CMG CORP | B= | C | 09/20/2021 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 7112657 |
CMG CORP | B= | P | 09/09/2021 | address verified electronically. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: kerry.smith@bffire.org or 495-4300). | LONNYS | LONNYS | | B= | P | 7100718 |
CMG CORP | B= | P | 09/07/2021 | still need to post address / rest of building final OK pending other required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: kerry.smith@bffire.org or 495-4300). | LONNYS | LONNYS | | B= | P | 7098497 |
CMG CORP | B= | P | 08/16/2021 | FINAL INSPECTION / Handrails at top side landing do not meet requirements of 1014.6 - Reviewed with contractor on site / Missing reduced vertical clearance rails at open side of stairs per section 307.4 of 2009 ANSI - Reviewed maximum height of rails of 27" above the floor with contractor on site / Missing posted address on building / Remaining final inspection and accessible elements observed / pending other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: kerry.smith@bffire.org or 495-4300), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), SAINT JOSEPH PLUMBING LLC Mechanical Final Inspection is not Completed yet, SAINT JOSEPH PLUMBING LLC Plumbing Final Inspection is not Completed yet. | JUSTINL | JUSTINL | | B= | P | 7073497 |
CMG CORP | BSP | R | 06/23/2021 | no inspection required for gas fireplace clearances / this will be a HV inspection | LONNYS | LONNYS | | BSP | R | 7012163 |
CMG CORP | BFR | P | 04/14/2021 | pending other required inspections / need to attach mech permit / frame OK / reviewed accessible elements with site rep / handrail to return at top of stairs and will need overhead hazard protection under stairs by final | LONNYS | LONNYS | | BFR | P | 6933943 |
METHOD ELECTRIC LLC | E= | C | 08/02/2021 | 40 amp a/c | TOMC | TOMC | | E= | C | 7056906 |
METHOD ELECTRIC LLC | ER | P | 04/14/2021 | interior walls | TOMC | TOMC | | ER | P | 6933048 |
METHOD ELECTRIC LLC | ER | P | 04/12/2021 | hard lid work shop #1 , #2 - hi-lighted in green | TOMC | TOMC | | ER | P | 6929591 |
SAINT JOSEPH PLUMBING LLC | H= | C | 09/07/2021 | REVISED PLANS ON FILE FOR DELTA 7 APPROVING CSST GAS PIPING USED FOR FIREPLACE. GAS FINAL OK. | DUSTINS | DUSTINS | | H= | C | 7097690 |
SAINT JOSEPH PLUMBING LLC | HSP | P | 08/25/2021 | AFTER FURTHER REVIEW OF ENGINEER LETTER, NEED REVISED LETTER OR THE APPROVED PLANS THE LETTER REFERENCES. ENGINEER LETTER REFERENCES STAMPED PLANS ISSUED 8-17-21 APPROVING CSST. PPRBD DOES NOT HAVE THIS PLAN REVISION WITH DELTA 7. | DUSTINS | DUSTINS | | HSP | P | 7085773 |
SAINT JOSEPH PLUMBING LLC | H= | P | 08/25/2021 | ENGINEER LETTER RECEIVED, WILL REVIEW AND UPDATE. | DUSTINS | DUSTINS | | H= | P | 7084245 |
SAINT JOSEPH PLUMBING LLC | H= | P | 08/17/2021 | GAS FINAL PENDING: NEED ENGINEER TO ADDRESS CSST USED FOR FIREPLACE GAS PIPING. PLAN CALLS FOR BLACK IRON. | DUSTINS | DUSTINS | | H= | P | 7075070 |
SAINT JOSEPH PLUMBING LLC | HO | C | 08/17/2021 | PRESSURE TEST COMPLETED ON 5-7-21. PIPING PER PLAN SPLICE. | DUSTINS | DUSTINS | | HO | C | 7075069 |
SAINT JOSEPH PLUMBING LLC | HC | C | 08/17/2021 | ADDING 140K TO EXISTING LOAD. (315K TOTAL LOAD) | DUSTINS | DUSTINS | | HC | C | 7075066 |
SAINT JOSEPH PLUMBING LLC | HI | C | 08/17/2021 | PRESSURE TEST COMPLETED ON 5-7-21. PIPING PER PLAN SPLICE EXCEPT STILL NEED ENGINEER TO ADDRESS CSST USED FOR FIREPLACE. | DUSTINS | DUSTINS | | HI | C | 7075064 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 08/11/2021 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 7067736 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/10/2021 | MECHANICAL FINAL PENDING: PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 7065948 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | C | 08/10/2021 | RECEIVED PICTURE OF FURNACE VENT SUPPORTS, SEE IMAGES. | DUSTINS | DUSTINS | | HV | C | 7065945 |
SAINT JOSEPH PLUMBING LLC | H= | R | 08/06/2021 | PICTURE ATTACHED IS FOR PLUMBING. CONTRACTOR TO ATTACH TO PLUMBING INSPECTION. | DUSTINS | DUSTINS | | H= | R | 7062822 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/05/2021 | ADD FIREPLACE TO SCOPE OF WORK. COMPLETE HV INSPECTION. ALL SUPPLY/RETURN/EXHAUST DUCTS AND DIFFUSERS MATCH PLAN SPLICE. MECHANICAL FINAL PENDING: CORRECT SCOPE OF WORK. COMPLETE HV INSPECTION. PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 7061717 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | P | 08/05/2021 | NEED TO SUPPORT FURNACE VENT EVERY 3 1/2' PER INSTALLATION INSTRUCTIONS. | DUSTINS | DUSTINS | | HV | P | 7061716 |
SAINT JOSEPH PLUMBING LLC | HI | P | 08/03/2021 | CONTRACTOR TO ADDRESS THE FOLLOWING-- WILL NEED PLAN SPLICE TO REFLECT GAS PIPING INSTALLED AND TO ALL APPLIANCES AND ENGINEER TO ADDRESS CSST TO FIRE PLACE (PLANS CALL FOR RIGID), NEED LICENSED MECHANICAL CONTRACTOR TO CLAIM FIRE PLACE, NEED HO INSPECTION FOR BURIED GAS LINE PER PLANS. 10 lb test ok per previous notes / (gas to 2 unit heaters in open work area was existing from permit #M78797) | PAULO | PAULO | | HI | P | 7059320 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | P | 06/23/2021 | COMPLETE FURNACE VENT. ADD FIREPLACE TO SCOPE OF WORK. FIREPLACE IS NO LONGER FUTURE APPLIANCE AND NEEDS TO BE REFLECTED ON PLANS. UPPER LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK. NON-COMBUSTIBLE MATERIALS INSTALLED. | DUSTINS | DUSTINS | | HV | P | 7012859 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/23/2021 | PLANS DO NOT MATCH INSTALL ON SITE. PER CONVERSATION WITH GENERAL CONTRACTOR ON SITE, PLANS ARE BEING RE-SUBMITTED TO SHOW ONLY ONE FURNACE PROVIDING HEAT INSTEAD OF TWO FURNACE AND UNIT HEATER. FURNACE VENT NEEDS TO BE COMPLETED AND SUPPLY DUCTS COMPLETE FROM FLEX CONNECTOR TO FURNACE. RE-INSPECT ALL WHEN PLANS HAVE BEEN REVISED/APPROVED. | DUSTINS | DUSTINS | | HD | P | 7012842 |
SAINT JOSEPH PLUMBING LLC | HI | P | 05/07/2021 | NEED MECHANICAL CONTRACTOR ATTACHED FOR NEW MECHANICAL WORK. INSTALLATION DOES NOT MATCH APPROVED PLAN. NEED REVISED APPROVED PLANS MATCHING INSTALL ON SITE. IS GAS TO THE UNIT HEATERS EXISTING? PLANS DO NOT INDICATE ANY EXISTING GAS PIPING. ENGINEER TO ADDRESS CSST USED FOR GAS PIPING TO FUTURE FIREPLACE, PER NOTE 7 ON PLAN, ALL GAS PIPING INSIDE BUILDING ABOVE GRADE TO BE STEEL BLACK PIPE. PLAN SHOWS METER IN DIFFERENT LOCATION THAN WHERE METER IS INSTALLED. PLANS DO NOT SHOW THE UNDERGROUND PIPING TO WHERE GAS PIPING ENTERS BUILDING BY FURNACE 1. RE-INSPECT ALL WHEN PLANS HAVE BEEN REVISED/APPROVED. 10 LB TEST OK. | DUSTINS | DUSTINS | | HI | P | 6961307 |
SAINT JOSEPH PLUMBING LLC | P= | C | 09/03/2021 | potable water certification in images | JOSEPHD | JOSEPHD | | P= | C | 7095941 |
SAINT JOSEPH PLUMBING LLC | P= | P | 08/09/2021 | still need potable water certification, other correction made | JOSEPHD | JOSEPHD | | P= | P | 7064333 |
SAINT JOSEPH PLUMBING LLC | PTO | C | 08/03/2021 | | JOSEPHD | JOSEPHD | | PTO | C | 7058447 |
SAINT JOSEPH PLUMBING LLC | P= | P | 08/03/2021 | need potable water certification, need knee protection at lav, rest ok, Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | JOSEPHD | JOSEPHD | | P= | P | 7058445 |
SAINT JOSEPH PLUMBING LLC | PTO | P | 04/14/2021 | need to see vent stubbed thru roof, need mechanical permit attached, rest ok note: need potable water certification by final, check water heater and water main connection by final | JOSEPHD | JOSEPHD | | PTO | P | 6933224 |
SAINT JOSEPH PLUMBING LLC | PTO | L | 03/30/2021 | front door locked at 10:44, call ahead completed at 9:30 | JOSEPHD | JOSEPHD | | PTO | L | 6915238 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 08/27/2021 | PAID (REC#1802895): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: CHANGE GAS PIPE | DALEH | DALEH | | XMS | T | 7087806 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 07/21/2021 | PAID (REC#1791925): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7043318 |
METHOD ELECTRIC LLC | XES | P | 07/06/2021 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added water heater. | BERTHA | BERTHA | | XES | P | 7025654 |
SAINT JOSEPH PLUMBING LLC | XPS | T | 06/15/2021 | PAID (REC#1782790): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 4 revisions: Adjusted sheet P-0.0 and P-1.0. | SHANEN | SHANEN | | XPS | T | 7002240 |