GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 06/07/2021 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 6992348 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/03/2021 | still pending other final inspections / Additional Inspections Required (computer generated): U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6989903 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/29/2021 | Building final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, A COOL BREEZE HEATING & AIR CONDITIONING Mechanical Final Inspection is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6951679 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/29/2021 | ABOVE LID -- All above lid firestopping at penetrations OK -- Detail for shaftwall terminating at steel column OK per detail in splice | DAKOTAB | DAKOTAB | | BSP | P | 6951674 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/21/2021 | Inspection not ready -- Need to complete firestopping of penetrations at corridor | DAKOTAB | DAKOTAB | | BSP | P | 6941735 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/19/2021 | 1st and 2nd layer at shaft wall OK per V455 -- 1st and 2nd layer at door way firebarrier OK per V489 -- Still need to inspect all firestopping through out | DAKOTAB | DAKOTAB | | BFR | P | 6938326 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/15/2021 | 2HR. SHAFT AT CORRIDOR G191 -- Items from previous inspection corrected -- Steel stud framing and 1" gypsum panel OK -- Face layer of gypsum OK -- Spoke with site super about need for 3rd party observation for mono-coat reinstallation at steel beam | DAKOTAB | DAKOTAB | | BSP | P | 6936002 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/14/2021 | 2HR FIRE BARRIER RE-INSPECTION -- CORRIDOR G 191 -- Still have steel channel framing steel beam not ran to deck above, framing stop halfway through steel beam -- Other items from previous inspection on fire barrier corrected -- Firestopping at bus duct in kitchen OK pending receipt of EJ -- Still need to EJ for bus duct penetration on corridor side and still need to inspect | DAKOTAB | DAKOTAB | | BFR | P | 6933254 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/12/2021 | 2HR FIRE-BARRIER INSPECTION - MTL FRAMING / CORRIDOR G 191 / V489 and V455 assemblies / wall framing for 2hr fire barrier (V489) stops at steel beam above - need details on how continuity will be achieved to deck above / portion of mtl framing and 1" gyp panels for fire barrier are (V455) interrupted by steel beam and do not extend to deck above / discussed needing fire stop details for through penetrations at fire barrier and inspected with site superintendent | BRIANB | BRIANB | | BFR | P | 6930402 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/05/2021 | ABOVE LID AND HEAD OF WALL -- Still need to splice in detail for terminating shaft into coloumn -- Still need listing for 16" steel pipe penetration -- Rest of head of wall and firestopping at above lid OK | DAKOTAB | DAKOTAB | | BSP | P | 6921569 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/23/2021 | Need to splice plan to show shaft assembly terminating at intermediate column -- Multiple penetrations at shaft wall have been correctly spaced to provide annular space for each penetration, will need listing for firestopping 16" steel pipe penetration -- 2nd layer of 5/8" gypsum at shaft wall OK per V455 | DAKOTAB | DAKOTAB | | BFR | P | 6877965 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/16/2021 | 1st layer of 5/8" gypsum at 2hr shaft wall OK per UL V455 -- Still need to inspect firestop system at multiple plumbing penetrations at shaft wall | DAKOTAB | DAKOTAB | | BSP | P | 6870774 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/04/2021 | Firestopping at 2hr fire barrier -- Need to label 2hr fire barrier above lid at door way -- Still need to inspect brick firestopping system at 4" penetrations at fire barrier per listing in splice -- Rest of firestopping at 2hr fire barrier OK | DAKOTAB | DAKOTAB | | BFR | P | 6859549 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/01/2021 | 2nd layer of gyspum at 2hr fire barrier at doorway OK per UL V489 -- Still need to inspect head of wall detail and firestopping at penetrations | DAKOTAB | DAKOTAB | | BFR | P | 6854544 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/28/2021 | 1st layer of type X drywall at 2hr fire barrier at doorway OK per UL V489 | DAKOTAB | DAKOTAB | | BFR | P | 6851297 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/25/2021 | Items from previous inspection corrected -- 2hr shaft framing and 1" gypsum panel liner OK per UL V455 -- Smoke barrier framing OK per UL V489 -- Remainder of light gauge framing OK -- Training with Erik | DAKOTAB | DAKOTAB | | BFR | P | 6847156 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/19/2021 | 2hr FIRE BARRIER -- 1" American gypsum panel not apart of the U415 listing, Will need to splice in new listing if 1" American gypsum panel is to be used -- Plan calls for 2hr fire barrier to extend to double doors into kitchen however currently stops at wall next to door -- Discussed gypsum requirements for 1hr fire barrier per U419 -- Light gauge framing at interior non-rated walls OK pending other roughs -- Still need to inspect all framing and gypsum at 1hr fire barriers | DAKOTAB | DAKOTAB | | BFR | P | 6839540 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/06/2021 | Framing at interior in-fill wall at kitchen OK -- Discussed 2hr shaft with site super per UL U415 -- Discussed need for listing for multiple plumbing penetrations that will not allow proper annular space between penetrations -- Reviewed Accessible Elements | DAKOTAB | DAKOTAB | | BFR | P | 6827023 |
ENCORE ELECTRIC, INC. | E= | C | 05/10/2021 | | RANDY | RANDY | | E= | C | 6963583 |
ENCORE ELECTRIC, INC. | E= | P | 04/28/2021 | whats left to inspect in kitchen is AIC ratings on panels and schedules------also check for splices for surge suppressor on panels and kitchen table fed by load center needing gfci protection----electrically safe for move in | RANDY | RANDY | | E= | P | 6951039 |
ENCORE ELECTRIC, INC. | E= | P | 04/26/2021 | exhaust fans breakers and fuses corrected | RANDY | RANDY | | E= | P | 6947410 |
ENCORE ELECTRIC, INC. | E= | P | 04/22/2021 | finals marked on plans | RANDY | RANDY | | E= | P | 6944292 |
ENCORE ELECTRIC, INC. | E= | P | 04/20/2021 | CU-6----CU-5----CU-7 ok------CU-4,3 and 2 wrong size fuses------finals for walls marked on plans | RANDY | RANDY | | E= | P | 6940946 |
ENCORE ELECTRIC, INC. | ER | P | 04/15/2021 | ceilings marked on plans | RANDY | RANDY | | ER | P | 6936009 |
ENCORE ELECTRIC, INC. | EP | P | 04/14/2021 | kitchen panels on equipment ok | RANDY | RANDY | | EP | P | 6934185 |
ENCORE ELECTRIC, INC. | EP | P | 04/13/2021 | panels EHGKA, ELGKA and transformer ok--------will need splice on 2 new surge protectors added to EHGKA and ELGKA by final-------- Splice required, please submit splice for changes in scope. If unfamiliar in submitting electronic splice, please click the following link: https://youtu.be/dG3kHpgDP0w / | RANDY | RANDY | | EP | P | 6932457 |
ENCORE ELECTRIC, INC. | ER | P | 04/09/2021 | ceilings marked on plans | RANDY | RANDY | | ER | P | 6928882 |
ENCORE ELECTRIC, INC. | ER | P | 02/08/2021 | walls stubbed up to ceiling space marked on plans | MATTHEW | MATTHEW | | ER | P | 6863070 |
ENCORE ELECTRIC, INC. | ER | P | 01/27/2021 | walls marked on plans | RANDY | RANDY | | ER | P | 6850606 |
ENCORE ELECTRIC, INC. | ESL | P | 01/27/2021 | pvc's from wall to panels in kitchen (normal power) | RANDY | RANDY | | ESL | P | 6850599 |
ENCORE ELECTRIC, INC. | ER | P | 01/21/2021 | walls marked on plans | RANDY | RANDY | | ER | P | 6844810 |
ENCORE ELECTRIC, INC. | ER | P | 01/14/2021 | electric room wall rough marked on plans | RANDY | RANDY | | ER | P | 6837006 |
ENCORE ELECTRIC, INC. | ER | P | 01/05/2021 | main kitchen equipment wall | RANDY | RANDY | | ER | P | 6826282 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 06/07/2021 | TEST AND BALANCE REPORT RECEIVED. SEE IMAGES. | LIDO | LIDO | | H= | C | 6992347 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 06/04/2021 | TEST AND BALANCE REPORT IS BEING REVIEWED./ | LIDO | LIDO | | H= | P | 6990824 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | H= | C | 05/03/2021 | REFRIGERATION CONTRACTOR COMPLETE. | LIDO | LIDO | | H= | C | 6954624 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | H= | P | 04/30/2021 | FINAL PENDING : CONTRACTOR STILL NEEDS TO ADD TWO CONDENSERS TO THEIR SCOPE OF WORK. 1 FOR THE COOLER AND 1 FOR THE FREEZER / | LIDO | LIDO | | H= | P | 6952971 |
A COOL BREEZE HEATING & AIR CONDITIONING, LLC | H= | P | 04/29/2021 | WALK IN COOLER / FREEZER CONDENSATE COMPLETE ( inspected on 4/15/21)/ REFRIGERATION COMPLETE (inspected on 4/15/21)/ FINAL PENDING : CONTRACTOR TO ADD 2- CONDENSERS TO THE SCOPE OF WORK , AND REQUEST A FINAL INSPECTION /
| LIDO | LIDO | | H= | P | 6951427 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 04/29/2021 | GAS CONTRACTOR COMPLETE / | LIDO | LIDO | | H= | C | 6951420 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 04/26/2021 | ALL REMOTE SMOKE INDICATORS IN PLACE / ROOM TEMP SENSORS FOR CAPTIVE AIR HOOD IN PLACE / FINAL PENDING : NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 6947209 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 04/26/2021 | FINAL PENDING : CONTRACTOR THAT INSTALLED WALK IN COOLER / FREEZER TO ATTACH TO PERMIT AND SHOW COOLER / FREEZER ON SCOPE OF WORK. ALSO NEED TO SHOW TWO CONDENSERS ( 1- for cooler / 1- for freezer) ON THERE SCOPE OF WORK / NOTES PERTAINING TO WALK IN COOLER / FREEZER WILL TRANSFER OVER WHEN CONTRACTOR IS ATTACHED . | LIDO | LIDO | | H= | P | 6947188 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 04/21/2021 | ALL GREASE DUCT FIRE BARRIER WRAP INCLUDING ALL GREASE DUCT ACCESS DOORS OK / | LIDO | LIDO | | H= | P | 6942186 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 04/21/2021 | Stamped engineer letter pertaining to round / square grease duct access doors received. See images. | LIDO | LIDO | | H= | P | 6941404 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 04/20/2021 | FINAL PENDING : ADD WALK IN COOLER / FREEZER TO SCOPE OF WORK / TO ADD TWO CONDENSERS ( 1- for cooler / 1- for freezer) TO SCOPE OF WORK / | LIDO | LIDO | | H= | P | 6941077 |
OLSON PLUMBING & HEATING COMPANY | HI | C | 04/20/2021 | GAS INSTALL AND GAS CONNECTIONS TO COOK-LINE COMPLETE. ALL EQUIPMENT RESTRAINTS COMPLETE / | LIDO | LIDO | | HI | C | 6941076 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 04/20/2021 | HOOD INTERLOCK INSPECTION : HOOD # 4, 5, 6 AND 7 OK / | LIDO | LIDO | | H= | P | 6940636 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 04/19/2021 | EF-6 (on roof) GREASE OUTLET EXTENSION TO GREASE CATCH COMPLETED. SEE IMAGES / ROOF COMPLETE / | LIDO | LIDO | | H= | P | 6937542 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 04/15/2021 | FINAL PENDING : ADD WALK IN COOLER / FREEZER TO SCOPE OF WORK / TO ADD TWO CONDENSERS ( 1- for cooler / 1- for freezer) TO SCOPE OF WORK / CONNECT GAS TO FRYER WHEN FRYER IS INSTALLED / | LIDO | LIDO | | H= | P | 6936096 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 04/15/2021 | COOK LINE GAS CONNECTIONS: MISSING FRYER. REST OK. | LIDO | LIDO | | HI | P | 6936095 |
OLSON PLUMBING & HEATING COMPANY | HRP | C | 04/15/2021 | REFRIGERATION COMPLETE / | LIDO | LIDO | | HRP | C | 6936094 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 04/15/2021 | Changed to complete (LM) 8:14 / DISHWASHER STEAM PIPE INSULATED / WALK IN COOLER / FREEZER CONDENSATE COMPLETE / | LIDO | LIDO | | HWP | C | 6935889 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/14/2021 | KEF_ 6 : GREASE DUCT FIRE BARRIER WRAP COMPLETE / 5 ACCESS DOORS STILL NEED CORRECTIONS. REST OF GREASE DUCT FIRE BARRIERS WRAP COMPLETE / | LIDO | LIDO | | HD | P | 6933502 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 04/13/2021 | Contractor has chosen to fabricate grease duct access doors. Do not have a full two layers at the access door stand offs for the round grease duct (see note 4.) Engineer to provide information for how to fix this. | LIDO | LIDO | | H= | P | 6932521 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/12/2021 | PLAN PAGE MH-102 FIRE / SMOKE DAMPER FRAMING (RECEIVED STAMPED ENGINEER LETTER PERTAINING TO DAMPER ABOVE A DOUBLE DOOR. SEE IMAGES. : NEED REVISED AND APPROVED PLANS FOR SMOKE DAMPER CHANGED TO A COMBINATION FIRE SMOKE DAMPER / DAMPER FRAMING OK / | LIDO | LIDO | | HD | P | 6930001 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/07/2021 | RELOCATED DISHWASHER : MEDIUM PRESSURE SUPPLY AND RETURN STEAM - 150 LB TEST OK. WALK IN COOLER FREEZER : CONDENSATE PIPE INSTALL OK. HEAT TAPE INSTALLED ON CONDENSATE PIPE IN FREEZER ( ok to insulate )/ | LIDO | LIDO | | HWP | P | 6925743 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/06/2021 | ROOF COMPLETE ( except for kef-6 - complete pipe extension to grease catch) / ABOVE CEILING - SUPPLY, RETURN, EXHAUST, FLEX DUCT, GRILLS AND REGISTERS COMPLETE / | LIDO | LIDO | | HD | P | 6923947 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/31/2021 | KEF-6 GREASE DUCT LIGHT TEST : GREASE DUCT CONNECTION TO OVEN OK. NO HOLES / DISHWASHER ALUMINUM DUCT RE - CONNECTION OK / | LIDO | LIDO | | HD | P | 6917912 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/30/2021 | GREASE DUCT LIGHT TEST ON ROOF : KEF-1,2,4,5 AND 6 OK NO HOLES. GRADE FOR GREASE DUCT IS AWAY FROM FAN / | LIDO | LIDO | | HD | P | 6915643 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/29/2021 | GREASE DUCT LIGHT TEST ON ROOF : KEF-5 OK NO HOLES. GRADE ON GREASE DUCT IS AWAY FROM FAN / | LIDO | LIDO | | HD | P | 6914507 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/25/2021 | Questioning how the fire barrier wrap will be applied over the round grease duct access doors so as to achieve the intent of the manufacturer requirements. | LIDO | LIDO | | HD | P | 6911431 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/25/2021 | Stamped engineer letter pertaining to grease duct reservoir drain outlet received. See images. | LIDO | LIDO | | HD | P | 6911429 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/24/2021 | GREASE DUCT ACCESS DOOR / FIRE WRAP BARRIER INSULATION ( rectangular duct ) : 5 ACCESS DOORS NOT OK ( access doors are marked) / 26 ACCESS DOORS OK / | LIDO | LIDO | | HD | P | 6909347 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/23/2021 | HOOD 3 - QUESTIONING HOW WILL CONTAINMENT (6" minimum overhang required) FOR EQUIPMENT UNDER HOOD BE ACHIEVED ON THE SIDES? . HOOD - 1,2,3,4,5,6 AND 7 INSTALL OK / | LIDO | LIDO | | HD | P | 6907896 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/19/2021 | UPDATED NOTES PERTAINING TO GREASE DUCT SLOPPING TOWARD THE UTILITY EXHAUST FANS / GREASE DUCT ON ROOF: GREASE DUCT IS SLOPPING TOWARDS ALL UTILITY EXHAUST FANS. DUCT SYSTEMS SHALL BE INSTALLED SO THAT GREASE CANNOT COLLECT AT ANY PORTION THEREOF. THERE IS A FLEX CONNECTOR AT THE GREASE DUCT CONNECTION FOR EACH EXHAUST FAN. STEPS FOR PREVENTION OF GREASE ACCUMULATION IN GREASE DUCT MUST BE MADE. SEE 2015 CODE SECTION 506.3.7. ALSO SEE 506.3.2.3 FOR PROPER DUCT -TO-EXHAUST FAN CONNECTIONS
| LIDO | LIDO | | HD | P | 6905590 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/19/2021 | GREASE DUCT LIGHT TEST ON ROOF INSPECTION : KEF-2 GREASE DUCT. 1 HOLE / | LIDO | LIDO | | HD | P | 6905532 |
OLSON PLUMBING & HEATING COMPANY | HRP | P | 03/19/2021 | LINE SET FOR COOLER / FREEZER INSTALLED FROM CONDENSER LOCATION TO COOLER / FREEZER OK / | LIDO | LIDO | | HRP | P | 6905527 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/18/2021 | GREASE DUCT LIGHT TEST ON ROOF INSPECTION : QUESTIONING GREASE DUCT SLOPE TO THE UTILITY EXHAUST FANS. KEF-6 - GREASE DUCT. NO HOLES / | LIDO | LIDO | | HD | P | 6903232 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/17/2021 | GREASE DUCT INSPECTION ON ROOF : QUESTIONING GALVANIZE FLEX (canvas) FITTING AND CONNECTION FROM GREASE DUCT TO UTILITY EXHAUST FAN / KEF-1 AND KEF-4 TERMINATION IS LESS THAN 10 FEET FROM WALL. SEE 2015 IMC CODE SECTION 506.3.13.3 / KEF-1 - GREASE DUCT LIGHT TEST - NO HOLES / | LIDO | LIDO | | HD | P | 6902039 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/16/2021 | NEED CONTRACTOR INSTALLING THE WALK IN COOLER / FREEZER ATTACHED TO THE PERMIT AND REQUIRED INSPECTIONS MUST BE REQUESTED. THIS WAS NOTED ON INSPECTION DATED 12/16/2020 / GREASE DUCT FIRE WRAP INSPECTION / KEF-4/5 HOOD 1,2 AND 3 : 1ST AND 2ND LAYER WRAP COMPLETE . INSTALL OK (Still need access doors) / | LIDO | LIDO | | HD | P | 6900643 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/10/2021 | GREASE DUCT FIRE BARRIER WRAP INSPECTION : STILL NEED ALL ACCESS DOORS / KEF-6 / OVEN HOOD - 1ST AND 2ND LAYER FROM DROP TO HOOD LOCATION OK ( still need grease duct connection to hood and insulation when installed ) / KEF-2 (HOOD 4 / 5) - 1ST AND 2ND LAYER FROM DROP TO HOODS OK / KEF-5/4 ( HOOD 2/3 ) - 1ST AND 2ND LAYER FROM BEAM TO WALL OK /
| LIDO | LIDO | | HD | P | 6895114 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/09/2021 | GREASE DUCT WRAP INSPECTION : KEF-2 (HOOD 4/5 ) - 1ST AND 2ND LAYER FROM HOOD TO FRONT OF WALK IN COOLER /FREEZER OK / KEF-6 (OVEN HOOD) - 1ST AND 2ND LAYER FROM HOOD LOCATION TO FRONT OF WALK IN COOLER /FREEZER OK. STILL NEED CONNECTION TO HOOD WHEN HOOD IS INSTALLED / KEF-5 (HOOD 1 ) - 1ST AND 2ND LAYER FROM WALL TO FRONT OF WALK IN COOLER /FREEZER OK / KEF-4 (HOOD 2 ) - 1ST AND 2ND LAYER FROM WALL TO FRONT OF WALK IN COOLER /FREEZER OK / | LIDO | LIDO | | HD | P | 6894024 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/08/2021 | HOOD -6 AND 7 / KEF-1 INSULATION INSPECTION FROM HOODS TO KEF-1 RISER ( INCLUDING RISER) : NEED TO COMPLETE ALL ACCESS DOOR ( fyi- no metal can be showing around access door insulation ) / AT THE FRONT OF THE COOLER / FREEZER THE OVER LAP IS NOT BANDED / MULTIPLE AREAS ABOVE THE WALK IN COOLER FREEZER, 2ND LAYER OVERLAPS ARE NOT BANDED / CONTRACTOR WILL NEED TO WALK ALL INSULATION PRIOR TO INSPECTION AND MAKE SURE ITS READY FOR INSPECTION / RE- INSPECT ALL / | LIDO | LIDO | | HD | P | 6891958 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/04/2021 | QUESTIONING IF A BALL VALVE IS GOING TO BE INSTALLED FOR THE GREASE DUCT RESERVOIR THREADED DRAIN STUB OUTLET OR WILL IT BE CAPPED. IS THE DRAIN STUB STAYING EXPOSED OR COVERED WITH FIRE BARRIER WRAP. DRAIN OUTLET WILL NEED TO BE ACCESSIBLE. ENGINEER TO ADDRESS. | LIDO | LIDO | | HD | P | 6889328 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/04/2021 | 3M EJ letter pertaining to grease duct access doors received. See images. | LIDO | LIDO | | HD | P | 6889327 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/04/2021 | ON SITE MEETING WITH INSULATION CONTRACTOR ( John / CDSC ) / WENT OVER GREASE DUCT INSULATION REQUIREMENTS / DISCUSSED ACCESS DOOR INSULATION METHOD USED WILL MEET THE MANUFACTURERS INTENT FOR INSTALL PER THE EJ LETTER PROVIDED BY 3M/
| LIDO | LIDO | | HD | P | 6889026 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/03/2021 | GREASE DUCT FIRE BARRIER WRAP MUST BE INSTALLED PER TH MANUFACTURER REQUIREMENTS. SEE PAGE # 4 AND 5 FOR HORIZONTAL RUNS, PAGE #12 FOR ELBOWS AND T-FITTING, PAGE # 6 FOR ACCESS DOORS. WENT OVER PAGE #12 FROM THE INSTALL INSTRUCTIONS WITH MECHANICAL CONTRACTOR. | LIDO | LIDO | | HD | P | 6887444 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/01/2021 | HOOD -7 NOT READY / 4 FIRE SMOKE DAMPERS COMPLETE / | LIDO | LIDO | | HD | P | 6883827 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/25/2021 | DISH WASHER AREA : PARTIAL SUPPLY DUCT ROUGH OK. OK TO INSULATE . | LIDO | LIDO | | HD | P | 6881379 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/25/2021 | GREASE DUCT FIRE BARRIER WRAP INSPECTION : Added notes (LM) 8:34 -Fire barrier grease duct wrap for Broadway / stack elbows must be per page #12 in the install instructions / HOOD-4 AND HOOD-5 (KEF-2) : WHAT IS GOING ON WITH THE PATCH PIECE OF WRAP ON THE 2ND LAYER OF WRAP BY THE WALK IN COOLER / FREEZERS ? AT THE T-FITTING TO HOOD 5, THE 2ND LAYER OF WRAP IS LACKING THE 3" MINIMUM OVER LAP AND HAS A LARGE GAP. 1ST LAYER OF WRAP IS VISIBLE DUE TO THIS GAP. WRAP ABOVE HOOD-5 HAS MULTIPLE AREAS WHERE THE 3" MINIMUM OVERLAP IS NOT ACHIEVED, ALSO GAPS IN 2ND LAYER OF WRAP MAKING THE 1ST OF WRAP VISIBLE. MULTIPLE LOCATIONS ABOVE HOOD 5 THE BANDS ARE SPACED MORE THAN 10.5" APART . STOPPED INSPECTION THERE MAY BE MORE ITEMS . RE INSPECT ALL. CONTRACTOR WILL NEED TO REVIEW INSTALL INSTRUCTIONS AND MAKE SURE ALL FIRE BARRIER WRAP INSTALLED IS PER THE MANUFACTURER REQUIREMENTS PRIOR TO NEXT INSPECTION . | LIDO | LIDO | | HD | P | 6881378 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/25/2021 | GREASE DUCT ACCESS DOOR MOCK UP INSPECTION : GREASE DUCT FIRE BARRIER WRAP INSULATION APPLIED TO THE ACCESS DOOR IS NOT PER 3M 615+ MANUFACTURER REQUIREMENTS. PER CONVERSATION WITH JOHN BYES WITH (CDS), CONTRACTOR WILL REACH OUT TO 3M AND SEE IF THEY WILL APPROVED THE WRAP INSULATION APPLIED FOR ACCESS DOORS. IF APPROVED BY 3M, DOCUMENTATION AND DETAIL WILL BE REQUIRED FOR HOW THE INSULATION IS TO BE INSTALLED/ | LIDO | LIDO | | HD | P | 6880753 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/24/2021 | KITCHEN TYPE 1 HOOD INSPECTION : HOOD -7 NOT READY / HOOD - 4,5 AND 6 OK / | LIDO | LIDO | | HD | P | 6879841 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/24/2021 | CaptiveAir letter/detail for hood 6 hanger support approved changes received. see images/ | LIDO | LIDO | | HD | P | 6883139 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/23/2021 | HAD CONSULT WITH CRAIG FIRE BARRIER WRAP INSULATOR AND JEREMY / MATT WITH US ENGINEERING ABOUT GREASE DUCT ACCESS DOOR INSULATION . WILL REVIEW OUR DISCUSSION WITH SENIOR INSPECTOR / | LIDO | LIDO | | HD | P | 6878873 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/22/2021 | GREASE DUCT LIGHT TEST : KEF-2 GREASE DUCT CONNECTION TO HOOD 4 AND HOOD 5. NO HOLES.(all grease duct welded connection complete for this system inside building ). OK TO APPLY 1ST AND SECOND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER WRAP AT 2ND LAYER WRAP INSPECTION / | LIDO | LIDO | | HD | P | 6877377 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/18/2021 | HAD FIRE BARRIER WRAP CONSULT ABOUT ACCESS DOOR INSULATION WITH INSULATOR / GREASE DUCT LIGHT TEST : KEF-1 DUCT CONNECTION TO HOOD -6 AND HOOD -7. NO HOLES (all grease duct welded connection complete for this system inside building ). OK TO APPLY 1ST AND SECOND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER WRAP AT 2ND LAYER WRAP INSPECTION / | LIDO | LIDO | | HD | P | 6874408 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/17/2021 | KEF-6 AND KEF-2 RISER : 1ST AND 2ND LAYER OF FIRE BARRIER WRAP OK / KEF-6 GREASE DUCT LIGHT TEST: INSTALL FROM OVEN TO RISER NO HOLES (still need connection to oven.) OK TO APPLY 1ST AND 2ND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER WRAP AT 2ND LAYER WRAP INSPECTION / | LIDO | LIDO | | HD | P | 6872799 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/16/2021 | KEF-6 : WENT OVER 1ST LAYER AND 2ND LAYER FIRE WRAP INSTALL INSTRUCTIONS FOR RISER WITH CONTRACTOR / KEF-2 : GREASE DUCT CONNECTIONS TO RISER OK ,LIGHT TEST NO HOLES. OK TO APPLY 1ST LAYER AND 2ND LAYER FIRE WRAP . CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER WRAP AT 2ND LAYER WRAP INSPECTION / | LIDO | LIDO | | HD | P | 6871269 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/10/2021 | KEF-6 GREASE DUCT LIGHT TEST : 4 SECTIONS, 4 ELBOWS OK / 1 RISER OK. OK TO APPLY 1ST AND 2ND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER WRAP AT 2ND LAYER WRAP INSPECTION ( ok to wrap riser only ) / | LIDO | LIDO | | HD | P | 6866928 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/09/2021 | GREASE DUCT LIGHT TEST : KEF-2 RISER - NO HOLES. OK TO APPLY 1ST AND 2ND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER WRAP AT 2ND LAYER WRAP INSPECTION / KEF-6 SECTION # 1 AND #2 ROUND GREASE DUCT- SECTION #1 HAS ONE HOLE. SECTION #2 HAS ONE HOLE /
| LIDO | LIDO | | HD | P | 6865016 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/08/2021 | KEF-5 : UPON RESEARCH OF GREASE DUCT RESERVOIR. GREASE RESERVOIR OK / GREASE DUCT LIGHT TEST KEF-2 AND KEF-4 : FROM COLUMN LINE (Q) TO RISERS OK . OK TO APPLY 1ST AND 2ND LAYER FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER AT 2ND LAYER WRAP INSPECTION. STILL NEED GREASE DUCT CONNECTIONS TO HOOD 4 AND 5 / | LIDO | LIDO | | HD | P | 6863424 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/04/2021 | STAMPED ENGINEER LETTER RECEIVED PERTAINING TO KEF-1 HORIZONTAL 44" X 18" KITCHEN GREASE DUCT REDUCING TO 44"X14" TO PASS BELOW A BEAM AND BACK TO 44"X 18" . SEE IMAGES. | LIDO | LIDO | | HD | P | 6860581 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/04/2021 | KEF-5 : NEED TO RESEARCH GREASE DUCT RESERVOIR INSTALLED IN THE 20 X 12 GREASE DUCT. WILL UPDATE NOTES AFTER . KEF-5 HORIZONTAL GREASE DUCT LIGHT TEST - NO HOLES. . OK TO APPLY 1ST AND 2ND LAYER FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER AT 2ND LAYER WRAP INSPECTION. STILL NEED CONNECTION TO HOOD #1 AND INSTALL ON ROOF / | LIDO | LIDO | | HD | P | 6859989 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/04/2021 | Captive Air letter approving the relocation of the factory hood #6 riser received. See images. | LIDO | LIDO | | HD | P | 6859028 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/03/2021 | TWO 44X20 DAMPER FRAMES OK . KEF-1 GREASE DUCT LIGHT TEST : FROM COLUMN LINE (N) TO RISER OK. OK TO APPLY 1ST AND 2ND LAYER FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER AT 2ND LAYER WRAP INSPECTION | LIDO | LIDO | | HD | P | 6858531 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/02/2021 | PLAN PAGE MH 102 ( BDA 89) : TWO DAMPER ABOVE DOUBLE DOOR COMPLETE / HOOD INSPECTION : HOOD 6 - SUPPORT FOR HOOD WAS MODIFIED. THIS REQUIRES APPROVAL FROM CAPTIVE AIR. A DETAIL SHOWING HOW THE HOOD WAS SUPPORTED AND LETTER FROM CAPTIVE AIR REQUIRED / HOOD 4 AND 5 - NEED 18" OF METAL ABOVE HOOD AND AROUND ALL PIPE PENETRATIONS THROUGH HOOD WALL AND SEAL ALL PIPE PENETRATIONS WITH CAULK / HOOD 7 - NEED 18" OF METAL ABOVE HOOD AND AROUND ALL PIPE PENETRATIONS THROUGH HOOD WALL WALL AND SEAL ALL PIPE PENETRATIONS WITH CAULK /
| LIDO | LIDO | | HD | P | 6856863 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/01/2021 | GREASE DUCT LIGHT INSPECTION : KEF-2 HORIZONTAL GREASE DUCT FROM EDGE OF HOOD - 4 TO FRONT OF COOLER / FREEZER OK . OK TO APPLY 1ST AND 2ND LAYER OF FIRE BARRIER WRAP CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER AT 2ND LAYER WRAP INSPECTION / KEF-4 AND KEF-5 RISER : 1ST AND 2ND LAYER OF FIRE BARRIER WRAP OK / | LIDO | LIDO | | HD | P | 6855576 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/28/2021 | PLAN PAGE MH 102 ( BDA 89) : GREASE DUCT LIGHT TEST - KEF-4 AND KEF-5 RISER OK. OK TO APPLY 1ST AND 2ND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER OF WRAP AT 2ND LAYER WRAP INSPECTION / KEF-5 HORIZONTAL GREASE DUCT NO HOLES ( install from wall at hood 7 to other side of 82x20 main supply duct ) . OK TO APPLY 1ST AND 2ND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER OF WRAP AT 2ND LAYER WRAP INSPECTION / KEF-1 RISER -1ST AND 2ND LAYER OF FIRE BARRIER WRAP / | LIDO | LIDO | | HD | P | 6851900 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/26/2021 | KEF-4 GREASE DUCT LIGHT TEST : GREASE DUCT FROM WALL RIGHT OF WALK IN COOLER /FREEZER AND 20 FEET IN FROM FRONT OF COOLER / FREEZER OK . OK TO INSTALL 1S AND 2ND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER WRAP AT 2ND LAYER WRAP INSPECTION. | LIDO | LIDO | | HD | P | 6849445 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/25/2021 | STAMPED ENGINEER DETAIL AND LETTER RECEIVED FOR FRAMING ABOVE A DOUBLE DOOR FOR POTTORFF FIRE SMOKE DAMPER. SEE IMAGES. TWO FIRE SMOKE DAMPER FRAMES ABOVE DOUBLE DOOR IN CORRIDOR FRAMED PER ENGINEER DETAIL. 1 - 44" X20" FIRE SMOKE DAMPER FRAME IN SHAFT WALL OK / GREASE DUCT FIRE BARRIER WRAP INSPECTION : 1ST AND 2ND LAYER OF WRAP 4 FEET IN FROM COLUMN LINE (N) AND 4 FEET IN FROM GAS LINE FOR COOK LINE OK / | LIDO | LIDO | | HD | P | 6848049 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/19/2021 | POTTORFF FIRE SMOKE DAMPER FRAMING ABOVE A DOUBLE DOOR REQUIRES A STAMPED ENGINEER DETAIL FOR FRAMING AND A STAMPED ENGINEER LETTER PERTAINING TO THE DAMPER FRAMING MEETING THE INTENT AND REQUIREMENTS OF THE DAMPER PRODUCT / KEF-1 GREASE DUCT RISER LIGHT TEST - NO HOLES. OK TO APPLY 1ST AND 2ND LAYER OF FIRE BARRIER WRAP. CONTRACTOR TO PROVIDE PICTURES OF 1ST LAYER OF WRAP AT 2ND LAYER WRAP INSPECTION / | LIDO | LIDO | | HD | P | 6840961 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/14/2021 | DUCT ABOVE HOOD 5 AND 6 - COMBUSTIBLE INSULATION COVER REMOVED FROM INSULATION AND METAL PANNING INSTALLED TO KEEP INSULATION IN PLACE / GREASE DUCT 1ST AND 2ND LAYER OF FIRE BARRIER WRAP UNDER HYDRONIC WATER PIPING ONLY OK. Access doors and shoe tap location were stainless steel bands are spaced more than 10.5" apart, pins are required / | LIDO | LIDO | | HD | P | 6836720 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 01/06/2021 | PLAN SHOW 1-1/4" GAS PIPE INSTALLED OFF 4" GAS LINE TO ROLL-IN OVEN . 1" WAS INSTALLED. INSTALL PER PLAN / 60LB TEST OK. GAS INSTALL IN COOK LINE WALL OK/ GAS STUB OUTS FOR COOK LINE OK / | LIDO | LIDO | | HI | P | 6827036 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/06/2021 | TYPE 1 HOOD WALL INSPECTION : ALL HOOD WALLS OK / NEED REVISED AND APPROVED PLANS FOR 42"X 16" SMOKE DAMPER (see column lines 30 / U ) CHANGED TO FIRE SMOKE DAMPER. COMMUNICATED BY CONTRACTOR THAT THIS IS NOW A SHAFT WALL. BREAKAWAY CONNECTION FOR FIRE SMOKE DAMPER INSIDE OF SHAFT WALL ONLY OK / | LIDO | LIDO | | HD | P | 6827029 |
U.S. ENGINEERING CONSTRUCTION, LLC | HSP | P | 12/30/2020 | FYI- PER PAGE # 4, GREASE DUCTS GREATER THAN 24" WIDE, REQUIRE PINS ON THE BOTTOM SIDE OF HORIZONTAL DUCTS. SEE PAGE # 9 FOR PINNING GUIDE. | LIDO | LIDO | | HSP | P | 6822822 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/30/2020 | HOOD -6,7 AND KEF-1 GREASE DUCT LIGHT TEST ( 4' north of column line N to 18x 10 radius elbow) : HANGER SPACING ON MULTIPLE LOCATION ARE NOT APART ENOUGH TO ALLOW FOR TWO LAYER OF FIRE BARRIER WRAP / HOW IS THE TWO LAYERS OF WRAP GOING TO BE APPLIED ON 10 FOOT SECTION OF GREASE DUCT UNDER TWO LARGE WATER LINES ? GREASE DUCT FIRE BARRIER WRAP MUST BE APPLIED PER THE MANUFACTURER REQUIREMENTS / LIGHT TEST OK. NO HOLES/ | LIDO | LIDO | | HD | P | 6822571 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/16/2020 | PLAN PAGE MH102 ( BDA 19) : NEED CONTRACTOR INSTALLING WALK IN COOLER / FREEZER ATTACHED TO PERMIT / TYPE -1 HOOD WALL INSPECTION : WALL FOR HOOD 1,4,5,6 AND 7 - REMOVE ALL COMBUSTIBLES FROM WALLS / HOOD WALL FOR HOOD 2 AND 3 OK / | LIDO | LIDO | | HD | P | 6809999 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/09/2020 | GREASE DUCT LIGHT TEST : SECTION # 22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38 OK / | LIDO | LIDO | | HD | P | 6802013 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/17/2020 | GREASE DUCT LIGHT INSPECTION : SECTION # 15, 16, 17, 18, 19, 20, 21 OK / | LIDO | LIDO | | HD | P | 6779937 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/11/2020 | GREASE DUCT LIGHT TEST - SECTION # 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14 OK. SIGNED AND DATED / | LIDO | LIDO | | HD | P | 6773352 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/05/2020 | GREASE DUCT LIGHT TEST : SECTION # 1,2 AND 3 OK. SECTIONS SIGNED AND DATED / | LIDO | LIDO | | HD | P | 6766596 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 04/29/2021 | Ok. | DANR | DANR | | P= | C | 6952057 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/26/2021 | STILL NEED TO ADDRESS , LOOP VENT AT SINK TOO LOW AND NEED ALL HOT WELL SIDE OF KITCHEN | DANR | DANR | | P= | P | 6946830 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/15/2021 | D/W AREA COMPLETE MINUS RESEARCH ON BFP AT D/W -- PREP/ COOK AREA -- MISSING # 41 UTILITY SINK -- LOOP VENT AT SINK TOO LOW -- NEED ALL HOT WELL SIDE OF KITCHEN -- SHAFT WALL OK | LEE | LEE | | P= | P | 6934988 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/07/2021 | ((( KITCHEN D/W AREA ONLY ))) -- NEED TO SEPARATE T&P DRAINS ON D/W UNIT -- NEED TO VERIFY BACK FLOW DEVICE ON D/W -- NEED BACK FLOW DEVICE AT 3- COMP SINK BOOSTER HEATER -- LEAK ON 3- COMP SINK -- NEED TO ADD H/S, 3-COMP SINK, D/W AND RP BACK FLOW TO SCOPE OF WORK | LEE | LEE | | P= | P | 6925461 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 03/11/2021 | | LEE | LEE | | PTO | C | 6896281 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 02/25/2021 | | LEE | LEE | | PB | C | 6881247 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/20/2021 | CART WASHER -- MISC H20 AT EXISTING EYE WASH OK -- HAND SINK IN DISH/WASHING ROOM IN QUESTION (NOT PIPED YET) MAY BE DELETING WITH REVISION | LEE | LEE | | PTO | P | 6841780 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 01/07/2021 | INSPECTION FOR NEW 4" FLOOR SINK SOUTH SIDE OF COOK WALL, AWAITING SPLICE FOR SIGN OFF, TEST OK | LEE | LEE | | PB | P | 6828417 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 01/06/2021 | FOR TWO FLOOR SINKS NEAR COOK WALL (BOTH ENDS OF WALL) | LEE | LEE | | PB | P | 6826874 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/29/2020 | SHAFT WALL DWV (CHECK VENT TIE-INS NEXT INSPECTION) -- COOK WALL MISC. WATER STUB-OUTS COMPLETE, ALSO WATER PIPE FROM COOK WALL UNDER SLAB TO ISLAND SINK OK | LEE | LEE | | PTO | P | 6821256 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 12/10/2020 | 3- FLOOR SINKS AND 2" STACK FOR ISLAND SINK SHAFT WALL OK | LEE | LEE | | PB | P | 6803503 |
ENCORE ELECTRIC, INC. | XES | T | 05/03/2021 | PAID (REC#1771105): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added Kitchen Load Centers. | BERTHA | BERTHA | | XES | T | 6954471 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 04/20/2021 | PAID (REC#1766161): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: EJ for column protection | MICHAELA | MICHAELA | | XBS | T | 6939482 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 04/16/2021 | PAID (REC#1765385): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Hilti EJ for top of wall | MICHAELA | MICHAELA | | XBS | T | 6936152 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 04/15/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Minor CFM and layout revisions | JUSTINC | JUSTINC | | XMS | P | 6934816 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 04/14/2021 | PAID (REC#1765013): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: EJ for penetrations. | MICHAELA | MICHAELA | | XBS | T | 6933875 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 03/19/2021 | PAID (REC#1762610): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised 10" supply at G108 | JUSTINC | JUSTINC | | XMS | T | 6904250 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 02/23/2021 | PAID (REC#1752620): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised for grease duct drain | JUSTINC | JUSTINC | | XMS | T | 6878013 |
ENCORE ELECTRIC, INC. | XES | P | 01/22/2021 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised for background changes. Utility Closet removed. | BERTHA | BERTHA | | XES | P | 6845256 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 01/22/2021 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised dampers, layout, and gas | JUSTINC | JUSTINC | | XMS | P | 6845168 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 01/22/2021 | PAID (REC#1745157) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise assemblies - floorplan | MICHAELA | MICHAELA | | XBS | T | 6845009 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 01/06/2021 | PAID (REC#1740966) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 37 revisions: 1 revised sheet provided - PL002B adjusted garden level- kitchen area B waste and vent plan | SHANEN | SHANEN | | XPS | T | 6826863 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 12/23/2020 | PAID (REC#1738854): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Splice is to show removal of balancing dampers from grease ducts | JUSTINC | JUSTINC | | XMS | T | 6817886 |