T.N. PARKER CONSTRUCTION, LLC | B= | C | 03/24/2023 | All items complete / Roof work removed from scope of work / | ERIKK | ERIKK | | B= | C | 7697078 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 11/07/2022 | phone consultation on roof repair progress | SHAUN | SHAUN | | BSP | P | 7574300 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 05/25/2022 | still need to complete roof repair | BOBF | BOBF | | BSP | P | 7388202 |
T.N. PARKER CONSTRUCTION, LLC | B= | P | 12/16/2021 | still need to complete roof repair and other required inspections, rest of building okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ELECTRIC SERVICE OF COLORADO, LLC Electrical Final Inspection is not Completed yet, VICTORY AIR Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7210926 |
T.N. PARKER CONSTRUCTION, LLC | B= | P | 12/01/2021 | need to complete all other required inspections / provide signage at accessible restrooms, door hardware at double door to rear area is not ANSI compliant / need to install ansi compliant switch for range vent fan -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection FHP= by FIREDEPT is not Completed yet, ELECTRIC SERVICE OF COLORADO, LLC Electrical Final Inspection is not Completed yet, FRONTIER MECHANICAL SYSTEMS INC Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet, VICTORY AIR Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7194379 |
T.N. PARKER CONSTRUCTION, LLC | BFN | P | 10/05/2021 | 3 light piers okay | BOBF | BOBF | | BFN | P | 7130238 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 08/23/2021 | interior wall and hardlid framing east of CMU wall okay / reviewed Accessible elements | BOBF | BOBF | | BFR | P | 7081110 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 08/20/2021 | letter for stud attachment to exterior CMU wall on file | BOBF | BOBF | | BFR | P | 7079063 |
T.N. PARKER CONSTRUCTION, LLC | BLA | C | 08/12/2021 | | BOBF | BOBF | | BLA | C | 7069737 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 08/06/2021 | pending completion of other required inspections interior non rated - non bearing wall framing west of CMU wall okay / pending receipt of stamped letter for wall attachment -exterior facade framing okay / Reviewed Accessible Elements / please note a full kitchen with cooktop and double oven is part of permit and will be required to be fully ANSI compliant | BOBF | BOBF | | BFR | P | 7063421 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 04/05/2022 | Added coolers OK. | AARONR | AARONR | | E= | C | 7327303 |
ELECTRIC SERVICE OF COLORADO, LLC | ES | C | 04/05/2022 | Commercial Service: 1200 amp service OK. --- No action needed by CSU. | AARONR | AARONR | | ES | C | 7327301 |
ELECTRIC SERVICE OF COLORADO, LLC | ES | P | 04/01/2022 | Commercial Service: pre-release ok----- I spoke to contractor and looks like job is heading in the right direction------- complete re-inspect | MATTHEW | MATTHEW | | ES | P | 7323823 |
ELECTRIC SERVICE OF COLORADO, LLC | ES | P | 03/24/2022 | Residential Underground: Pre release ok / | CRAIG | CRAIG | | ES | P | 7312734 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 11/24/2021 | only thing left to inspect is added coolers and freezers --- told contractor to make sure a splice has been submitted and approved before final --- and inspect the service upgrade | CRAIGS | CRAIGS | | E= | P | 7188452 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 11/03/2021 | walk ins ok pole lights ok cooler / freezer on roof ok note fire alarm panel is ok | CRAIG | CRAIG | | E= | P | 7164102 |
ELECTRIC SERVICE OF COLORADO, LLC | EUG | C | 10/05/2021 | trench and 3/4" PVC to 3 light pole bases okay | CHIPO | CHIPO | | EUG | C | 7131129 |
SPECIAL SYSTEMS DESIGN,LLC | E= | P | 10/01/2021 | FIRE ALARM INSPECTION: above drop ceilings OK still need to see fire alarm panel | CRAIGS | CRAIGS | | E= | P | 7127583 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 10/01/2021 | FIRE ALARM INSPECTION: above drop ceilings OK | CRAIGS | CRAIGS | | E= | C | 7127584 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | C | 10/01/2021 | above drop ceilings OK | CRAIGS | CRAIGS | | ER | C | 7127582 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 08/31/2021 | FIRE ALARM INSPECTION: Still need above ceiling for drop ceiling areas and center of warehouse area - all else rough in okay | CHIPO | CHIPO | | ER | P | 7091519 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 08/11/2021 | hard lid restrooms --- walls ware house are restrooms --- janitors closet and walls at the volunteer entrance --- need to inspect above ceiling to complete the rough | CRAIGS | CRAIGS | | ER | P | 7068980 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 08/05/2021 | rough in for new walls all okay except warehouse area | CHIPO | CHIPO | | ER | P | 7062618 |
VICTORY AIR | H= | C | 09/28/2022 | SEE HRP NOTES / | JERRYF | JERRYF | | H= | C | 7532997 |
VICTORY AIR | HRP | C | 09/28/2022 | NOTE / 6 REACH IN COOLERS AND EVAPORATION PANS OK / | JERRYF | JERRYF | | HRP | C | 7532996 |
VICTORY AIR | HE | L | 09/27/2022 | Renewed for $100.00 at 9/27/2022 9:17:13 AM (Receipt#1902443) | BRITNEY | BRITNEY | | HE | L | 7530820 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 12/08/2021 | ALL PIPING AND FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 7202169 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 12/08/2021 | OK FOR METER RELEASE | JERRYF | JERRYF | | HC | C | 7202155 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 12/07/2021 | NOTE / TAB REPORT RECEIVED / PLAN REVISION COMPLETE / | JERRYF | JERRYF | | H= | C | 7199564 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 11/29/2021 | NEED THE FOLLOWING - TAB REPORT AND PLAN SPLICE PER PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 7190817 |
ALNOR INC. | H= | C | 11/03/2021 | ALL CORRECTIONS MADE SEE IMAGES | JERRYF | JERRYF | | H= | C | 7163498 |
ALNOR INC. | H= | P | 11/02/2021 | NEED PICTURE OF REFRIGERATION LABEL ATTACHED TO INSPECTION REQUEST FOR COOLER IN GROCERY AREA | JERRYF | JERRYF | | H= | P | 7163104 |
ALNOR INC. | HRP | C | 11/02/2021 | NOTE / ALL ALARMS AND DRAINS ARE COMPLETE | JERRYF | JERRYF | | HRP | C | 7163092 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 10/19/2021 | 10 LB TEST OK | BILLS | BILLS | | HI | C | 7146132 |
FRONTIER MECHANICAL SYSTEMS INC | HI | R | 10/18/2021 | NEED 10# ON 15 OR 30# GAUGE - STOPPED INSPECTION NOTE / PIPING PER PLAN / | JERRYF | JERRYF | | HI | R | 7145219 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 09/27/2021 | Approved plans show 11/4" gas pipe to water heater but contractor changed to 3/4" for last half of the run. 10 PSI TEST OK - IF CHANGING GAS TO MATCH PLAN, WILL NEED A NEW PRESSURE TEST. | MARKB | MARKB | | HI | P | 7121300 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/24/2021 | NEED THE FOLLOWING - PLAN REVISION SHOWING ALL EXHAUST EXITING BUILDING AT NORTH END WHERE PLAN SHOWS THROUGH ROOF AND NEW DRYER VENT ADDED TO PLANS - EXPOSED DUCT AT RTU 11 - B VENT FOR WATER HEATER - TRANSFER GRILLES TO RISER ROOM - TAB REPORT - EF #5 COMPLETED AT STORAGE AREA AT WALK IN COOLERS - ARE ALL THERMOSTATS IN EXISTING LOCATIONS (IF NEW LOCATIONS WILL NEED TO INSTALL LOCK BOXES) - ROOF INSPECTION NOTES: ABOVE CEILING SA / RA / EXHAUST GRILLES ARE COMPLETE IN ALL LAY IN AREA'S | JERRYF | JERRYF | | HD | P | 7119663 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/05/2021 | THIS INSPECTION WAS FOR ABOVE CEILING SA / RA - STILL NEED ALL EXPOSED DUCT AND RESTROOM EXHAUST THROUGH OUT BUILDING - ROOF INSPECTION NOTES: ABOVE CEILING SA / RA MAINS AND RUN OUTS ABOVE CEILING OK | JERRYF | JERRYF | | HD | P | 7062329 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 11/30/2021 | See images. | DANR | DANR | | P= | C | 7192100 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 11/29/2021 | Need dishwasher high loop / Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / rest ok. | DANR | DANR | | P= | P | 7189537 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 11/23/2021 | Roll up break sink lacking knee clearance and pipe protectors / sink by dishwasher needs isolation valve, hammer arrestor, and high loop / toilet on room 04 needs to flush to open side / need engineers letter for AAV's noted on PTO / Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / pictures / rest ok. | DANR | DANR | | P= | P | 7187147 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 11/23/2021 | Ok. Note: Need engineers letter for AAV's by final. | DANR | DANR | | PTO | C | 7187145 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 08/31/2021 | BY FINAL need engineers letter allowing aav's @ water entry floor drain, S-1, and S-2 sinks installed above ceiling grid (in lieu of vtr on plans)
partial status pending engineers aav approval letter
rest ok | JOHNS | JOHNS | | PTO | P | 7091363 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 08/18/2021 | ok for in wall dwv / h20 only MINUS waters insulated per plan / IECC reqs @ areas where wall are not insulated, all pvc flanges secured, and water entry f.d. vent. NOTE: --BY FINAL need engineers letter allowing aav's @ water entry floor drain, S-1, and S-2 sinks installed above ceiling grid (in lieu of vtr on plans)--, vtr (existing ), aav's @ water entry floor drain, S-1, and S-2 sinks (all above ceiling) check b-vent water htr /water htr final connections / reqs noted on plans @ final, clean out in wall @ water htr room to be accessible by final, other baths on north "east" side are pre existing and only re setting fixtures | JOHNS | JOHNS | | PTO | P | 7076149 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 08/05/2021 | --VERIFY SCOPE @ PTO-- | JOHNS | JOHNS | | PB | C | 7062006 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 07/23/2021 | NEED contractor on site for inspections
ok for sprinkler room, warehouse baths / janitor closet / and water htr closet only today
STILL NEED remainder
ins note only: verify scope of work | JOHNS | JOHNS | | PB | P | 7047714 |
T.N. PARKER CONSTRUCTION, LLC | XBS | P | 03/23/2023 | PLAN SPLICE: (No Fee) by: DANM for Construction: Minor structural scope of work removed | DANM | DANM | | XBS | P | 7695863 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 12/06/2021 | PAID (REC#1827573): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Field changes. | TCRIPPEN | TCRIPPEN | | XMS | T | 7199072 |
ELECTRIC SERVICE OF COLORADO, LLC | XES | T | 10/18/2021 | PAID (REC#1815765): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add series arting | SHELBY | SHELBY | | XES | T | 7145684 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 09/22/2021 | PAID (REC#1808929) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: relocate gas line | TCRIPPEN | TCRIPPEN | | XMS | T | 7116260 |