VICEROY DEVELOPMENT, INC. | B= | C | 10/13/2021 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 7141047 |
VICEROY DEVELOPMENT, INC. | B= | P | 09/22/2021 | . Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | BOBF | BOBF | | B= | P | 7116213 |
VICEROY DEVELOPMENT, INC. | B= | R | 09/17/2021 | need solid core wood door or 1 3/8" thick or 20 rated door from garage to house and under stairs from garage / missing guardrail at sliding door 3rd floor master bedroom / interior side drywall at separation wall not inspected for attachment spacing. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | R | 7111999 |
VICEROY DEVELOPMENT, INC. | BIN | C | 09/15/2021 | air leakage and insulation certificate. | NATHAN | NATHAN | | BIN | C | 7107146 |
VICEROY DEVELOPMENT, INC. | BLA | C | 05/14/2021 | | NATHAN | NATHAN | | BLA | C | 6969475 |
VICEROY DEVELOPMENT, INC. | BFR | C | 04/29/2021 | Items corrected, letter on file for weld and header at stairs. | NATHAN | NATHAN | | BFR | C | 6952372 |
VICEROY DEVELOPMENT, INC. | BSP | P | 04/27/2021 | rear upper post to patio cover okay. | NATHAN | NATHAN | | BSP | P | 6948342 |
VICEROY DEVELOPMENT, INC. | BSP | P | 04/26/2021 | rear upper patio roof posts not installed. 1st and 2nd floor deck and posts only okay | NATHAN | NATHAN | | BSP | P | 6946679 |
VICEROY DEVELOPMENT, INC. | BSP | P | 04/23/2021 | RC at garage okay, rigid frame connection to foundation in question still, upper hold down from rigid frame okay | NATHAN | NATHAN | | BSP | P | 6946032 |
VICEROY DEVELOPMENT, INC. | BFR | P | 04/20/2021 | Still need letter for weld of hold down and rigid frame of garage, headroom at stairs still in question. | NATHAN | NATHAN | | BFR | P | 6940446 |
VICEROY DEVELOPMENT, INC. | BFR | R | 04/19/2021 | Items covered with insulation at exterior walls in the way of reinspection. the frame was rejected not partialed to continue | NATHAN | NATHAN | | BFR | R | 6938423 |
VICEROY DEVELOPMENT, INC. | BFR | R | 04/15/2021 | Anchor bolts and under stairs framing only corrections made | ADAML | ADAML | | BFR | R | 6934851 |
VICEROY DEVELOPMENT, INC. | BFR | R | 04/13/2021 | Provide weld observation for garage rigid frame to embed plate and need correct bolting at upper section, need anchor bolts within 12" of all plate breaks, frame under stairs at garage for R30 minimum, need double stud at stair rim infill framing, full height studs or header at kitchen vent cut out, head room at upper stairs to third floor, dry in roof penetrations, missing HDU8 hold down at rear slider 3rd floor. | NATHAN | NATHAN | | BFR | R | 6932258 |
VICEROY DEVELOPMENT, INC. | BIN | P | 04/09/2021 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6928743 |
VICEROY DEVELOPMENT, INC. | BSP | P | 03/02/2021 | 3rd floor facing layers of drywall per WP 8105 | NATHAN | NATHAN | | BSP | P | 6885816 |
VICEROY DEVELOPMENT, INC. | BSP | P | 02/22/2021 | 2nd floor facing layers of drywall at separation wall and rim per WP 8105 | NATHAN | NATHAN | | BSP | P | 6876962 |
VICEROY DEVELOPMENT, INC. | BSP | P | 02/09/2021 | Area separation wall facing layers at 1st floor per WP 8105 okay. Discussed assembly and inspections with contractor. | NATHAN | NATHAN | | BSP | P | 6864518 |
VICEROY DEVELOPMENT, INC. | BFD | C | 12/22/2020 | Foundation and over excavation drain not required. | NATHAN | NATHAN | | BFD | C | 6815812 |
VICEROY DEVELOPMENT, INC. | BFN | R | 12/22/2020 | Ufer noted. | NATHAN | NATHAN | | BFN | R | 6815811 |
VICEROY DEVELOPMENT, INC. | BFT | C | 12/22/2020 | All foundation paperwork on file | NATHAN | NATHAN | | BFT | C | 6815809 |
VICEROY DEVELOPMENT, INC. | BFT | P | 12/17/2020 | As stated on phone calls and inspection ufer must be noted in the observation letter not just a picture of the ufer. | NATHAN | NATHAN | | BFT | P | 6810904 |
VICEROY DEVELOPMENT, INC. | BFT | P | 12/15/2020 | Please address the soils report section 4.2 for under drain or interceptor drain / UFER NOT OBSERVED, requirements. open hole on file -- 2500 PSF -- usable --5% / footing and foundation observation on file - foundation design on file (bearing capacity verified) / | NATHAN | NATHAN | | BFT | P | 6807527 |
VICEROY DEVELOPMENT, INC. | BFI | C | 12/10/2020 | R10 installed | NATHAN | NATHAN | | BFI | C | 6804091 |
VICEROY DEVELOPMENT, INC. | BFD | P | 12/10/2020 | Drain not installed, need openex, soils report mentions a drain at usable space only, damp proofing applied | NATHAN | NATHAN | | BFD | P | 6804081 |
VICEROY DEVELOPMENT, INC. | BFT | P | 12/10/2020 | Foundation observation does not mention ufer observed, need stamped open excavation, soils report mentions under drain or intercept drain ? Soils, footer and foundation observation on file . | NATHAN | NATHAN | | BFT | P | 6803275 |
VICEROY DEVELOPMENT, INC. | BFN | P | 12/10/2020 | Please upload only foundation plans if changed not entire plan set , foundation plan is in approved building plans already. foundation plan uploaded, Need stamped open excavation, piers not inspected. | NATHAN | NATHAN | | BFN | P | 6803271 |
VICEROY DEVELOPMENT, INC. | BFT | P | 11/13/2020 | AUTHORIZED INSPECTION BY ENGINEER | MATTHEWM | MATTHEWM | MATTHEWM | BFT | P | 6776737 |
VICEROY DEVELOPMENT, INC. | BFN | P | 11/13/2020 | AUTHORIZED INSPECTION BY ENGINEER | MATTHEWM | MATTHEWM | MATTHEWM | BFN | P | 6776736 |
POSITIVE ELECTRIC, LLC | E= | C | 09/16/2021 | corrections made / | MIGUEL | MIGUEL | | E= | C | 7110334 |
POSITIVE ELECTRIC, LLC | E= | T | 09/15/2021 | PAID (REC#1807194): no arc shield installed on the outside lights / still no deck installed no way to test or can not verify the outlet is inside the deck / | BRIAN | BRIAN | | E= | T | 7108352 |
POSITIVE ELECTRIC, LLC | E= | R | 08/24/2021 | need arc shield on outside lighting on brick / need to grout around the outside gfci's / need deck installed to verify the gfci on the front of the home / 25 amp ac--ok / | BRIAN | BRIAN | | E= | R | 7083419 |
POSITIVE ELECTRIC, LLC | E= | R | 08/20/2021 | need to verify S GFCI on upper level exterior / 25A A/C installed / | MIGUEL | MIGUEL | | E= | R | 7079483 |
POSITIVE ELECTRIC, LLC | E= | R | 08/19/2021 | door locked / | MIGUEL | MIGUEL | | E= | R | 7078812 |
POSITIVE ELECTRIC, LLC | E= | R | 08/18/2021 | not ready / | BRIAN | BRIAN | | E= | R | 7076430 |
POSITIVE ELECTRIC, LLC | ES | C | 04/09/2021 | Residential Underground: 150A 3w new res ok to set meter / | MIGUEL | MIGUEL | | ES | C | 6928127 |
POSITIVE ELECTRIC, LLC | ER | C | 04/09/2021 | IR ufer / 8/3 AL x3 / no MCCs / | MIGUEL | MIGUEL | | ER | C | 6928126 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 08/25/2021 | CORRECTION MADE / SEE IMAGES | MICHAELM | MICHAELM | | H= | C | 7084093 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 08/18/2021 | TERMINATE FURNACE VENT AS DISCUSSED WITH CONTRACTOR ON SITE / TANKLESS WATER HEATER IS NOT TO PLUG INTO A GFCI OUTLET AS PER PAGE 60 / OK TO ATTACH PICTURE OF CORRECTION TO AN INSPECTION REQUEST / NOTE: DIRECT VENT FURNACE / OUTSIDE AIR WITH DAMPER TO FURNACE RETURN / DIRECT VENT TANKLESS WATER HEATER / A/C COMPLETE / SLAB ON GRADE | MICHAELM | MICHAELM | | H= | P | 7076828 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 08/18/2021 | Performance Test and Equipment Change Letter Received / See Images | MICHAELM | MICHAELM | | H= | P | 7076045 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 04/05/2021 | RELEASE METER | MICHAELM | MICHAELM | | HC | C | 6921082 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 04/05/2021 | RELEASE METER | MICHAELM | MICHAELM | | HC | C | 6921074 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 04/05/2021 | CONTRACTOR HAS ELECTED FOR PERFORMANCE TEST BY FINAL / NEED EQUIPMENT CHANGE LETTER FOR FURNACE AND COIL BY FINAL / NOTE: DIRECT VENT FURNACE / OUTSIDE AIR WITH DAMPER TO FURNACE RETURN / DIRECT VENT TANKLESS WATER HEATER / A/C ROUGH, COIL AND LINESET / SLAB ON GRADE | MICHAELM | MICHAELM | | HRR | C | 6921072 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 04/02/2021 | STILL QUESTIONING THE 9 INCH RETURNS ON PLANS AND 8 INCH INSTALLED / STILL QUESTIONING THE 14 X 14 RETURN DROPS AND PLANS SHOW 12 X 12 | MICHAELM | MICHAELM | | HRR | P | 6920446 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRP | C | 04/02/2021 | TEST OK | MICHAELM | MICHAELM | | HRP | C | 6919758 |
SPRINGS GAS, INC. | HI | C | 03/31/2021 | 10 LB TEST OK / 1 1/4 INCH MAIN / 1 FURNACE / 1 TANKLESS WATER HEATER / 1 RANGE | MICHAELM | MICHAELM | | HI | C | 6917579 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 03/30/2021 | WHOLE HOUSE VENTILATION BEING ACHIEVED HOW? / 14 X 14 RETURNS INSTALLED, PLANS SHOW 12 X 12 / PLANS SHOW 9 INCH RETURNS AT MECHANICAL ROOM? Contractor must fill out the Equipment Change Form (Residential) for furnace and coil and attach form to an inspection request by final. / WHAT ARE THE CFM'S OF THE FANS? / Verify whole house ventilation switch location at final / NOTE: DIRECT VENT FURNACE / OUTSIDE AIR WITH DAMPER TO FURNACE RETURN / DIRECT VENT TANKLESS WATER HEATER / A/C ROUGH, COIL AND LINESET / SLAB ON GRADE | MICHAELM | MICHAELM | | HRR | P | 6915823 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRP | P | 03/30/2021 | OBSERVED 275 PSI ON A 500 PSI GAUGE / WHAT PSI DID YOU START AT? | MICHAELM | MICHAELM | | HRP | P | 6915635 |
TEAM PLUMBING, INC. | P= | C | 08/17/2021 | Corrections completed | FRANKM | FRANKM | | P= | C | 7074820 |
TEAM PLUMBING, INC. | P= | P | 08/16/2021 | Master shower valve water crossed & won't shut off (plumber not on site & tried calling the 719-226-0711 number multiple times to let them know) / access door & trap guard required @ water heater floor drain | FRANKM | FRANKM | | P= | P | 7073307 |
TEAM PLUMBING, INC. | P= | P | 07/28/2021 | Crossed water lines @ L3 guest shower / adjust thermostatic T&S valve @ all 3 showers / hand held shower spray requires a vacuum breaker / wtr. htr. floor drain requires access Note : AAV @ water entry flr. drn. | FRANKM | FRANKM | | P= | P | 7052603 |
TEAM PLUMBING, INC. | P= | R | 07/26/2021 | Not ready (no hot water) | FRANKM | FRANKM | | P= | R | 7049030 |
TEAM PLUMBING, INC. | PTO | C | 03/31/2021 | Note: vtr-3, no irrigation, tempering at right master lav | MALYNDA | MALYNDA | | PTO | C | 6916716 |
TEAM PLUMBING, INC. | PTO | R | 03/30/2021 | Locked, no access at 4:20pm. | MALYNDA | MALYNDA | | PTO | R | 6916269 |
TEAM PLUMBING, INC. | PB | C | 01/20/2021 | | SAMH | SAMH | | PB | C | 6842485 |
TEAM PLUMBING, INC. | PB | P | 01/15/2021 | H20 AND DRAIN OK THRU GARAGE | LEE | LEE | | PB | P | 6837688 |
VICEROY DEVELOPMENT, INC. | XBS | T | 03/11/2021 | PAID (REC#1756317): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Structural revisions - columns and beams | SHELLEY | SHELLEY | | XBS | T | 6896178 |
VICEROY DEVELOPMENT, INC. | XBS | T | 01/26/2021 | PAID (REC#1746716): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Architectural and structural details/revisions. | SHELLEY | SHELLEY | | XBS | T | 6848250 |
VICEROY DEVELOPMENT, INC. | XBS | T | 11/23/2020 | PAID (REC#1735506): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised accessibility matrix, garage and exterior cladding. | SHELLEY | SHELLEY | | XBS | T | 6785887 |