TURNER CONSTRUCTION COMPANY | B= | C | 02/01/2023 | Items corrected | NATHAN | NATHAN | | B= | C | 7650309 |
TURNER CONSTRUCTION COMPANY | B= | P | 12/20/2022 | Hot toilet - Both horizontal grab bars installed too high ( 37.25" ) Regular Toilet - Both horizontal grab bars installed too height and vertical grab bar installed at 38" from rear wall ( Needs to be 39-41" ) All other final items OK -- Schedule a new Building Final when above items are complete. | ADAML | ADAML | | B= | P | 7616506 |
TURNER CONSTRUCTION COMPANY | BFR | P | 04/15/2022 | Corridor ceiling frame and I 503 1st layer drywall 2nd layer started and staggered okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 7340734 |
TURNER CONSTRUCTION COMPANY | BFR | P | 04/07/2022 | shaft wall and I 503 frame with completed required mechanical inspections okay.. | NATHAN | NATHAN | | BFR | P | 7329743 |
TURNER CONSTRUCTION COMPANY | BSP | P | 04/01/2022 | Shaft wall assembly for vertical shaft using U415 design okay and 1st layer drywall with core board okay, new rated fire barrier okay for using exception 3 of the code for ducted penetration without fire damper being used. | NATHAN | NATHAN | | BSP | P | 7322975 |
TURNER CONSTRUCTION COMPANY | BFR | P | 03/31/2022 | Need approved spliced plan for new vertical shaft replacing old shaft at future space 1418 using USG drywall and horizontal I503 in floor above over future space 1419 also I503 requires 6" framing / mechanical inspector will need to look at all damper framing in these shafts. | NATHAN | NATHAN | | BFR | P | 7321327 |
TURNER CONSTRUCTION COMPANY | BFR | R | 03/30/2022 | Inspector cannot meet the request to meet after noon, called ahead and left a message, sent call ahead, called when on site no answer and no access. | NATHAN | NATHAN | | BFR | R | 7319862 |
TURNER CONSTRUCTION COMPANY | BFR | P | 02/25/2022 | Framing (walls and ceilings) in Injection Bay 1423, 1424, 1425, 1426 with completed required inspections okay. | NATHAN | NATHAN | | BFR | P | 7282511 |
TURNER CONSTRUCTION COMPANY | BFR | P | 02/08/2022 | Hardlid framing at toilet rooms and future spec control room , wall at hot lab okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 7262886 |
TURNER CONSTRUCTION COMPANY | BFR | P | 01/27/2022 | Reviewed the existing conditions at future Nuclear Camera space and control area to corridor , the vertical and horizontal areas and plans for where dampers are needed and when. plans must reflect continuity, listing used, supporting and connection of fire barriers for horizontal and vertical walls / horizontal and vertical rating being tied into must be of same hourly rating / Partial framing inspection - HOT LAB okay with completed required inspections | NATHAN | NATHAN | | BFR | P | 7252534 |
TURNER CONSTRUCTION COMPANY | BFR | P | 12/29/2021 | Perimeter framed walls of 124-126, frame of walls from 120-123 , discussed and reviewed accessibility, screw inspection east facing walls corridor C14-7A | NATHAN | NATHAN | | BFR | P | 7223679 |
TURNER CONSTRUCTION COMPANY | BFR | P | 11/29/2021 | Per RFI rated walls have been changed by design professional to U425 generic listing with approval for American Gypsum. | NATHAN | NATHAN | | BFR | P | 7190280 |
TURNER CONSTRUCTION COMPANY | BFR | P | 11/23/2021 | U419 called for on Fire Barrier walls USG is needed and American Gypsum used for corridor walls / East exterior side of corridor C14-7A American Gypsum applied at 12" o.c. to 3 5/8" 20 gauge studs 16" o.c. design professional to address new UL listing for rated walls and splice plans, door framing at C14-7A okay / discussed listed penetration protection . | NATHAN | NATHAN | | BFR | P | 7186813 |
TURNER CONSTRUCTION COMPANY | BFR | P | 11/16/2021 | Corridor C14-7a // Light gauge steel frame at D1b and D2b walls ok / Will need to inspect oversized openings in use for material moving after they are reframed / Discussed rated assembly inspection process with contractor | TIMOTHYS | TIMOTHYS | | BFR | P | 7179243 |
TURNER CONSTRUCTION COMPANY | BFR | P | 11/01/2021 | Light gauge steel framing in wall types D1bX, G01, D0b, D1b ok in 1419, 1414, and C14-5 / No other framing inspected at this time | TIMOTHYS | TIMOTHYS | | BFR | P | 7161824 |
TURNER CONSTRUCTION COMPANY | BFR | P | 10/13/2021 | Complete MEP rough inspections / Corridor C14-6 rock and rock attachment ok - Provide RFI for rated membrane jog around waste water pipe / Room 1413 Sub wait D0bX walls light gauge steel frame ok / Room 1414A PETCT equipment D0b and D0s walls light gauge steel frame ok / No other framing inspected at this time | TIMOTHYS | TIMOTHYS | | BFR | P | 7140921 |
TURNER CONSTRUCTION COMPANY | BFR | P | 09/30/2021 | Complete MEP rough inspections / Corridor C14-6 Light gauge steel framing ok at D0bX walls / Provide RFI or engineers detail for G0l wall as it varies from approved plans / Provide engineers detail for G0l wall where it jogs around storm water pipe / Discussed inspection requirements for rated assemblies, inspection order | TIMOTHYS | TIMOTHYS | | BFR | P | 7126555 |
RK ELECTRICAL, LLC | E= | C | 11/30/2022 | | BRIAN | BRIAN | | E= | C | 7596033 |
RK ELECTRICAL, LLC | E= | P | 11/23/2022 | need to test the EPO / label the disconnect where it feeds from and what it serves / upload test report / | BRIAN | BRIAN | | E= | P | 7592478 |
RK ELECTRICAL, LLC | E= | P | 06/24/2022 | waiting on ct , need ct room and panel for ct / rest ok / see plans marked in yellow / | BRIAN | BRIAN | | E= | P | 7425077 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 03/28/2022 | FIRE ALARM INSPECTION: above ceiling---ok | BRIAN | BRIAN | | E= | C | 7317080 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | C | 03/28/2022 | FIRE ALARM INSPECTION: above ceiling---ok | BRIAN | BRIAN | | ER | C | 7317079 |
RK ELECTRICAL, LLC | ER | P | 03/25/2022 | partial grid ceilings --see plans / | BRIAN | BRIAN | | ER | P | 7315082 |
RK ELECTRICAL, LLC | ER | P | 03/02/2022 | Need ceiling access to all j-boxes 22"x22" minimum / Walls only - Ok, Rooms 1424, 1425, and 1426 | BRETC | BRETC | | ER | P | 7287027 |
RK ELECTRICAL, LLC | ER | P | 02/10/2022 | Hard lid inspection for room 1420 & 1421 / Wall inspection only for room 1423 / New added soffit - Ok / 2 Corridor hard lid and 1 exit - Whips ran,------------- take pictures of grounding------------ | BRETC | BRETC | | ER | P | 7266049 |
RK ELECTRICAL, LLC | ER | P | 01/25/2022 | Wall inspection for rooms 1420, 1421, and 1422 - 2 restrooms and Hot lab marked on drawings - 1/25 | BRETC | BRETC | | ER | P | 7248991 |
RK ELECTRICAL, LLC | ER | P | 12/07/2021 | fire alarm in corridor 14 - 6 ok | CRAIG | CRAIG | | ER | P | 7199770 |
RK ELECTRICAL, LLC | ER | P | 12/07/2021 | above ceiling in corridor 14 - 6 ok | CRAIG | CRAIG | | ER | P | 7199755 |
RK ELECTRICAL, LLC | ER | P | 11/29/2021 | walls in room 1415 and corridor C14 - 7 A ok | CRAIG | CRAIG | | ER | P | 7189986 |
RK ELECTRICAL, LLC | ER | R | 11/23/2021 | on one able to do inspection until Monday due to vaccination requirement / | BRIAN | BRIAN | | ER | R | 7187258 |
RK ELECTRICAL, LLC | ER | P | 11/15/2021 | WALLS IN ROOMS 1413, 1414, 1414 A, 1416, 1418, AND HALLWAY 14 - 7 ONLY OK | CRAIG | CRAIG | | ER | P | 7176752 |
RK ELECTRICAL, LLC | ER | P | 10/07/2021 | Corridor C 14 - 6 for walls only 1 plug / 2 card readers / 2 magnet holds ok Discussed accessibility requirements with contractor / Discussed NPT connectors with contractor / | CRAIG | CRAIG | | ER | P | 7133450 |
RK MECHANICAL, LLC | H= | C | 12/07/2022 | SPLICE FOR HUMIDIFIER AND HYDRONIC PIPING ON FILE. STEAM PIPE INSULATION AND CONDENSATE PIPING COMPLETE. | MARKB | MARKB | | H= | C | 7604018 |
RK MECHANICAL, LLC | H= | L | 11/21/2022 | No splice on file - contractor will reschedule inspection when approved splice is on file | MARKB | MARKB | | H= | L | 7589759 |
RK MECHANICAL, LLC | H= | P | 08/22/2022 | FINAL PENDING ----ENGINEER TO ADDRESS: Supply/return hydronic piping not installed per plan. Humidifier not installed per plan.---- Complete insulation on steam piping to humidifier. HUMIDIFIER INSTALL COMPLETE, STEAM PIPING FOR HUMIDIFIER AND CONDENSATE PIPING UNDER OPERATING PRESSURE - CONTINUE AT OWN RISK. ACCESS DOORS COMPLETE FOR CURTAIN DAMPER INSTALLED OUTSIDE ROOM 1415. | MARKB | MARKB | | H= | P | 7490455 |
RK MECHANICAL, LLC | H= | L | 08/15/2022 | NO SITE CONTACT PROVIDED, CALL AHEAD WENT TO OFFICE WITH NO ANSWER. | MARKB | MARKB | | H= | L | 7482672 |
RK MECHANICAL, LLC | HSP | P | 08/15/2022 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | HSP | P | 7482209 |
RK MECHANICAL, LLC | HD | P | 07/07/2022 | ----ENGINEER TO ADDRESS: HUMIDIFIER NOT INSTALLED IN DUCT WHERE SHOWN ON PLANS. HYDRONIC PIPING DOES NOT MATCH PLANS.---- ABOVE CEILING DUCT - HUMIDIFIER DUCT SECTION OK FOR SUPPORT AND SEALED - CONTINUE AT OWN RISK. No steam or condensate piping installed at this time. | MARKB | MARKB | | HD | P | 7437568 |
RK MECHANICAL, LLC | H= | P | 06/24/2022 | FINAL PENDING - Still need plan splices for hydrnoic piping. Curtain damper outside 1415 lacks proper access. Still need to install humidifier. Provide test and balance report. OTHER DAMPER ACCESS AND EXHAUST FAN ON ROOF OK. | MARKB | MARKB | | H= | P | 7424388 |
RK MECHANICAL, LLC | HD | P | 04/21/2022 | FOR FINAL - Complete access doors for fire/smoke dampers. Install exhaust fan on roof. Complete all plan splices. Provide test and balance report. 48 X 18 FIRE/SMOKE DAMPER AT SHAFT IN I503 - NO ANNULAR SPACE REQUIRED PER I503 INSTRUCTIONS. SINGLE SIDED ANGLES COMPLETE. BREAK AWAY CONNECTIONS COMPLETE. 10" EXHAUST DUCT & FIRE/SMOKE DAMPERS IN I503 SHAFT - SUPPORT ON TOP SIDE PER ENGINEER DETAIL. BOTH TOP AND BOTTOM PLATES INSTALLED AND BREAKAWAY CONNECTIONS COMPLETE. OK TO COVER DUCT AND DAMPERS IN SHAFT. | MARKB | MARKB | | HD | P | 7346900 |
RK MECHANICAL, LLC | HD | P | 04/14/2022 | DAMPER EXTENSION SLEEVE FOR 48" GOING IN I503 ASSEMBLY INSTALLED ON DAMPER PER MANUFACTURER INSTRUCTIONS. | MARKB | MARKB | | HD | P | 7338512 |
RK MECHANICAL, LLC | HD | P | 04/07/2022 | I503 DAMPER FRAMING FOR 48"X18" FIRE/SMOKE DAMPER IS INSTALLED PER MANUFACTURER INSTRUCTIONS. DAMPER FRAMING IN SHAFT WALL FOR 10" EXHAUST COMPLETE. | MARKB | MARKB | | HD | P | 7330526 |
RK MECHANICAL, LLC | HSP | P | 04/06/2022 | HAD ON SITE CONSULT WITH GENERAL CONTRACTOR, FRAMER AND MECHANICAL CONTRACTOR ABOUT DAMPER INSTALL IN I503 ASSEMBLY IN BOTTOM OF SHAFT - WENT OVER DAMPER MANUFACTURER INSTRUCTIONS FOR FRAMING (not currently framed to match), WILL REQUIRE SLEEVE EXTENSION INSTALLED PER MANUFACTURER AND 16 GAUGE ANGLES FOR 2 HR ASSEMBLY FASTENED ON 6" CENTERS. FRAMING NEEDS TO INSPECTED BY BOTH MECHANICAL AND FRAMING INSPECTORS PRIOR TO DRYWALL. | MARKB | MARKB | | HSP | P | 7328890 |
RK MECHANICAL, LLC | HWP | P | 03/25/2022 | ----NEED ENGINEER TO ADDRESS: Supply & return hydronic piping does not match plan. Steam piping to humidifier is shown on current plan splice as 2.5" but 11/4" was run. Start location and tie in of new steam piping will differ form plan. What material does steam piping need to be, currently has sch 80 steel.---- 60 PSI PRESSURE TEST ON STEAM PIPING FROM HUMIDIFIER BACK TO ROOM AT GRID LINE 21 OK - CONTINUE AT OWN RISK. | MARKB | MARKB | | HWP | P | 7314884 |
RK MECHANICAL, LLC | HD | P | 03/25/2022 | ABOVE CEILING DUCT - FLEX, DIFFUSERS AND TRANSFERS COMPLETE FOR WHOLE PERMIT SCOPE. STILL NEED: To inspect damper access doors through rated construction. Complete shaft and dampers in future area. Need to see all controls completed. Provide test and balance report. | MARKB | MARKB | | HD | P | 7314872 |
RK MECHANICAL, LLC | HD | P | 03/03/2022 | ABOVE CEILING DUCT - FLEX AND DIFFUSERS COMPLETE IN CORRIDOR C14-7 & CONTROL 1415. DAMPER ANGLES COMPLETE ON 48X14 DAMPER AT HOT LAB 1422. | MARKB | MARKB | | HD | P | 7289493 |
RK MECHANICAL, LLC | HWP | P | 01/25/2022 | ----ENGINEER TO ADDRESS: Supply/return hydronic piping does not match plans for size or route---- PIPING CONNECTED TO VAV'S OK FOR SUPPORT - CONTINUE AT OWN RISK. | MARKB | MARKB | | HWP | P | 7249196 |
RK MECHANICAL, LLC | HSP | P | 01/25/2022 | HAD ON SITE CONSULT WITH TURNER CONST., RK MECH & CALL BUILDING INSPECTOR ON PHONE FOR SHAFT OR CHASE IN CEILING AT FUTURE ROOM 1418. LOOKS LIKE BOTTOM AT CEILING LEVEL HAS BEEN REMOVED. ENGINEER HAS ASKED FOR EXISTING 55X14 SUPPLY TO HAVE A FIRE/SMOKE DAMPER ADDED TO IT. CONTRACTOR HAS INSTALLED A DAMPER IN DUCT WITHOUT FRAMING THAT CAN ONLY BE USED IN A CONCRETE FLOOR. DOES EXISTING 72X30 AND NEW 10" EXHAUST NEED TO BE PROTECTED AT TOP, BOTTOM OR BOTH. IS IT A CHASE OR SHAFT? ARE THE WALLS OR CEILING RATED? DESIGN TEAM TO EXPLAIN EXACTLY WHAT IT IS AND HOW OR WHERE PROTECTION IS REQUIRED. | MARKB | MARKB | | HSP | P | 7249184 |
RK MECHANICAL, LLC | HD | P | 01/25/2022 | FIRE DAMPER FRAMING FOR 48X14 DAMPER AT HOT LAB WALL 1422 OK. | MARKB | MARKB | | HD | P | 7249150 |
RK MECHANICAL, LLC | HD | P | 01/18/2022 | ----ENGINEER TO ADDRESS: Existing shaft for 55"x14" existing duct has had the bottom removed at ceiling level. A new fire/smoke damper has been installed in the 55x14 but damper is listed only for concrete floor which will not work in this application. how is new 10" exhaust duct penetration into bottom of shaft? no damper or framing at this time or shown on plans. See note M19---- DAMPER ANGLES - FIRE DAMPER ANGLES COMPLETE FOR ALL DAMPERS LOCATED IN CORRIDORS C14-7 & C14-7A. ABOVE CEILING DUCT - 14X14 EXHAUST DUCT COMPLETE EXCEPT FOR GRILLS. MEDIUM/LOW PRESSURE DUCT FOR VAV'S 1-9 & 1-10 OK TO WRAP - No flex or diffusers. | MARKB | MARKB | | HD | P | 7242426 |
RK MECHANICAL, LLC | HWP | P | 01/03/2022 | PRESSURE TEST ON 2" HOT SUPPLY/RETURN PIPING FROM TIE IN POINT THROUGH CORRIDOR C14-7A OK TO INSULATE. | MARKB | MARKB | | HWP | P | 7226270 |
RK MECHANICAL, LLC | HD | P | 01/03/2022 | ABOVE CEILING DUCT - LOW/MEDIUM PRESSURE DUCT FOR TB 1-07 OK TO WRAP. Had discussion with Matt about fire damper access through duct. | MARKB | MARKB | | HD | P | 7226261 |
RK MECHANICAL, LLC | HD | P | 12/28/2021 | ABOVE CEILING DUCT - 22X20 RETURN AIR, RETURN AIR WITH 3 RUN OUTS & 3 - 14" RETURNS OK TO WRAP. LOW PRESSURE DUCT FOR TB 1-02 & 1-06 OK TO WRAP. MEDIUM PRESSURE DUCT FOR TB 1-06 OK TO WRAP. | MARKB | MARKB | | HD | P | 7222755 |
RK MECHANICAL, LLC | HD | P | 12/20/2021 | ----PLAN SPLICE REQUIRED: Medium pressure duct for TB-1-06 is fedding from a different trunk line.---- ABOVE CEILING DUCT - MEDIUM/LOW PRESSURE DUCT FOR TERMINAL BOXES 1-03 (low pressure only), 1-04, 1-05 & 1-07 OK TO WRAP. 4TH DAMPER FRAMING IN CORRIDOR C14-7 COMPLETE. | MARKB | MARKB | | HD | P | 7214568 |
RK MECHANICAL, LLC | HD | P | 12/07/2021 | ----NEED ENGINEER TO ADDRESS: How maintaining duct protect for new fire wall for existing 50x20 duct where shaft and wall intersect at an angle. Will need stamped engineer letter for damper support detail---- DAMPER FRAMING IN CORRIDOR WALL C14-7 OK FOR 3 DAMPERS, Still need to cover openings into wall from opening located at top left of wall. | MARKB | MARKB | | HD | P | 7200701 |
RK MECHANICAL, LLC | HD | R | 12/03/2021 | --FURTHER RESEARCH REQUIRED: Existing 50x20 duct up to RTU-2 penetrates new rated wall without a damper.---- DAMPER FRAMING - LOOKED AT MULTIPLE DAMPER FRAMES IN CORRIDOR C14-7 WALL - Either need wall support framing to continue from floor to ceiling plates on each side of dampers or support per engineer detail with all thread and unitrut. | MARKB | MARKB | | HD | R | 7197502 |
RK MECHANICAL, LLC | HD | P | 12/01/2021 | ----ENGINEER TO ADDRESS: 48X14 air duct and 14x14 exhaust duct has been rerouted down corridor C14-6 but is shown as existing in different location---- FIRE DAMPER SUPPORT AT CORRIDOR C14-6 FOR 48X14 OVER DOUBLE DOOR IS SUPPORTED PER ENGINEER DETAIL 5 ON PLAN SHEET S100. ANNULAR SPACE AND SINGLE SIDED ANGLE COMPLETE. ABOVE CEILING DUCT - 48x14 air duct and 14x14 exaust duct rerouted down corridor C14-6 ok for sealing but not shown on approved plans. Need support spacing corrected. CONTINUE AT OWN RISK. SUPPLY MAINS FOR TB-1-08 IS OK FOR SUPPORT AND SEALING BUT DOES NOT MATCH PLAN - CONTINUE AT OWN RISK. ABOVE CEILING DUCT | MARKB | MARKB | | HD | P | 7194391 |
RK MECHANICAL, LLC | HSP | P | 11/23/2021 | Looked at damper framing for 50x20 damper on grid line x5.5 to the south - Need some drywall removed to inspect framing. Top framing plate interferes with annular space. Will need manufacturers instructions for 3-sided angle install. | MARKB | MARKB | | HSP | P | 7186874 |
RK MECHANICAL, LLC | HD | P | 11/11/2021 | ----ENGINEER WILL NEED TO ADDRESS DAMPER FRAMING FOR SUPPORT OVER ANY DOUBLE DOORS AS MANUFACTURER INSTRUCTIONS ONLY SHOW WALL SUPPORT FROM FLOOR---- ABOVE CEILING DUCT - 82X20 & 46X20 DUCT RUNNING NORTH TO SOUTH AT CORRIDOR C14-7A OK TO WRAP. DAMPERS - DAMPER FRAMING IN CORRIDOR C14-7A FOR 4 DAMPERS OK. | MARKB | MARKB | | HD | P | 7174390 |
RK MECHANICAL, LLC | HD | L | 11/10/2021 | CANCELLED AT CALL AHEAD - CONTRACTOR HAD TO LEAVE EARLY | MARKB | MARKB | | HD | L | 7172752 |
RK MECHANICAL, LLC | P= | C | 12/09/2022 | | JOHNS | JOHNS | | P= | C | 7605670 |
RK MECHANICAL, LLC | P= | P | 12/07/2022 | still need to remove gas from plbg scope (as previously noted), rest ok for splices made | JOHNS | JOHNS | | P= | P | 7602760 |
RK MECHANICAL, LLC | P= | P | 04/14/2022 | --JUST NEED to remove gas piping from plbg scope (as previously noted)
--STILL NEED revisions note on 10/29/21 and 11/24/21
rest ok for on site inspections | JOHNS | JOHNS | | P= | P | 7338173 |
RK MECHANICAL, LLC | PTO | P | 03/03/2022 | --PENDING NEED TO REVISE PLANS TO SHOW as built in field (due to field constraints) {as noted on 1st PTO inspection}
--NEED to remove med gas from plbg scope
rest ok for remainder | JOHNS | JOHNS | | PTO | P | 7288877 |
RK MECHANICAL, LLC | PTO | P | 01/12/2022 | --NEED to remove med gas from plbg scope
--NEED TO REVISE PLANS TO SHOW as built i field (due to field constraints)
ok for circut setter @1414A
ok for above ceiling water . vents only today
--STILL NEED waters ran to rooms 1426 and 1425 --STILL NEED flanges set @ rooms 1421 and 1420 | JOHNS | JOHNS | | PTO | P | 7236321 |
RK MECHANICAL, LLC | PTO | P | 01/06/2022 | --NEED to remove med gas from plbg scope
--NEED TO REVISE PLANS TO SHOW as built i field (due to field constraints)
ok for in wall dwv / h20 only @ hot tlt 1420 / 1421 only today. ****NOTE: hammer arrestors in wall right side of BOTH water closets****
--STILL NEED to verify circut setter @ from previous inspection @ room 1414 A area | JOHNS | JOHNS | | PTO | P | 7230370 |
RK MECHANICAL, LLC | PTO | P | 12/14/2021 | --NEED to remove med gas from scope, plbg does not look @ med gas
ok for over head waters and vent tie in @ room 1414A (from last inspection) @ corridor C 14 - 7 and room 1414 A MINUS CIRCUT SETTER in this area
ok to insulate
--STILL NEED remainder to include all revisions (x2) | JOHNS | JOHNS | | PTO | P | 7207824 |
RK MECHANICAL, LLC | PTO | P | 11/24/2021 | DWV for in wall and over head sink in room 1414: Need plans splice showing new vent tie in location and tie into 1-1/2" existing vent room 1414A / need to see final tie in / test ok. Domestic in wall only for sink in room 1414: okay to insulate. | DANR | DANR | | PTO | P | 7188377 |
RK MECHANICAL, LLC | PTO | P | 10/29/2021 | --NEED TO REVISE PLANS TO SHOW AS BUILT IN FIELD (due to in field constraints)
ok for under belly dwv piping only today
STILL NEED remainder of PTO | JOHNS | JOHNS | | PTO | P | 7159622 |
RK MECHANICAL, LLC | XMS | T | 12/06/2022 | PAID (REC#1919023): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7601259 |
RK MECHANICAL, LLC | XPS | P | 11/17/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 8 revisions: Adjusted sheets P-100 and P-201. | SHANEN | SHANEN | | XPS | P | 7586657 |
TURNER CONSTRUCTION COMPANY | XBS | T | 11/17/2022 | PAID (REC#1915722): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Structural notes for mechanical support. | SHELLEY | SHELLEY | | XBS | T | 7586464 |
RK MECHANICAL, LLC | XMS | T | 03/23/2022 | PAID (REC#1853304): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7312342 |
TURNER CONSTRUCTION COMPANY | XBS | T | 03/16/2022 | PAID (REC#1851698): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised wall types around future space and duct furring. | SHELLEY | SHELLEY | | XBS | T | 7304383 |
RK MECHANICAL, LLC | XMS | T | 02/07/2022 | PAID (REC#1847578): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7261039 |
RK ELECTRICAL, LLC | XES | T | 02/04/2022 | PAID (REC#1842610): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised E 201, 301, 503 | SHELBY | SHELBY | | XES | T | 7260841 |
TURNER CONSTRUCTION COMPANY | XBS | T | 02/04/2022 | PAID (REC#1841705): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Minor floor plan revisions | SHELLEY | SHELLEY | | XBS | T | 7260498 |
RK ELECTRICAL, LLC | XES | P | 12/08/2021 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Lighting as builts | SHELBY | SHELBY | | XES | P | 7202039 |
TURNER CONSTRUCTION COMPANY | XBS | T | 12/07/2021 | PAID (REC#1831548): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised RCP and restroom finish | SHELLEY | SHELLEY | | XBS | T | 7200532 |