THIS INSPECTION WAS FOR THE FOLLOWING HIGH LIGHTED ON TRAILER PLANS IN RED DOTS - 1ST FLOOR AREA B BDA PAGE 183 SHEET MT - 2M - 101 - FCU 11-3 BOX (OK) - 1ST FLOOR AREA A BDA PAGE 182 SHEET MT - 2M - 101 - SLOT DIFFUSERS IN ROOMS 1001 / LOBBY 1000 / FCU 1005.1 / 1005.2 / TB105A (ALL OK) - 3RD FLOOR BDA PAGE 185 SHEET MT - 2M - 103 FIRE DAMPER FRAMING AT ELECTRIC ROOM 3700C (FRAMING OK) | JERRYF | JERRYF | | HD | P | 7141712 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 10/12/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - AREA B BDA 187 - SHEET MT / 2M - 111 - INSPECTION DONE ON UN APPROVED PLANS HIGH LIGHTED IN RED HASH - CCF ROOM 1504 / CORRIDOR 1000K - PRESSURE TEST OK AND PIPING PER PLAN - TIE INS AT BOXES IN THE FOLLOWING ROOMS - 1400 / 1402 / 1403 (TIE INS OK) | JERRYF | JERRYF | | HWP | P | 7138496 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/12/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR AREA B - BDA 182 - SHEET MT - 2M - 101 HIGH LIGHTED IN SALMON DOTS ON UN APPROVED TRAILER PLANS - MOTHERS ROOM 1818 MEDIUM PRESSURE AND LOW PRESSURE / BOX TIE INS - CORRIDOR 1000K MEDIUM PRESSURE TIE IN (ALL OK) - BDA 184 SHEET MT - 2M - 102 FIRE DAMPER FRAMING AT ELECTRIC ROOM 2713 - (2 DAMPER FRAMING OK) | JERRYF | JERRYF | | HD | P | 7138463 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/11/2021 | THIS INSPECTION WAS FOR 2ND FLOOR - MEDIUM PRESSURE SA MAIN / RUN OUTS / VAV BOX - EXHAUST - BDA PAGE 184 (SHEET MT - 2M - 102 ON TRAILER PLANS - HIGH LIGHTED IN YELLOW - NEED PLAN SPLICE FOR RELOCATING VAV AND MEDIUM PRESSURE TIE INTO WOMEN'S RESTROOM (APPROVED PLAN SHOWS IN CORRIDOR) NOTES: ABOVE CEILING SA / EXHAUST MAINS AND RUN OUTS IN THE FOLLOWING ROOMS OK - MEN'S 2009 / WOMEN'S 2008 / EAST BREAK ROOM 2010 | JERRYF | JERRYF | | HD | P | 7136762 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/07/2021 | NEED APPROVED REVISED PLAN SPLICE TO MATCH INSTALLED THIS INSPECTION WAS FOR 1ST FLOOR AREA A - BDA PAGE 182 TRAILER PLAN SHEET MT - 2M - 101 - HIGH LIGHTED IN PINK DOTS ON TRAILER PLANS - MEDIUM PRESSURE / LOW PRESSURE MAINS / RUN OUTS / BOXES IN THE FOLLOWING ROOMS - OFFICES 1606 / 1604 / 1602 / 1704 / 1703 / 1800 - CORRIDORS 1600B / 1700 / VESTIBUL 1700 NOTES: ALL OK | JERRYF | JERRYF | | HD | P | 7133579 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 10/07/2021 | NEED APPROVED REVISED PLAN SPLICE THIS INSPECTION WAS FOR 1ST FLOOR AREA A - BDA PAGE 186 - SHEET MT - 2M - 111 - HIGH LIGHTED IN DARK PURPLE - HWP / CHILLED MAINS AND CONNECTIONS AT THE FOLLOWING ROOMS - OFFICES 1606 / 1604 / 1602 / 1704 / 1703 / 1800 - CORRIDORS 1600B / 1700 / VESTIBUL 1700 NOTES: ALL PRESSURE TESTS AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7133558 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 10/06/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR AREA B SHEET MT - 2M - 101 ON TRAILER PLANS HIGH LIGHTED IN BLUE DOTS - CORRIDOR 1300 C SA / RA MAINS / BOXES AND RUN OUTS NOTES: DUCT WORK COMPLETE AT THE FOLLOWING FCU BOXES / 10.2 / 10.3 / 10.4 / 10.5 | JERRYF | JERRYF | | HD | P | 7131813 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HC | C | 10/06/2021 | RELEASE METER FOR 2# SYSTEM | JERRYF | JERRYF | | HC | C | 7131800 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HI | C | 10/06/2021 | NEED APPROVED REVISED PLAN ASAP - NEED ELEVATED PRESSURE APPROVAL BY FINAL - AT FINAL VERIFY FINAL CONNECTIONS AT BOILERS AND WATER HEATERS NOTES: PRESSURE TEST OK | JERRYF | JERRYF | | HI | C | 7131797 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HSP | P | 10/05/2021 | WILL REVIEW REGULATOR MANUAL AT NEXT INSPECTION TO VERIFY IF LIMITERS ARE ACCEPTABLE | JERRYF | JERRYF | | HSP | P | 7130220 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HI | R | 10/05/2021 | THIS INSPECTION WAS FOR GAS PRESSURE TEST (BDA PAGE 196)- (LOW TEST) - STOPPED INSPECTION - ((((NEED FURTHER RESEARCH ON REGULATOR VENTING (MORE NOTES TO FOLLOW ON 10 / 6)))) | JERRYF | JERRYF | | HI | R | 7130170 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HI | P | 10/04/2021 | STOPPED INSPECTION NOT READY - THIS INSPECTION WAS FOR THE FOLLOWING BDA PAGE 196 (SHEET 2M - 201 - MEDIUM PRESSURE GAS - NEED THE FOLLOWING - 2# APPROVAL LETTER FROM CSU - 60# TEST ON 100# GAUGE - REVISED APPROVED PLAN TO MATCH INSTALLED LAY OUT - AT FUTURE INSPECTION VERIFY LABELS / REGULATORS / VENTS | JERRYF | JERRYF | | HI | P | 7128488 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 09/30/2021 | WILL NEED ALL REVISED APPROVE PLAN SPLICES FOR 1ST FLOOR AFTER ROUGH INS ARE COMPLETE FOR THIS FLOOR THIS INSPECTION WAS FOR 1ST FLOOR A (BDA PAGE 186 AND 187 ) - SHEET MT - 2M - 111 ON TRAILER PLANS HIGH LIGHTED IN YELLOW HASH MARKS NOTES: HWP TIE INS AND TESTS OK AT THE FOLLOWING BOXES - TB1311-1 / TB1311-2B / TB1200 / TB1000C / TB1010 / FAN COIL PIPING IN WALL AT WEST ENTRYWAY FOR FCU 6.1 | JERRYF | JERRYF | | HWP | P | 7125542 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/30/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR AREA B (BDA 182) - SHEET MT - 2M - 101 ON TRAILER PLANS HIGH LIGHTED WITH GREEN DOTS NOTES: ABOVE CEILING SA MAINS / RUN OUTS / BOXES / MEDIUM PRESSURE TIE INS OK IN THE FOLLOWING ROOMS - MAN BARS IN CORRIDOR 1000B - ROOMS 1801 / 1800 / 1705 / 1703 / CORRIDOR 1700 / VESTIBULE 1700 / 1704 / 1706 / 1003 / 1003A / 1002 / 1001A / 1311 | JERRYF | JERRYF | | HD | P | 7125534 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/28/2021 | WILL NEED ALL REQUIRED PLAN REVISIONS WHEN READY THIS INSPECTION WAS FOR THE FOLLOWING - 1ST FLOOR AREA B SHEET MT - 2M - 101 ON TRAILER PLANS HIGH LIGHTED WITH YELLOW DOTS (BDA SHEET 183) ABOVE CEILING IN THE FOLLOWING ROOMS - 1311 AND 1311 B - (STILL NEED VAV'S) - SA / RA MAINS AND RUN OUTS OK - LDF ROOMS 1306 / 1305 / 1303 - SA / RA MAINS AND RUN OUTS OK - ROOM 1200 (STILL NEED FCU) - ABOVE CEILING SA MAINS AND RUN OUTS OK - LOBBY 1000 G - MEDIUM PRESSURE AND LOW PRESSURE MAINS AND RUN OUTS OK - CORRIDOR 1000 J -SA MAINS AND RUN OUTS OK | JERRYF | JERRYF | | HD | P | 7122181 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/27/2021 | FIRE DAMPER FRAMING OK AT ROOMS #2000, 2201, 3000, 3001, AND 3201. PER CONTRACTOR, ENGINEER LETTER FOR FRAMING REPAIR HAS BEEN SUBMITTED TO PLAN REVIEW (ROOMS #2000 AND #3000, ELEVATOR LOBBIES) | BILLS | BILLS | | HD | P | 7121046 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/24/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND LEVEL SHEET MT - 2M - 102 - (BDA PAGE 184) HIGH LIGHTED IN PURPLE ON TRAILER PLANS NOTES: FIRE DAMPER FRAMING OK AT ROOMS 2001 AND 2808 - ARCHITECT LETTER FOR FRAMING SUPPORT AT 2ND AND 3RD FLOOR EXHAUST SHAFT RECEIVED AND SENT TO SCANNING | JERRYF | JERRYF | | HD | P | 7118952 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/23/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - HIGH LIGHTED IN RED SLASH ON TRAILER PLANS SHEET MT - 2M - 101 - 1 ST FLOOR AREA A - SA / RA DUCT MAINS AND RUN OUTS IN ROOMS 1310 AND 1309 OK - 2ND AND 3RD FLOOR DAMPERS AT EXHAUST SHAFT - NEED DAMPERS FRAMED CORRECTLY WITH FULL LENGTH STUDS OR APPROVED DETAIL FROM ENGINEER APPROVING SPLICED STUDS | JERRYF | JERRYF | | HD | P | 7117490 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 09/20/2021 | THIS INSPECTION WAS FOR AREA B HIGH LIGHTED IN RED ON TRAILER PLANS IN FOR CHILLED WATER TIE INS TO VAV's FROM FROM CORRIDOR 1300C NOTES: HWP / CHILLED PRESSURE TEST FOR TIE INS OK AND PIPING PER PLAN (ok to insulate and label). | PAULO | PAULO | | HWP | P | 7113141 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/20/2021 | THIS INSPECTION WAS FOR THE FOLLOWING HIGHLIGHTED IN RED ON TRAILER PLAN SHEET MT-2M 3RD FLOOR SUPPLY AIR DAMPER FRAMING IN SHAFT AND RETURN AIR FRAMING IN SHAFT CORRECTED FROM PREVIOUS NOTES AND OK, MT-2M 1ST LEVEL AREA B RUN OUTS FROM CORRIDOR 1300C TRUNK OK (ok to insulate). | PAULO | PAULO | | HD | P | 7113095 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/15/2021 | THIS INSPECTION WAS FOR THE FOLLOWING HIGH LIGHTED IN PURPLE ON TRAILER PLANS SHEET MT - 2M - 101 (BDA PAGE 183) - 1ST LEVEL AREA B - MAIN SA DUCT IN CORRIDOR 1300 C (DUCT MAIN OK) - ((((((STILL NEED RUN OUTS TO ROOMS))))) - TRAILER PLANS - SHEET MT - 2M - 103 (BDA PAGE 185 ) HIGH LIGHTED IN PURPLE SHEET MT -2M 3RD FLOOR RETURN DAMPER FRAMING AT WEST RA DUCT IN SHAFT (FRAMING OK) - ((((((NEED SA AND EAST RA SHAFT FRAMING CORRECTED))))) | JERRYF | JERRYF | | HD | P | 7108003 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | L | 09/10/2021 | THIS INSPECTION WAS FOR 2ND AND 3RD FLOOR EXHAUST DUCT AT EAST SHAFT - (((((DUCT BETWEEN 2ND AND 3RD FLOOR OK ONLY)))))) - (((((NEED REVISED PLAN SPLICE FOR RELOCATED SHAFT))))) - STILL NEED SHAFT WALL BUILT AND DAMPERS INSTALLED - STOPPED INSPECTION | JERRYF | JERRYF | | HD | L | 7102884 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/08/2021 | THIS INSPECTION WAS FOR BDA PAGE 182 - LEVEL 1 AREA A FIRE DAMPERS HIGH LIGHTED IN YELLOW ON TRAILER PLANS SHEET MT-2M-101 NOTES: FIRE DAMPERS AT THE FOLLOWING ROOMS 1701 AND 1802 (ALL DAMPER FRAMES OK) | JERRYF | JERRYF | | HD | P | 7099535 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 09/07/2021 | THIS INSPECTION WAS FOR BDA PAGE 182 - LEVEL 1 AREA A FIRE DAMPERS HIGH LIGHTED IN YELLOW ON TRAILER PLANS SHEET MT-2M-101 - STILL NEED DAMPERS FRAMED CORRECTLY NOTE: THE FOLLOWING DAMPERS ARE OK - ROOM 1802 -8 X 10 AND 28 X 14 - ROOM 1701 - 28 X 16 | JERRYF | JERRYF | | HD | P | 7098678 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | L | 09/02/2021 | THIS INSPECTION WAS FOR BDA PAGE 182 LEVEL 1 AREA A FIRE AND FIRE / SMOKE DAMPERS AT THE FOLLOWING ROOMS - LDF 1802 AND ELECTRIC 1701 - STOPPED INSPECTION ( NEED ALL DAMPER FRAMING CORRECTED PER INSTALL MANUAL ) - WILL NEED PLAN REVISION TO MATCH INSTALLED FOR RELOCATED DAMPERS AND DUCT (((((( PER SCRAPPY WITH M TECH ALL PLAN REVISIONS FOR LEVEL 1 WILL BE COMPLETED AFTER LEVEL 1 SYSTEMS ARE COMPLETED)))))) | JERRYF | JERRYF | | HD | L | 7095344 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/31/2021 | THIS INSPECTION WAS FOR THE FOLLOWING BDA PAGE 183 - LEVEL 1 AREA B HIGH LIGHTED IN PURPLE SLASH ON TRAILER PLANS - FIRE DAMPER FRAMING AT ELECTRIC ROOM 1308 (48 X 20 RA / 42 X 14 SA FOR FCU 11 BOTH OK) - ROOMS 1307 AND 1310 - NEED REVISED PLAN FOR RELOCATED 20 X 20 RA DUCT- (TRANSFER DUCTS OK) - ROOM 1311 - STILL NEED BOXES AND MEDIUM PRESSURE TIE INS AND RUN OUTS - (LOW PRESSURE MAINS OK) | JERRYF | JERRYF | | HD | P | 7091660 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/25/2021 | DISCUSSED NEEDING ALL PLAN REVISIONS WITH SCRAPPY AS SOON AS POSSIBLE TO AVOID DELAYS AT FINAL THIS INSPECTION WAS FOR THE FOLLOWING - SHEET MT - 2M - 101 ON TRAILER PLANS HIGH LIGHTED IN BLUE SLASH FOR AREA'S A AND B - MEDIUM PRESSURE MAIN IN AREA A NORTH WEST (OK) - BREAK ROOM 1301 AND STORAGE LOW PRESSURE MAINS / MEDIUM PRESSURE TIE INS AND BOXES OK) - RETURN AIR MAIN ABOVE WOMEN'S RESTROOM (OK) | JERRYF | JERRYF | | HD | P | 7084548 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 08/24/2021 | THIS INSPECTION WAS FOR AREA B HIGH LIGHTED IN BLUE ON TRAILER PLANS IN CORRIDOR 1300 C AND 1300 TO STEEL MAIN TIE INS - HWP / CHILLED MAINS AND STUBS INTO ROOMS - STILL NEED TIE INS AT ALL BOXES NOTES: HWP / CHILLED PRESSURE TEST OK AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7082880 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HRP | P | 08/19/2021 | THIS INSPECTION WAS FOR CONDENSATE DRAIN LINE AT 2ND FLOOR AREA A AT BATHROOM GROUP IN WALL AND EAST STAIRWELL SHAFT FROM 1ST FLOOR THROUGH 2ND FLOOR TO 3RD FLOOR - PIPING PER PLAN | JERRYF | JERRYF | | HRP | P | 7078091 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/19/2021 | UNABLE TO ACCESS PLANS IN COMPUTER - INSPECTION DONE WITH M TECH TRAILER PLANS - ALL HIGH LIGHTED IN PURPLE - THIS INSPECTION WAS FOR 1ST FLOOR AREA A AND B ABOVE CEILING SHEET MT - 2M - 1010 - THE FOLLOWING IS OK - MEDIUM PRESSURE MAIN DUCT IN VESTIBULE 1300 AND 1300B - MEDIUM PRESSURE DUCTS IN CORRIDOR 1000B NOTES: ALL STATED ABOVE OK | JERRYF | JERRYF | | HD | P | 7078058 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/10/2021 | THIS INSPECTION WAS FOR THE FOLLOWING 1ST FLOOR AREA A - BDA PAGE 182 HIGH LIGHTED IN GREEN SLASH ON TRAILER PLANS NOTES: ABOVE CEILING EXHAUST TO JANITOR ROOM 1005A (OK) - CORRIDOR 1000D AND 1000E MEDIUM PRESSURE SUPPLY MAIN (OK) | JERRYF | JERRYF | | HD | P | 7066391 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 08/10/2021 | THIS INSPECTION WAS FOR 1ST FLOOR AREA A BDA PAGE 186 HIGH LIGHTED IN YELLOW ON TRAILER PLANS - HWP PIPING AND TIE INS TO ALL BOXES IN THE FOLLOWING ROOMS - 1005 GRAB AND GO / 1005A WARMING / 1000 LOBBY / 1002 OFFICE (TEST OK AND PIPING PER PLAN) | JERRYF | JERRYF | | HWP | P | 7066386 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/06/2021 | THIS INSPECTION WAS FOR LEVEL 2 F/SD FRAMING AT RTU#2 RA MAIN AND MEDIUM PRESSURE SUPPLY DUCT AT SHAFTS - INSPECTION DONE WITH UN APPROVED ARCHITECT / ENGINEER DETAIL (CONTRACTOR PROCEEDING AT OWN RISK) - DETAIL IS BEING SUBMITTED - WILL HIGH LIGHT TRAILER PLANS AT NEXT INSPECTION NOTES: 2 DAMPER FRAMES OK PENDING DETAIL APPROVAL | JERRYF | JERRYF | | HD | P | 7063114 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 08/05/2021 | THIS INSPECTION WAS FOR THE FOLLOWING LEVEL 1 AREA A HIGH LIGHTED IN GREEN ON TRAILER PLANS - HWP AND SNOW MELT MAINS AND PRESSURE TEST FOR HWP LINES IN CORRIDOR 1000K NOTES: TEST OK AT HWP MAINS IN CORRIDOR 1000K / HWP TEST OK AND PIPING PER PLAN FROM MECHANICAL ROOM TO HUDDLE AREA 1008A AT TURN | JERRYF | JERRYF | | HWP | P | 7061646 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/04/2021 | THIS INSPECTION WAS FOR 1ST LEVEL AREA A BDA PAGE 182 SHEET MT - 2M - 101 HIGH LIGHTED IN BLUE ON PLANS AT TRAILER -LOW PRESSURE MAIN DUCT IN CORRIDOR 1300C (OK) MEDIUM PRESSURE MAIN DUCT FOR RTU 1 IN ROOM 1100 AND MEDIUM PRESSURE SA ELBOW IN 1000D (BOTH OK TO WRAP) | JERRYF | JERRYF | | HD | P | 7059964 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 08/04/2021 | THIS INSPECTION WAS FOR 1ST LEVEL AREA A /BDA PAGE 186 / SHEET MT - 2M - 111 HIGH LIGHTED IN ORANGE ON M TECH PLANS AT TRAILER FOR HWP AND SNOW MELT MAINS - STILL NEED PRESSURE TEST NOTES: MAINS OK TO INSULATE | JERRYF | JERRYF | | HWP | P | 7059936 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 08/02/2021 | NEED PLANS REVISED TO MATCH INSTALLED THIS INSPECTION WAS FOR LEVEL AREA A - BDA PAGE 182 / SHEET 2M - 101A - HIGH LIGHTED IN PINK SLASH LINES - LOW PRESSURE MAINS AND BOXES IN THE FOLLOWING ROOMS 1100 / 1101 / 1102 / 1103 - MEDIUM PRESSURE MAIN IN LOBBY 1000 / 1880 OPEN OFFICE OK - EXHAUST MAINS AND RUN OUTS IN ROOMS HALLWAY 1000B / WARMING 1005E / 1005C / 1005D / 1005B OK | JERRYF | JERRYF | | HD | P | 7057128 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 07/27/2021 | THIS INSPECTION WAS FOR LEVEL 1 AREA B - ABOVE CEILING LOW PRESSURE - SA MAINS / RUN OUTS / BOXES IN ROOM 1307 (TRAINING ROOM) HIGH LIGHTED IN GREEN / BDA PAGE 183 SHEET MT - 2M - 101 NOTES: ABOVE CEILING LOW PRESSURE SA MAINS AND RUN OUTS / BOX OK | JERRYF | JERRYF | | HD | P | 7050139 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 07/23/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - HWP / CHILLED MAINS FROM MECHANICAL ROOM TO 1ST / 2ND / 3RD FLOOR RISERS ONLY - 1ST FLOOR / BLUE BEAM PAGE 187 / SHEET 2M- 111 / 2ND FLOOR / BLUE BEAM PAGE 188 SHEET 2M - 112 / 3RD FLOOR / BLUE BEAM PAGE 189 SHEET 2M - 113 - HIGH LIGHTED IN PINK WITH BLUE BORDER ON M TECH TRAILER PLANS / NOTES DATED 7 / 23 / 21 NOTES: PRESSURE TESTS OK AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7047121 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 07/21/2021 | HAD CONSULT WITH G.C AND M TECH PROJECT MANAGER ON DAMPER INSTALL AT SHAFTS - NEED ARCHITECT / ENGINEER STAMPED APPROVED DESIGN DETAIL SHOWING HOW DAMPERS ARE SUPPORTED AT BUMP OUTS AT SHAFTS ON BDA PAGE 184 / 2ND FLOOR 40 X36 RA DUCT AND 46 X 28 SA DUCT AND BDA PAGE 185 / 3RD FLOOR 36 X 18 RA DUCT AND 50 X 30 SA DUCT (((((DESIGN DETAIL MUST MEET THE INTENT OF DAMPER MANUFACTURES TESTING AND DESIGN CRITERIA - ((((((CONTRACTOR PROCEEDING AT OWN RISK - CONTRACTOR TO SUPPLY PICTURES OF ALL FRAMING AND SUPPORT AT DAMPERS TO VERIFY IT MEETS DESIGN DETAIL))))) NOTES: BDA PAGE 183 HIGH LIGHTED IN GREEN - ABOVE CEILING SA MAINS / RUN OUTS AND THE FOLLOWING BOXES TB1304 - 1 / 1304 - 2 / 1304-3 ARE COMPLETE IN THE FOLLOWING ROOMS AUDITORIUM / 1303 / 1306 | JERRYF | JERRYF | | HD | P | 7043661 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 07/21/2021 | THIS INSPECTION WAS ELEVATOR ROOM 1011B / BDA PAGE 186 - FCU LINES IN ROOM TO OUTSIDE WALL AT CORRIDOR - STILL NEED TIE INS AT MAINS AND FAN COIL UNIT NOTES: PRESSURE TEST OK AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7043634 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 07/20/2021 | THIS INSPECTION WAS FOR LEVEL 2 BDA 184 - SHEET MT - 2M - 102 SHAFT SUPPLY MAIN DAMPERS - COULD NOT LOCATE WALL SECTION OR ENGINEERING DETAILS IN PLAN FOR 40 X 36 AND 46 X 28 DAMPERS AT BUMP OUTS IN SHAFT - STOPPED INSPECTION - RE INSPECT ALL AT NEXT INSPECTION NOTES: 2ND LEVEL 40 X 36 RA DAMPER FRAMING OK AT SHAFT AT EAST STAIRWELL OK | JERRYF | JERRYF | | HD | P | 7041982 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 07/20/2021 | NEED 60# TEST ON 100# GAUGE AT LEVEL 1 ELEVATOR MACHINE ROOM - WILL VERIFY TEST AT NEXT INSPECTION NOTES: PIPING PER PLAN FROM ELEVATOR ROOM THROUGH WALL WHERE IT STOPS | JERRYF | JERRYF | | HWP | P | 7041981 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | L | 07/15/2021 | CANCELED AT CALL AHEAD BY CONTRACTOR - NOT READY | JERRYF | JERRYF | | HD | L | 7037598 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 07/14/2021 | THIS INSPECTION WAS FOR THE FOLLOWING HIGH LIGHTED IN ORANGE ON M TECH TRAILER PLANS - BDA PAGE 196 BOILER ROOM - ABOVE CEILING LOW PRESSURE SA DUCT (((OK))) - BDA PAGE 182 - ABOVE CEILING MEDIUM PRESSURE TIE INS AT LOBBY ROOM 1000 (((OK))- - MEDIUM PRESSURE SA DUCT AT ROOM 1800 (((OK))) | JERRYF | JERRYF | | HD | P | 7035164 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 07/08/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - LEVEL 1 AREA A - LOBBY ROOM 1000 - GRAB AND GO ROOM 1005 HIGH LIGHTED IN ORANGE BDA PAGE 182 ABOVE CEILING SA MAINS / RUN OUTS / BOXES FPTB 1000 -2 / FPTB1000-E / FPTB 1005-1 / FPTB-1005-2 OK - LEVEL 2 AREA A BDA PAGE 184 HIGH LIGHTED IN BLUE SUPPLY AIR 46 X 28 F/SD DAMPER CONNECTION OK (((((STILL NEED WALL FRAMING))))) ALL PREVIOUS NOTES HIGH LIGHTED ON M TECH TRAILER PLANS | JERRYF | JERRYF | | HD | P | 7028586 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 07/06/2021 | THIS INSPECTION WAS FOR BDA PAGE 182 / SHEET M2. 2M - 101 / LEVEL 1 AREA A HIGH LIGHTED IN BLUE ON M TECH PLANS IN TRAILER - F/D FRAMING OK FOR 68 X 30 DAMPER AT MOTHERS ROOM 1008 - F/D DAMPER RETAINAGE OK AT 86 X 34 SA MAIN IN ROOM 1011B - MEDIUM PRESSURE SA MAIN DUCT OK IN CORRIDOR 1000B | JERRYF | JERRYF | | HD | P | 7025271 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/30/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - LEVEL 1 MAIN SA SHAFT F/SD DAMPER TIE IN AT ELECTRIC ROOM 1011B (NEED TO CONFIRM ANCHORS IN 1 SIDED RETAINAGE AT FUTURE INSPECTION) - MEDIUM PRESSURE TIE AT VAV 1008B OK IN WOMEN'S RESTROOM ROOM 1016 | JERRYF | JERRYF | | HD | P | 7020313 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 06/29/2021 | THIS INSPECTION WAS FOR THE FOLLOWING AREA A 1ST FLOOR - BDA PAGE 186 SHEET MT - 2M - 111 - HWP PRESSURE TEST OK AND PIPING PER PLAN FROM VAV 1008A TO MAINS IN MEN'S AND WOMEN'S RESTROOM HIGH LIGHTED IN PURPLE ON M TECH PLANS IN TRAILER NOTES: PRESSURE TEST OK AND PIPING PER PLAN | JERRYF | JERRYF | | HWP | P | 7018821 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/29/2021 | THIS INSPECTION WAS FOR THE FOLLOWING AREA A 1ST FLOOR - BDA PAGE 182 SHEET MT - 2M - 101 ABOVE CEILING SA / EX MAINS AND VAV 1008A IN MEN'S AND WOMEN'S RESTROOM STILL NEED RUN OUTS AND MEDIUM PRESSURE TIE IN TO VAV 1008A - HIGH LIGHTED IN PURPLE ON M TECH PLANS IN TRAILER NOTES: SA / EX MAINS OK | JERRYF | JERRYF | | HD | P | 7018816 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HO | P | 06/25/2021 | THIS INSPECTION WAS FOR UNDER GROUND GAS LINE TO GENERATOR SHOWN ON BDA PAGE 1185 (ENLARGED MECHANICAL ROOM PLAN) NOTES: PRESSURE TEST OK AND PIPING PER PLAN | JERRYF | JERRYF | | HO | P | 7015755 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 06/22/2021 | THIS INSPECTION WAS FOR HWP LINES TO RTU 1 AND 2 FROM CURB THROUGH ROOF ONLY ON BDA PAGE 189 HIGH LIGHTED IN PURPLE ON PLANS AT M TECH TRAILER NOTES: PRESSURE TESTS AND PIPING DROPS OK ONLY THROUGH ROOF | JERRYF | JERRYF | | HWP | P | 7011386 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/17/2021 | RTU-1 RETURN AIR FIRE/SMOKE DAMPER FRAMING AND ANNULAR SPACING OK. HIGHLIGHTED ON CONTRACTORS SITE PLAN IN PURPLE/ | BILLS | BILLS | | HD | P | 7006714 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 06/17/2021 | CONDENSATE DRAIN LINES OK AT WOMAN'S REST ROOM #1016 AND AT JANITORS CLOSET #1015 ACROSS CORRIDOR #1000J. HIGHLIGHTED ON CONTRACTORS SITE PLAN IN PURPLE. | BILLS | BILLS | | HWP | P | 7006640 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 06/10/2021 | **UNABLE TO ACCESS PLANS ON LAPTOP. WILL UPDATE INSPECTION COMMENTS WITH PLAN PAGES AND BDA NUMBERS.** THIS INSPECTION FOR FIRE DAMPER FRAMING AT NORTH WALL OF ELEVATOR EQUIPMENT ROOM #1011B. | BILLS | BILLS | | HD | P | 6998272 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 06/10/2021 | **UNABLE TO ACCESS PLANS ON LAPTOP. WILL UPDATE INSPECTION COMMENTS WITH PLAN PAGES AND BDA NUMBERS.** THIS INSPECTION FOR IN-WALL CONDENSATE DRAIN LINES AT VESTIBULE #1000F AND FOR IN-WALL SNOW MELT LINES AT THE DOORWAY BETWEEN LOBBY #1000 AND GRAB AND GO ROOM #1005 | BILLS | BILLS | | HWP | P | 6998265 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 06/02/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 192 AREA A - CONDENSATE DRAIN IN WALL ONLY OK AT ROOMS 1010 AND 1016 (PIPING PER PLAN) | JERRYF | JERRYF | | HWP | P | 6988158 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 05/14/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - BDA PAGE 183 - 1ST FLOOR ELECTRIC ROOM #1308 - DAMPER FRAMING OK AT 48 X 20 RETURN AND 42 X 14 SUPPLY OPENINGS | JERRYF | JERRYF | | HD | P | 6968931 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 04/16/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - 1ST THROUGH 3RD FLOOR MEDIUM PRESSURE DUCTS IN SHAFTS ALL HIGH LIGHTED IN BLUE ON OFFICE PLANS - NEED PROPER CLEARANCE FOR DUCT INSULATION AT RTU 1 AND 2 MEDIUM PRESSURE AT 3RD FLOOR AND 3RD CEILING WHERE DUCT IS TIGHT TO STRUCTURE NOTES: RTU 1 AND RTU 2 RETURN AIR DUCTS OK FROM 1ST FLOOR THROUGH ROOF | JERRYF | JERRYF | | HD | P | 6936526 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | P | 03/25/2021 | ABOVE CEILING SA / VAV BOX OK AT BOX TBE - 210B | JERRYF | JERRYF | | HD | P | 6910469 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HD | R | 01/14/2021 | ----ENGINEER TO ADDRESS---- COS-1 AREA "A" SHEET 1M-101: DAMPER FRAMING INSPECTION FOR ELECTRICAL ROOM E1120 - APPROVED PLANS DO NOT SHOW A RATED WALL OR DAMPERS. DAMPER FRAMING FOR TRANSFER IS FRAMED PER MANUFACTURER INSTRUCTIONS. Damper framing for exhaust fan is not framed correctly. | MARKB | MARKB | | HD | R | 6836204 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | HWP | P | 12/30/2020 | ----WILL NEED MECHANICAL CONTRACTORS TO CLAIM FULL MECHANICAL SCOPE ON THEIR PERMIT ATTACHMENTS TO INCLUDE: FAN POWERED BOXES, FAN COIL UNITS, BOILERS, FUEL BURNING VENTS, DUCT, HYDRONIC PIPING, GAS PIPING AND EXHAUST FANS---- 50 PSI PRESSURE TEST AND INSULATION OK FOR 2 1/2" UNDERGROUND SNOW MELT PIPING ON PLAN SHEET 2M-111A FROM NOTE M23 TO PROPOSED MANIFOLD BOX LOCATION HIGHLIGHTED BLUE IN TRAILER OK TO COVER | MARKB | MARKB | | HWP | P | 6822129 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 06/14/2022 | Corrections made. | DANR | DANR | | P= | C | 7411301 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 06/07/2022 | Need inspection mechanical room / restrooms 1005C and D both lacking 60" from toilet wall to edge of lavatory ( at 58-3/4") / Both 2nd and 3rd floor accessible toilets over 18" off partition ( at 18-1/2") / | DANR | DANR | | P= | P | 7402652 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 05/16/2022 | Changed PSP inspection to PTO inspection / Elevator sump discharge piping and connection to pump OK | ADRIANM | ADRIANM | | PTO | C | 7376715 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 01/20/2022 | Remainder ok. | DANR | DANR | | PTO | C | 7245528 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/22/2021 | 2nd floor west break room in wall and overhead DWV and domestic water ok 3rd floor men/ women and hallway DWV overhead ok | ANTHONYT | ANTHONYT | | PTO | P | 7218074 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/12/2021 | 3rd floor DWV and domestic water in wall East break room, mop sink, and drinking fountain only: ok to insulate domestic water. | DANR | DANR | | PTO | P | 7174900 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/09/2021 | DWV in wall 3rd floor restrooms ok/ 4" VTR from 1st to roof in 3rd floor mens restroom ok. | DANR | DANR | | PTO | P | 7170012 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/08/2021 | 1st floor: Need ICW tie in between columns 4 -5 and E - D / rest ok for 1st floor. 2nd floor: ok for water corridors 2000 D and 2000 E. 3rd floor: DWV men's restroom lavatory wall ok / water all restroom ok to insulate . Note: need drain downs for roof hydrants. | DANR | DANR | | PTO | P | 7168424 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/20/2021 | 2nd floor drinking ftn and mop sink dwv and domestic ok note : domestic water corridor 2000 A/E/D , 2003 west break room remaining
| ANTHONYT | ANTHONYT | | PTO | P | 7147940 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/18/2021 | 2nd floor brake room 2010 w/v and domestic / corridor 2000D/2000B domestic overhead / 2009/2008 men/women dwv and domestic complete | ANTHONYT | ANTHONYT | | PTO | P | 7145631 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/06/2021 | 1st floor DWV stubbed to 2nd floor room 1020 ok. | DANR | DANR | | PTO | P | 7131637 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/04/2021 | 1st floor DWV room 1406 ok. To complete PTO need the following: 1st floor: corridor 1301 over head domestic water tie in / DWV column 5 - E / room 1504 domestic water. 2nd floor: corridor 2000D domestic water / DWV and domestic water rooms 2003 and 2010. 3rd floor: all DWV and domestic water. Note: at final check water heaters, water entry ( will need backflow protection hose end valves ), and backflows / discussed accessible elements. | DANR | DANR | | PTO | P | 7129416 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/30/2021 | To complete PTO need the following: 1st floor: corridor 1301 over head domestic water tie in / DWV room 1406 and by column 5 - E / room 1504 domestic water. 2nd floor: corridor 2000D domestic water / DWV and domestic water rooms 2003 and 2010. 3rd floor: all DWV and domestic water. Note: at final check water heaters, water entry ( will need backflow protection hose end valves ), and backflows / discussed accessible elements. | DANR | DANR | | PTO | P | 7126280 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/08/2021 | 1st floor Domestic water mains: Need corridor 1300C and insulation. 2nd floor Domestic water restroom only: Need nail protection and insulation. Note: At final check water entry, mechanical room equipment connections, and water heaters. | DANR | DANR | | PTO | P | 7100628 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/30/2021 | DWV and venting for break sink room 1301 and corridor 1300C / plans marked. | DANR | DANR | | PTO | P | 7090808 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/28/2021 | ok for 3rd floor drain line in wall @ baths 208 and 209 for 3rd floor fixtures, to include both 3rd floor bath floor drains, 3rd floor mop sink, 3rd floor drinking fountain, and the 4" stack capped off above floor @ 3rd floor only today | JOHNS | JOHNS | | PTO | P | 7051742 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/27/2021 | DWV 2nd floor restroom 208 and 209: Need drain lines in toilet wall / rest ok for DWV this area. | DANR | DANR | | PTO | P | 7049979 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/22/2021 | Elevator pump discharge piping stubbed into elevator shaft ok./ need pumps hooked up. | DANR | DANR | | PTO | P | 7045127 |
OLSON PLUMBING & HEATING COMPANY | PRD | C | 07/22/2021 | Remainder of roof drains and overflows ok. | DANR | DANR | | PRD | C | 7045126 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/20/2021 | Need plans splice for added hub drain for ice maker in break room 1005C / DWV ok and domestic water ok to insulate for corridor 1000B, break room 1005B, and restrooms 1005D - 1005E. Note: Discussed accessible elements. | DANR | DANR | | PTO | P | 7041602 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 07/16/2021 | 3rd floor primary and secondary drains between columns A - E and 2 - 5 leak by column C - 3 rest ok this area / plans marked. | DANR | DANR | | PRD | P | 7038280 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/13/2021 | Domestic water in wall for mop sink and drinking fountain room 1015 ok to insulate. DWV vent from stand pipe by room 1203 ok / DWV room 1000J up to lav risers in restroom 2008 ok / Plans marked for this inspection and previous inspection. | DANR | DANR | | PTO | P | 7033267 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/02/2021 | 1-1/2" hot & cold water piping overhead in woman's 1016 . DWV overhead vent piping in men's 1017 . Mop sink DWV from L2 room 2007 down to men's 1017 . Drawings not available to document inspection . | FRANKM | FRANKM | | PTO | P | 7024683 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 07/02/2021 | 8" storm @ level 1 between grids E & D and between 7 & 9 up to level 2 . 2 - 8" & 1 - 6" overflow storm piping between grids 2 & 4 and between A & D to exterior scuppers 6" storm & overflow @ grid B & 2 ( exclude 3" branch's 6" storm & overflow between grids 1 & 2 between C & E up to roof . 2 - 8" storm & 1 - 8" overflow overhead in mens room 1017 through janitor 1015 up to level Drwgs not available to document areas inspected | FRANKM | FRANKM | | PRD | P | 7024674 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/30/2021 | H2O above ceiling at 1st floor men's restroom ok, 6 inch S.S. for 2nd floor restrooms ok, plans marked. | TAYLOR | TAYLOR | | PTO | P | 7021466 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/22/2021 | 1st floor mens' and Women's trap primers and nail protection ok / plans marked. | DANR | DANR | | PTO | P | 7011752 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 06/22/2021 | Cast roof drains between columns 7 - 9 and A - E ok / plans marked. | DANR | DANR | | PRD | P | 7011749 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/08/2021 | 1st floor mens' and Women's in wall domestic and DWV only: ok to insulate domestic water / need test on trap primer feed lines / need nail protection. Note: discussed accessible elements. | DANR | DANR | | PTO | P | 6995295 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/07/2021 | ok for in wall dwv / water @ 1st floor men's urinal and lav group (1 wall) only today, ok to insulate the waters in this area, plans marked
NOTE: verify access panel @ hammer arrestor @ 1st mens urinal (in wall mid high) and verify clean out @ last mens urinal (low in wall) | JOHNS | JOHNS | | PTO | P | 6993581 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 01/06/2021 | DWV between columns 1 and 2 ok / Need CSU to inspect water stub in. | DANR | DANR | | PB | P | 6827633 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/06/2021 | 6" underground storm between columns 1 and 3 ok / plans marked. | DANR | DANR | | PRD | P | 6826717 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/22/2020 | 10" underground storm to stub ups between columns 2 and 3 ok / plans marked. | DANR | DANR | | PRD | P | 6816121 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 12/18/2020 | Area A DWV for restrooms 1016 and 1017, corridor 1000J, and janitors room 1015: Corrections made / plans marked. | DANR | DANR | | PB | P | 6813754 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 12/18/2020 | Area A DWV for restrooms 1016 and 1017, corridor 1000J, and janitors room 1015: Need to bed and grade mop sink, floor sink and branch line to urinal / rest ok / plans marked. | DANR | DANR | | PB | P | 6812615 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 12/10/2020 | Boiler room 1205 ok. | DANR | DANR | | PB | P | 6803856 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 11/18/2020 | Columns lines A - E, 7.5 - 9 ok / plans marked. | DANR | DANR | | PB | P | 6781398 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/16/2020 | 8'' storm drain, area b.5, c.5 to 7, area 9 overflow, test and design ok ( plan marked ) | TED | TED | | PRD | P | 6777140 |
OLSON PLUMBING & HEATING COMPANY | PB | R | 11/11/2020 | No approved plumbing plans. | DANR | DANR | | PB | R | 6773045 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 07/07/2022 | PAID (REC#1882342): PLAN SPLICE FEE: $150 by: TCRIPPEN for Mechanical: Approved : New splice pages for duct sizes. HVAC piping, Condensation drain lines, Gas lines, And Exhaust Venting. | TCRIPPEN | TCRIPPEN | | XMS | T | 7437299 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 03/28/2022 | PAID (REC#1854442): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Fire extinguisher locations | SHELLEY | SHELLEY | | XBS | T | 7317103 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 02/14/2022 | PAID (REC#1843937) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added beam and column listings to stair b | LBENNETT | LBENNETT | | XBS | T | 7269467 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 10/20/2021 | PAID (REC#1817702): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: see cloulded areas enlarged mechanical | TCRIPPEN | TCRIPPEN | | XMS | T | 7148605 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 10/05/2021 | PAID (REC#1812427): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 84, 111 revisions: adjusted sheet 2P-110A, 2P-111A and 2P-114A. | SHANEN | SHANEN | | XPS | T | 7130360 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 10/05/2021 | PAID (REC#1812421): PLAN SPLICE FEE: $95.83 by: LBENNETT for Construction: Roof assembly RA4 @ connector; rated wall assembly R443 @ shaft adjacent to stair A: add rated ceiling assembly @ elev machine room and LDF; other revisions | LBENNETT | LBENNETT | | XBS | T | 7130297 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 09/27/2021 | PAID (REC#1810728): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 126 revisions: adjusted sheet 2P-101B. | SHANEN | SHANEN | | XPS | T | 7120706 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 09/27/2021 | PAID (REC#1810174): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Removed guard shack foundation; minor layout revisions; see AM&M for accessibility @ back to back doors | LBENNETT | LBENNETT | | XBS | T | 7120686 |
GREINER ELECTRIC, LLC. | XES | T | 08/25/2021 | PAID (REC#1802533): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Power and lighting revisions throughout. Revised panel schedules. | BERTHA | BERTHA | | XES | T | 7084684 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 08/24/2021 | PAID (REC#1801498): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new mechanical splice see clouds, | TCRIPPEN | TCRIPPEN | | XMS | T | 7083680 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 08/06/2021 | PAID (REC#1797065): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: COS-2/G206 revised fastening details | LBENNETT | LBENNETT | | XBS | T | 7064244 |
GREINER ELECTRIC, LLC. | XES | T | 06/22/2021 | PAID (REC#1785119): PLAN SPLICE FEE: $70.83 by: BERTHA for Electrical: Revisions throughout - revised power, lighting, schedules and one-line. | BERTHA | BERTHA | | XES | T | 7010872 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 06/22/2021 | PAID (REC#1783772): PLAN SPLICE FEE: $75 by: TCRIPPEN for Mechanical: Approved New splice see individual pages for changes, | TCRIPPEN | TCRIPPEN | | XMS | T | 7010671 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 06/22/2021 | PAID (REC#1785708) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 60, 74, 86, 87 revisions: Adjusted sheet 1P-002, 2P-101A, 2P-111A and 2P-114A. | SHANEN | SHANEN | | XPS | T | 7010539 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 06/22/2021 | PAID (REC#1783550): PLAN SPLICE FEE: $70.83 by: LBENNETT for Construction: New UL assemblies V455 & I501; other misc revisions | LBENNETT | LBENNETT | | XBS | T | 7010440 |
GREINER ELECTRIC, LLC. | XES | T | 05/18/2021 | PAID (REC#1775090): PLAN SPLICE FEE: $225 by: BERTHA for Electrical: Revisions throughout. | BERTHA | BERTHA | | XES | T | 6971805 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 04/27/2021 | PAID (REC#1770255): PLAN SPLICE FEE: $112.5 by: LBENNETT for Construction: New beam listing; misc revisions | LBENNETT | LBENNETT | | XBS | T | 6948105 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 03/22/2021 | PAID (REC#1760667): PLAN SPLICE FEE: $83.33 by: TCRIPPEN for Mechanical: see all pages for changes | TCRIPPEN | TCRIPPEN | | XMS | T | 6905924 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 03/19/2021 | PAID (REC#1765074): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 43 revisions: 2P-102, 2P-111A, 2P-111B, 2P-112, 2P-113, 2P-114A, 2P-114B, 3P-202 adjusted plumbing plans. Delta 42 revisions: 4P-401 adjusted elevator sump detail | SHANEN | SHANEN | | XPS | T | 6905048 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XMS | T | 03/01/2021 | PAID (REC#1753884): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: okay new splice exhaust fans | TCRIPPEN | TCRIPPEN | | XMS | T | 6883220 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 02/27/2021 | PAID (REC#1753540): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: New roof openings in COS-1 | LBENNETT | LBENNETT | | XBS | T | 6883128 |
GREINER ELECTRIC, LLC. | XES | P | 02/22/2021 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power and schedules. | BERTHA | BERTHA | | XES | P | 6877118 |
THE WHITING-TURNER CONTRACTING COMPANY | XBS | T | 02/18/2021 | PAID (REC#1751390): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Wall type revisions @ rooms E1120 & E1902A | LBENNETT | LBENNETT | | XBS | T | 6874156 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 11/13/2020 | PAID (REC#1729522): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: Added plumbing to foundation permit | TCRIPPEN | TCRIPPEN | | XPS | T | 6775421 |