SUPERIOR BUILDERS INC. | B= | C | 11/06/2023 | | ERAMIREZ | ERAMIREZ | | B= | C | 7910356 |
SUPERIOR BUILDERS INC. | BE | T | 11/06/2023 | PAID (REC#2005513): tco | JANE | JANE | | BE | T | 7909939 |
SUPERIOR BUILDERS INC. | BE | T | 09/25/2023 | PAID (REC#1991430): TCO | JANE | JANE | | BE | T | 7866232 |
SUPERIOR BUILDERS INC. | B= | P | 08/28/2023 | Temp CO: Pending Zoning and building finals ( Expires: 9/27/2023 12:00:00 AM) | RITA | RITA | | B= | P | 7838994 |
SUPERIOR BUILDERS INC. | B= | P | 07/27/2023 | Temp CO: Pending final inspections ( Expires: 8/26/2023 12:00:00 AM) | JACKIEP | JACKIEP | | B= | P | 7810607 |
SUPERIOR BUILDERS INC. | BSP | P | 07/27/2023 | Reviewed penetration and continuity requirements and applied to as built conditions / Training with EricR 7-25-23 | DOUGC | DOUGC | | BSP | P | 7809680 |
SUPERIOR BUILDERS INC. | BSP | P | 07/27/2023 | Engineer observation letter for SFRM on file. | ERAMIREZ | ERAMIREZ | | BSP | P | 7809630 |
SUPERIOR BUILDERS INC. | BFN | C | 07/27/2023 | All required documentation for addition and trash enclosure on file. | ERAMIREZ | ERAMIREZ | | BFN | C | 7809628 |
SUPERIOR BUILDERS INC. | BFT | C | 07/27/2023 | All required documentation for addition and trash enclosure on file. | ERAMIREZ | ERAMIREZ | | BFT | C | 7809626 |
SUPERIOR BUILDERS INC. | B= | P | 07/26/2023 | Building final OK pending other finals / -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Mechanical Final Inspection is not Completed yet, RIAL HEATING AND AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet, GARRETT PLUMBING L.L.C. Plumbing Final Inspection is not Completed yet. | ERAMIREZ | ERAMIREZ | | B= | P | 7809108 |
SUPERIOR BUILDERS INC. | BSP | P | 07/25/2023 | Provide joint firestop detail for 4th and 3rd floor around door opening. / | ERAMIREZ | ERAMIREZ | | BSP | P | 7807341 |
SUPERIOR BUILDERS INC. | BSP | P | 07/24/2023 | Training with Eric R Reviewed Accessible Elements / Final items in R-1 | PAULP | PAULP | | BSP | P | 7806762 |
SUPERIOR BUILDERS INC. | B= | P | 07/24/2023 | 3rd and 2nd floor rest of units okay. / Stair shaft need to address penetrations throughout. / Missing gasket at rear exit door in stairway. / Need to provide blind rail for underneath stairway due to vertical ceiling head height requirements. / Unit 115 window hardware does not meet the ANSI requirements. / Rest of 1st floor okay pending other rough inspections. / Still need 3rd party observation for all of foundation inspections.-- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Mechanical Final Inspection is not Completed yet, RIAL HEATING AND AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, ELEVATOR: OTIS ELEVATOR COMPANY Mechanical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet, GARRETT PLUMBING L.L.C. Plumbing Final Inspection is not Completed yet. | ERAMIREZ | ERAMIREZ | | B= | P | 7806753 |
SUPERIOR BUILDERS INC. | B= | R | 07/12/2023 | 407 - corrections OK LEVEL 3 -- 307 inspection only -- accessible unit OK LEVEL 2 -- 202 inspection only -- accessible unit OK NOTE: room smoke and CO detectors to be operable for next inspection. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Mechanical Final Inspection is not Completed yet, RIAL HEATING AND AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, ELEVATOR: OTIS ELEVATOR COMPANY Mechanical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet, GARRETT PLUMBING L.L.C. Plumbing Final Inspection is not Completed yet, Permit has unpaid trip fee, splice fee, or plancheck fee. | LONNYS | LONNYS | | B= | R | 7795811 |
SUPERIOR BUILDERS INC. | B= | R | 07/05/2023 | 4th floor
Unit 407 - Flush control to be on open side. Window lock exceeds maximum height of 48". Rest of 4th floor okay pending other final inspections. / Provide 3rd party observation for all foundation inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Mechanical Final Inspection is not Completed yet, DAVIS GAS SHOP INC Mechanical Final Inspection is not Completed yet, RIAL HEATING AND AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, ELEVATOR: OTIS ELEVATOR COMPANY Mechanical Final Inspection is not Completed yet, AMERICAN PLUMBING & HEATING INC. Plumbing Final Inspection is not Completed yet, GARRETT PLUMBING L.L.C. Plumbing Final Inspection is not Completed yet, Permit has unpaid trip fee, splice fee, or plancheck fee. | ERAMIREZ | ERAMIREZ | | B= | R | 7790213 |
SUPERIOR BUILDERS INC. | BSP | P | 06/27/2023 | 1th-4th above grid ceiling penetrations okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7783927 |
SUPERIOR BUILDERS INC. | BSP | P | 06/14/2023 | Elevator door 2nd layer gyp attachment at 1st, 2nd, 3rd and 4th floor okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7771942 |
SUPERIOR BUILDERS INC. | BSP | P | 06/13/2023 | 1st-4th floor elevator gyp base layer attachment okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7770323 |
SUPERIOR BUILDERS INC. | BSP | P | 06/12/2023 | 1-4th floor Observed door walls shaft liner around elevator door. | ERAMIREZ | ERAMIREZ | | BSP | P | 7769141 |
SUPERIOR BUILDERS INC. | BSP | P | 06/08/2023 | Reviewed shaft requirements at elevator door infill opening. | ERAMIREZ | ERAMIREZ | | BSP | P | 7766832 |
SUPERIOR BUILDERS INC. | BSP | R | 06/08/2023 | Engineer letter to be stamped by a licensed designer to be accepted. | ERAMIREZ | ERAMIREZ | | BSP | R | 7765985 |
SUPERIOR BUILDERS INC. | BSP | P | 05/15/2023 | 1st floor Commons area drop ceiling framing and penetrations okay pending other rough inspections. // | ERAMIREZ | ERAMIREZ | | BSP | P | 7744796 |
SUPERIOR BUILDERS INC. | BSP | P | 04/27/2023 | 2nd layer Gyp attachment at walls in electrical rooms and corridor stair walls 2nd, 3rd, 4th floor. | ERAMIREZ | ERAMIREZ | | BSP | P | 7729332 |
SUPERIOR BUILDERS INC. | BSP | P | 04/24/2023 | 1st layer Gyp attachment at walls in electrical rooms and corridor stair walls 2nd, 3rd, 4th floor. | ERAMIREZ | ERAMIREZ | | BSP | P | 7725322 |
SUPERIOR BUILDERS INC. | BSP | P | 04/21/2023 | engineer letter for fire stopping at 3" conduits in multi purpose room on file | LONNYS | LONNYS | | BSP | P | 7722993 |
SUPERIOR BUILDERS INC. | BSP | P | 04/20/2023 | 1ST FLOOR MULTI PURPOSE ROOMS, PANTRY , GUEST UNIT ABOVE BATHROOM DROP CEILING PENETRATIONS // still need to inspect roof drain fire stopping when ready in guest units / upload fire stop detail for penetrations in north multi purpose room - observed on site / rest of penetrations OK pending other required inspections PUBLIC BATHROOM GYP ATTACHMENT 112a , 112b, and exterior wall at bathroom corridor // gyp attachment OK - still need to inspect penetrations when ready | LONNYS | LONNYS | | BSP | P | 7722037 |
SUPERIOR BUILDERS INC. | BSP | P | 04/18/2023 | site visit with site rep to discuss penetration protection in multi purpose room and pantry to include steel tubing, PVC chase and gyp continuity around fire wrapped ducts to corridor | LONNYS | LONNYS | | BSP | P | 7719327 |
SUPERIOR BUILDERS INC. | BSP | P | 04/17/2023 | 1ST FLOOR CEILING AND WALL GYP ATTACHMENT IN MULTI PURPOSE ROOMS 1 AND 2, PANTRY / still need to inspect all penetrations - provide fire stop details for all penetrations / face layer attachment at floor/ceiling assembly OK per ESR - 1336 / wall gyp attachment OK per UL U356, and U305 | LONNYS | LONNYS | | BSP | P | 7718095 |
SUPERIOR BUILDERS INC. | BSP | P | 04/12/2023 | Room 006 2nd layer gyp okay at walls. | ERAMIREZ | ERAMIREZ | | BSP | P | 7714673 |
SUPERIOR BUILDERS INC. | BSP | P | 04/11/2023 | 1st floor RC channel okay at bathrooms 102A and 102B at south end of corridor
1st layer at ceiling for the following areas okay: 006B storage, 006 pantry, 007/008 meeting rooms, and 112a/112b bathrooms by front entry. | ERAMIREZ | ERAMIREZ | | BSP | P | 7713408 |
SUPERIOR BUILDERS INC. | BSP | P | 04/07/2023 | NOTE at 006 corridor to center corridor must be rated for 2 hour stair enclosure / WP 4136 RC2750 for South stairs okay all floors and ceiling, center stairs and ceiling 006 okay / | NATHAN | NATHAN | | BSP | P | 7710266 |
SUPERIOR BUILDERS INC. | BSP | P | 04/06/2023 | Corridor 006 ceiling 4th final layer okay | ERAMIREZ | ERAMIREZ | | BSP | P | 7709457 |
SUPERIOR BUILDERS INC. | BSP | P | 04/05/2023 | 1st floor
Units/fitness room - 2nd layer gyp at ceiling and walls okay.
Corridor 006 3rd layer gyp and hat channel okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7707992 |
SUPERIOR BUILDERS INC. | BSP | P | 04/04/2023 | 1st floor
2nd gyp layer at ceiling in corridor 006 okay per FC5750.
Gyp at units inspection - 2nd layer gyp at ceiling not ready per ESR-1336. / Unit/fitness walls okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7707014 |
SUPERIOR BUILDERS INC. | BSP | P | 04/03/2023 | 1st layer drywall install at ceiling of corridor 006 per FC 5750 okay | BOBF | BOBF | | BSP | P | 7705475 |
SUPERIOR BUILDERS INC. | BSP | R | 03/31/2023 | 1st floor north entrance
2 hour rated FC5750 ceiling to be continuous, currently interrupted by door framing. / | ERAMIREZ | ERAMIREZ | | BSP | R | 7704368 |
SUPERIOR BUILDERS INC. | BSP | P | 03/29/2023 | 1st floor
Observed corrections for gyp fastening at ceiling. All of 1st floor expect for meeting and public restrooms okay for 1st layer.
South stair tower - 1st layer at walls for entire stairway and last layer at ceiling for gyp fastening okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7701816 |
SUPERIOR BUILDERS INC. | BSP | P | 03/28/2023 | 1st floor
Frame okay pending other rough inspections at rooms 102A/B, 006/006B,003, and 112A/B | ERAMIREZ | ERAMIREZ | | BSP | P | 7700536 |
SUPERIOR BUILDERS INC. | BSP | P | 03/24/2023 | 1st floor
1st layer gyp at ceiling inspection only - The following units not okay 111, 112. 114, 116, 117 and public spaces. Rest of the units okay.
North steel beam wrap okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7697886 |
SUPERIOR BUILDERS INC. | BSP | P | 03/17/2023 | 1st floor
RC channel okay for units and fitness rooom | ERAMIREZ | ERAMIREZ | | BSP | P | 7691361 |
SUPERIOR BUILDERS INC. | BSP | P | 03/16/2023 | 1st floor.
Observed ledger connection for unit 101 per engineer detail on file. / Observed gyp at steel beam bottom side. | ERAMIREZ | ERAMIREZ | | BSP | P | 7689841 |
SUPERIOR BUILDERS INC. | BSP | P | 03/13/2023 | South stair tower.
Observed hat channel at ceiling per RC 2750 | ERAMIREZ | ERAMIREZ | | BSP | P | 7686031 |
SUPERIOR BUILDERS INC. | BSP | P | 03/09/2023 | 1st floor
Observed corrections for missing putty pads at electrical boxes. | ERAMIREZ | ERAMIREZ | | BSP | P | 7683061 |
SUPERIOR BUILDERS INC. | BSP | R | 03/09/2023 | Missing pages for details of roof drainage penetrations at rated walls. | ERAMIREZ | ERAMIREZ | | BSP | R | 7682269 |
SUPERIOR BUILDERS INC. | BSP | P | 03/08/2023 | 2nd level
Bathrooms ceiling above lid okay | ERAMIREZ | ERAMIREZ | | BSP | P | 7681668 |
SUPERIOR BUILDERS INC. | BSP | P | 03/07/2023 | 2nd floor Bathroom ceilings covered up prior to inspection.
South stair - 3rd layer okay at ceiling.
1st floor - Observed mineral wool for 45 degree penetrations in corridor. | ERAMIREZ | ERAMIREZ | | BSP | P | 7679330 |
SUPERIOR BUILDERS INC. | BSP | P | 03/06/2023 | 1st need all penetrations and back to back electric firestopped as well as 2 drain pipes in corridor not penetrating at 90 degree angle. 1st floor mineral wool penetrations units only per stamped design okay, Beam wrap at corridor only 1st layer and 2nd layer at mechanical room ceiling 1st at walls okay, | NATHAN | NATHAN | | BSP | P | 7678267 |
SUPERIOR BUILDERS INC. | BSP | P | 03/03/2023 | South stair tower - 2nd layer at ceiling okay. Walls not ready. | ERAMIREZ | ERAMIREZ | | BSP | P | 7676936 |
SUPERIOR BUILDERS INC. | BSP | P | 03/02/2023 | Level 1 2nd layer drywall at corridor ceiling okay. | NATHAN | NATHAN | | BSP | P | 7675602 |
SUPERIOR BUILDERS INC. | BSP | P | 03/02/2023 | Stamped letter for 101 stair to floor ledger and stair ceiling rating on file. | NATHAN | NATHAN | | BSP | P | 7674712 |
SUPERIOR BUILDERS INC. | BSP | P | 03/01/2023 | 1st framing corrections unit 101 ledger to stair wall remaining, / remaining rooms sleeping units corrected.
Stair rated ceiling consult on assembly 1st layer drywall at stair ceiling per R2 detail RC 2750
1 floor corridor 1st layer upper 4' walls and ceiling okay
| NATHAN | NATHAN | | BSP | P | 7673816 |
SUPERIOR BUILDERS INC. | BSP | P | 03/01/2023 | 3rd party letter from a licensed design professional on file for plumbing penetration repair through rated walls | ADAML | ADAML | | BSP | P | 7673226 |
SUPERIOR BUILDERS INC. | BFR | P | 02/27/2023 | 1st floor guest units only.
Unit 101 - Provide ledger detail for I joist at south wall to unit/stair wall. / Unit 111 - Over bored stud in bathroom. / Unit 115 - Bathroom missing grab bar blocking. / Unit 117 - North wall not done per detail 16/S3.2. / Rest of guest units okay. | ERAMIREZ | ERAMIREZ | | BFR | P | 7671637 |
SUPERIOR BUILDERS INC. | BSP | R | 02/27/2023 | South stair ceiling gyp inspection only. / Not ready.
1st floor mech wall/ceiling base layer okay. / Need to address 45 degree penetrations. | ERAMIREZ | ERAMIREZ | | BSP | R | 7671635 |
SUPERIOR BUILDERS INC. | BSP | P | 02/23/2023 | 1st floor RC at corridor per M502 system 8 and mechanical room per FC 5120 okay. | NATHAN | NATHAN | | BSP | P | 7669036 |
SUPERIOR BUILDERS INC. | BSP | P | 02/22/2023 | 2nd floor
Face layer gyp at ceiling for units okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7667760 |
SUPERIOR BUILDERS INC. | BSP | P | 02/21/2023 | 3rd floor
Soffit framing and penetrations in concealed locations okay | ERAMIREZ | ERAMIREZ | | BSP | P | 7666647 |
SUPERIOR BUILDERS INC. | BSP | P | 02/17/2023 | 2nd floor
Unit 211 - Membrane penetration from fire sprinkler line at demising wall. / Rest of unit walls okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7664556 |
SUPERIOR BUILDERS INC. | BSP | P | 02/14/2023 | 2nd floor
Gyp inspection only - Observed corrections for base layer at bathroom ceilings. | ERAMIREZ | ERAMIREZ | | BSP | P | 7661807 |
SUPERIOR BUILDERS INC. | BSP | P | 02/13/2023 | 3rd floor
Penetrations at bathroom pre-drops areas okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7660834 |
SUPERIOR BUILDERS INC. | BSP | R | 02/13/2023 | 2nd floor
Units 217-203 bathroom base layer gyp at ceilings not okay. / Units okay | ERAMIREZ | ERAMIREZ | | BSP | R | 7660823 |
SUPERIOR BUILDERS INC. | BSP | P | 02/07/2023 | 3rd floor
Unit bathroom 2nd gyp layer okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7655995 |
SUPERIOR BUILDERS INC. | BSP | P | 02/06/2023 | 2nd floor
Observed mineral wool for penetrations at ceiling per engineer letter on file. | ERAMIREZ | ERAMIREZ | | BSP | P | 7654656 |
SUPERIOR BUILDERS INC. | BSP | P | 02/03/2023 | 3rd floor
All units - 2nd layer at unit ceiling and 1st layer at bathroom ceiling per ESR-1336, 1st layer interior walls per U305 and exterior walls per U356 okay.
2nd floor -
All units - RC okay at ceiling and walls.
1st floor -
Framing at pre-rock areas okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7652678 |
SUPERIOR BUILDERS INC. | BSP | P | 02/01/2023 | 2nd floor - Observed BCI repair per engineer letter on file. | ERAMIREZ | ERAMIREZ | | BSP | P | 7650748 |
SUPERIOR BUILDERS INC. | BSP | P | 01/30/2023 | 3rd level... Mineral wool bathroom and roof drain membrane penetrations per stamped design. | NATHAN | NATHAN | | BSP | P | 7648521 |
SUPERIOR BUILDERS INC. | BSP | P | 01/27/2023 | 4th floor
Units 404 & 412 Observed membrane penetrations protection from roof drain lines per engineer detail on file. | ERAMIREZ | ERAMIREZ | | BSP | P | 7647346 |
SUPERIOR BUILDERS INC. | BSP | P | 01/27/2023 | Engineer BCI repair letter on file. | ERAMIREZ | ERAMIREZ | | BSP | P | 7646294 |
SUPERIOR BUILDERS INC. | BSP | P | 01/26/2023 | 4th floor
Observed soffit framing. | ERAMIREZ | ERAMIREZ | | BSP | P | 7645302 |
SUPERIOR BUILDERS INC. | BSP | P | 01/24/2023 | 3rd floor
Unit 304 - Need to address over sized penetration from drain lines at northeast corner of wall
All unit bathrooms ceiling - need to address membrane penetrations at 45 degrees
Rest of units ceiling okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7643443 |
SUPERIOR BUILDERS INC. | BSP | P | 01/23/2023 | 2nd floor Unit 202 - At south wall over notched top plate.
Unit 216 - Over bored BCI above bathroom ceiling.
Observed all corrections. / | ERAMIREZ | ERAMIREZ | | BSP | P | 7641862 |
SUPERIOR BUILDERS INC. | BSP | P | 01/19/2023 | 2nd floor Unit 202 - At south wall over bored stud and top plate. / Throughout room missing fireblocking. /
Unit 216 - Over bored BCI above bathroom ceiling.
Unit 209 - Over bored stud at bathroom.
4th floor - Penetrations at drop ceilings in bathrooms okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7639641 |
SUPERIOR BUILDERS INC. | BFR | R | 01/18/2023 | Field canceled prior to arrival via phone call by Dave. | ERAMIREZ | ERAMIREZ | | BFR | R | 7637960 |
SUPERIOR BUILDERS INC. | BSP | P | 01/17/2023 | 3rd floor - Observed RC channel at walls and ceilings. / Reviewed ESR-1336 for new floor/ceiling listing with Site rep Dave and gyp contractor. / | ERAMIREZ | ERAMIREZ | | BSP | P | 7637295 |
SUPERIOR BUILDERS INC. | BSP | R | 01/11/2023 | 3rd floor RC inspection - Not ready. Missing screws, splices and incomplete at concealed closets. / Reviewed M502 listing with site rep. | ERAMIREZ | ERAMIREZ | | BSP | R | 7632240 |
SUPERIOR BUILDERS INC. | BSP | P | 01/11/2023 | Engineer letter for RC spacing allowed at 16" in lieu of 12" per M502 on file. | ERAMIREZ | ERAMIREZ | | BSP | P | 7631429 |
SUPERIOR BUILDERS INC. | BSP | R | 01/09/2023 | 3rd floor - Units ceiling RC - Incorrect spacing per M502. Listing calls for 12" (currently 16") when insulation is resting on RC. 3rd floor - Observed insulation. 4th floor - Observed corrections for gyp at storage rooms.
| ERAMIREZ | ERAMIREZ | | BSP | R | 7629377 |
SUPERIOR BUILDERS INC. | BSP | P | 01/03/2023 | 4th floor drywall missing screws at both storage closet walls, remaining rooms and items corrected. 1-4 floor corridor ledger attachment completed. | NATHAN | NATHAN | | BSP | P | 7624084 |
SUPERIOR BUILDERS INC. | BSP | P | 12/28/2022 | 4th floor ceiling and wall drywall attachment 412 need drywall inside fireplace, storage, electric, and elevator lobby not done, 405 patch ceiling over wall for TV, 403 N party wall not screwed correctly. remaining rooms okay. 3rd floor dryer vent okay for mineral wool ceiling per design. | NATHAN | NATHAN | | BSP | P | 7621530 |
SUPERIOR BUILDERS INC. | BFR | R | 12/20/2022 | 3rd framing corrections Firestop and items in 309, 312, 315, 316 corrected, frame okay with completed required inspections.
4 th walls and lid drywall not attached at walls per U305 | NATHAN | NATHAN | | BFR | R | 7617048 |
SUPERIOR BUILDERS INC. | BFR | P | 12/16/2022 | 3rd floor. Pending other rough inspections.
The following units incomplete fireblocking; 309/312/315/316
Incomplete roll blocking in unit 309. | ERAMIREZ | ERAMIREZ | | BFR | P | 7614181 |
SUPERIOR BUILDERS INC. | BSP | P | 12/15/2022 | 4th floor units only - The following units not ready; 402/412/415/416/417. / Observed base layer at ceiling at all other units. | ERAMIREZ | ERAMIREZ | | BSP | P | 7612587 |
SUPERIOR BUILDERS INC. | BIN | P | 12/08/2022 | 4th floor - Observed insulation at walls and ceiling. | ERAMIREZ | ERAMIREZ | | BIN | P | 7605528 |
SUPERIOR BUILDERS INC. | BFR | P | 11/30/2022 | 4th floor frame okay pending other rough inspections | ERAMIREZ | ERAMIREZ | | BFR | P | 7596705 |
SUPERIOR BUILDERS INC. | BSP | P | 11/28/2022 | Reviewed rated duct wrap to end at roof decking. | ERAMIREZ | ERAMIREZ | | BSP | P | 7594041 |
SUPERIOR BUILDERS INC. | BFR | P | 11/18/2022 | Reviewed EJ for duct chase protection at 4th floor. | ERAMIREZ | ERAMIREZ | | BFR | P | 7587867 |
SUPERIOR BUILDERS INC. | BSP | P | 11/16/2022 | Elevator 2nd layer entire building okay per GA WP 4136. | ERAMIREZ | ERAMIREZ | | BSP | P | 7585518 |
SUPERIOR BUILDERS INC. | BSP | P | 11/11/2022 | EJ for protection at concealed chases on file. | ERAMIREZ | ERAMIREZ | | BSP | P | 7580205 |
SUPERIOR BUILDERS INC. | BSP | P | 11/10/2022 | Elevator shaft ceiling 3rd layer and final okay.
Elevator common walls to corridor base layer okay per GA WP 4136. | ERAMIREZ | ERAMIREZ | | BSP | P | 7579368 |
SUPERIOR BUILDERS INC. | BSP | P | 11/08/2022 | Observed RC channel at elevator ceiling. | ERAMIREZ | ERAMIREZ | | BSP | P | 7576977 |
SUPERIOR BUILDERS INC. | BSP | P | 11/04/2022 | Elevator shaft ceiling - Observed base and 2nd layer gyp per GA RC 2750. | ERAMIREZ | ERAMIREZ | | BSP | P | 7573280 |
SUPERIOR BUILDERS INC. | BSP | P | 10/28/2022 | Reviewed penetrations at concealed soffit for MEPS at ceiling. | ERAMIREZ | ERAMIREZ | | BSP | P | 7566714 |
SUPERIOR BUILDERS INC. | BSP | P | 10/27/2022 | 4th floor corridor ceiling okay.
4th floor elevator shaft base and face layer okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7565283 |
SUPERIOR BUILDERS INC. | BSP | P | 10/26/2022 | 3rd floor elevator shaft - base and face layer okay
4th floor corridor ceiling - Face layer fastening exceeds spacing of 12" per IBC table 721.1(3)21-1.1 (currently 24") | ERAMIREZ | ERAMIREZ | | BSP | P | 7562719 |
SUPERIOR BUILDERS INC. | BSP | P | 10/25/2022 | 2nd floor - Observed base and face layer gyp at elevator shaft. | ERAMIREZ | ERAMIREZ | | BSP | P | 7561193 |
SUPERIOR BUILDERS INC. | BSP | P | 10/24/2022 | 4th floor corridor - Base layer okay.
Elevator shaft base and 2nd layer okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7559910 |
SUPERIOR BUILDERS INC. | BSP | P | 10/21/2022 | 4th floor corridor ceiling Fastening spacing of 28" exceeds maximum of 24" per IBC table 721.1(3) 21-1.1 in plans.
Storage wall 4th, 3rd & 2nd floor okay per U305 (7"o.c)
Elevator shaft 1st floor - 1st and 2nd okay per GA WP 4136 | ERAMIREZ | ERAMIREZ | | BSP | P | 7558316 |
SUPERIOR BUILDERS INC. | BSP | R | 10/19/2022 | 4th corridor first layer not ready , Stair and elevator drywall not attached per listing and elevator drywall discussed inspection sequence inside shaft due to scaffolding. | NATHAN | NATHAN | | BSP | R | 7555681 |
SUPERIOR BUILDERS INC. | BSP | P | 10/10/2022 | 4th floor Corridor ceiling - Incorrect gyp. Type C only allowed per P554 (currently type X).
North fire barrier face layer okay per GA WP 7265. | ERAMIREZ | ERAMIREZ | | BSP | P | 7544930 |
SUPERIOR BUILDERS INC. | BSP | P | 10/05/2022 | 4th floor corridor ceiling- Observed RC channel and insulation.
North stair tower - Observed base layer per GA WP 7265. | ERAMIREZ | ERAMIREZ | | BSP | P | 7540200 |
SUPERIOR BUILDERS INC. | BSP | P | 09/22/2022 | Observed gyp fastening and ledger connection at corridor abuting elevator shaft on 2nd and 3rd floor. | ERAMIREZ | ERAMIREZ | | BSP | P | 7527155 |
SUPERIOR BUILDERS INC. | BSP | P | 09/07/2022 | Observed 2 hour fire separation wall per GA WP 7265. | ERAMIREZ | ERAMIREZ | | BSP | P | 7509306 |
SUPERIOR BUILDERS INC. | BSP | P | 09/02/2022 | Reviewed new listing at shaft wall per GA WP 7265 and required inspections with site rep. | ERAMIREZ | ERAMIREZ | | BSP | P | 7505220 |
SUPERIOR BUILDERS INC. | BSP | P | 09/02/2022 | Engineer letter for new listing (GA WP 7265) of shaft wall on file. Still need to splice plans to reflect change of listing. | ERAMIREZ | ERAMIREZ | | BSP | P | 7505039 |
SUPERIOR BUILDERS INC. | BFR | P | 09/01/2022 | Observed parapet framing at roof. | ERAMIREZ | ERAMIREZ | | BFR | P | 7504666 |
SUPERIOR BUILDERS INC. | BSP | R | 08/31/2022 | Fire barrier shaft between new addition and existing building. Incorrect gyp material per V455. Listing only allows for American gyp, currently USG. | ERAMIREZ | ERAMIREZ | | BSP | R | 7501890 |
SUPERIOR BUILDERS INC. | BIN | P | 08/25/2022 | Observed insulation at pre-rock chase areas in units. / 2-3rd floor observed RC at corridor. /
| ERAMIREZ | ERAMIREZ | | BIN | P | 7496443 |
SUPERIOR BUILDERS INC. | BSP | P | 08/25/2022 | 3rd party observation report for bolting structural connections and 4th floor truss blocking on file / | ERAMIREZ | ERAMIREZ | | BSP | P | 7495082 |
SUPERIOR BUILDERS INC. | BSP | C | 08/16/2022 | Observed corrections for CS16 straps for 1st and 4th floor. / | ERAMIREZ | ERAMIREZ | | BSP | C | 7485044 |
SUPERIOR BUILDERS INC. | BE | L | 08/01/2022 | Renewed for No Fee at 8/1/2022 9:00:28 AM | JANE | JANE | | BE | L | 7466008 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | P | 06/30/2022 | 1st Floor - All HDU4 hold downs and Titans/ Anchor bolts OK | ADAML | ADAML | | BSP | P | 7431581 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | P | 06/29/2022 | Interior shear inspection for shear walls in corridors and units as well as CS16 straps - Corridor lid inspection
4th Floor - Unit 402 missing SW3 nailing / Corridor lid OK for pre rock per GA FC5120 pending letter for TB blocking / CS16 straps OK in Units ONLY
3rd Floor - Shear nailing OK - Missing nailing in LUS in corridor above Unit 302 / All other corridor lid framing OK per GA FC5120 / CS16 Straps OK in Units ONLY
2nd Floor - Shear nailing OK - Missing nailing in LUS in corridor above Unit 214 / Missing last joist in corridor on North wall / All other corridor lid framing OK per GA FC5120 / CS16 straps OK in Units ONLY
1st Floor - Shear nailing OK / Missing nailing in LUS in corridor above Meeting Room , Above Unit 114 , Above Unit 116 , Missing last joist above corridor at existing entry North side / All other corridor lid framing OK except at elevator shaft around steel beam, structurals are going to change at the ledger so this must remain uncovered / CS16 straps OK in Units ONLY
Still need to see hold downs and corridor CS16s | ADAML | ADAML | | BSP | P | 7429900 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | P | 06/28/2022 | Roof sheathing OK
4th Floor - Truss inspection - All roof trusses OK - Missing hangers corrected on site / Provide letter for blocking in corridor that attaches the TB trusses together in the middle
South elevation exterior shear nailing inspection / Several sheets are going to be replaced due to damage so those will need to be re-inspected / Damaged sheets are on the lower right corner of 1st floor and there are approximately 10 sheets / All remaining sheets OK | ADAML | ADAML | | BSP | P | 7427967 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 06/27/2022 | PARTIAL FRAME - Stair enclosure framing OK on all floors per new listing GA WP4136 / Viewed architects letter on site and a splice is going to follow changing to this listing from a UL V455 / Discussed trusses and penetration protection in rated walls | ADAML | ADAML | | BFR | P | 7426579 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | P | 06/16/2022 | Site consultation with Dave, reviewed the following items: required inspections for stair ledger, insulation, and rated assemblies. / | ERAMIREZ | ERAMIREZ | | BSP | P | 7413870 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFD | P | 06/15/2022 | Authorized 3rd party engineer inspection with all observation paperwork to follow / | ERAMIREZ | ERAMIREZ | | BFD | P | 7411691 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFN | P | 06/15/2022 | Authorized 3rd party engineer inspection with all observation paperwork to follow / | ERAMIREZ | ERAMIREZ | | BFN | P | 7411690 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFT | P | 06/15/2022 | Authorized 3rd party engineer inspection with all observation paperwork to follow / | ERAMIREZ | ERAMIREZ | | BFT | P | 7411688 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BE | P | 06/09/2022 | | JANE | JANE | | BE | P | 7405198 |
VAN GIESON AND COMPANY, INC. | BFI | C | 01/11/2022 | R10 installed on all remaining walls | ADAML | ADAML | | BFI | C | 7234863 |
VAN GIESON AND COMPANY, INC. | BFI | P | 01/06/2022 | R10 installed on East wall / Discussed inspection processes to include 3rd party observations, C402.5, Trusses pending and rated assemblies | ADAML | ADAML | | BFI | P | 7230678 |
EL PASO ELECTRIC, LLC. | E= | C | 08/08/2023 | | JOHNN | JOHNN | | E= | C | 7819745 |
EL PASO ELECTRIC, LLC. | E= | P | 07/28/2023 | still need plans spliced for series rating / other corrections made / | BRIAN | BRIAN | | E= | P | 7811581 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 07/12/2023 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 7796096 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 07/12/2023 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | ER | C | 7796095 |
EL PASO ELECTRIC, LLC. | E= | P | 07/12/2023 | electric room; strap mc on ceiling, label inside gear ,fed from main service outside/ label AIC and date on service gear outside/ waiting on previous AIC for small sub panels or series rating/ Need splice: 1500 amp cb to old service? al conductors not copper, old service feeders, no EGC, rebonded inside old service/ new addition feeders has 6-600 al installed, | JOHNN | JOHNN | | E= | P | 7796083 |
EL PASO ELECTRIC, LLC. | E= | P | 07/11/2023 | 1st floor: grid,walls, pantry, dining room, south bath rooms, / all outside lighting | JOHNN | JOHNN | | E= | P | 7794816 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 07/10/2023 | FIRE ALARM INSPECTION: 2nd,3rd,4th floors,ok | JOHNN | JOHNN | | ER | P | 7793411 |
EL PASO ELECTRIC, LLC. | E= | P | 07/10/2023 | 101,111,211/ fitness room/ | JOHNN | JOHNN | | E= | P | 7793407 |
EL PASO ELECTRIC, LLC. | E= | P | 07/06/2023 | label AIC and date calculated on all panels/ check panels for correct AIC cb's/ except for aic labels and cb's all of 3rd,4th floors complete/ 201,ok/ 2nd floor electric rm ok/ notes: minimum AIC is 11,239. | JOHNN | JOHNN | | E= | P | 7790720 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 07/05/2023 | FIRE ALARM INSPECTION: 2nd floor corridor ok/ 1st floor corridor grid not ready, | JOHNN | JOHNN | | ER | P | 7789644 |
EL PASO ELECTRIC, LLC. | E= | P | 07/05/2023 | 209,302,ok/ corridor 1st,2nd floor,ok, 1st FLOOR GRID FA not ready, DO NOT LAY TILE/ | JOHNN | JOHNN | | E= | P | 7789642 |
EL PASO ELECTRIC, LLC. | E= | P | 07/03/2023 | rooms 309--311--103--105--ok / north bathrooms --ok /. elevator pit needs gfci on sump pump recept / | BRIAN | BRIAN | | E= | P | 7789182 |
EL PASO ELECTRIC, LLC. | E= | P | 06/30/2023 | 107,113,114,115. | JOHNN | JOHNN | | E= | P | 7787986 |
EL PASO ELECTRIC, LLC. | E= | P | 06/29/2023 | 202,312,316 | JOHNN | JOHNN | | E= | P | 7786607 |
EL PASO ELECTRIC, LLC. | E= | P | 06/28/2023 | 4th floor elevator lobby grid/ 308,212,216. | JOHNN | JOHNN | | E= | P | 7784658 |
EL PASO ELECTRIC, LLC. | E= | P | 06/27/2023 | 301, 205,215,217, 2nd floor storage room. | JOHNN | JOHNN | | E= | P | 7783029 |
EL PASO ELECTRIC, LLC. | ER | R | 06/26/2023 | 3rd floor corridor above ceiling ok / but need fire alarm called in / | BRIAN | BRIAN | | ER | R | 7782463 |
EL PASO ELECTRIC, LLC. | E= | R | 06/26/2023 | elect --ok on 4th floor corridor except elevator lobby above ceiling --ok / units 307 and 407--ok power for mirror is in j box / | BRIAN | BRIAN | | E= | R | 7782461 |
EL PASO ELECTRIC, LLC. | EUG | P | 06/23/2023 | 3/4" pvc on east side of building for ballard lights | CRAIG | CRAIG | | EUG | P | 7781217 |
EL PASO ELECTRIC, LLC. | E= | P | 06/23/2023 | units 214, 213, 210, 208, 207, 206, 204, 203 ok | CRAIG | CRAIG | | E= | P | 7781204 |
EL PASO ELECTRIC, LLC. | E= | P | 06/22/2023 | all roof top,ok/ RTU-1,26/30 min/max amps, CU-4: 24/40 min/max/ CU-1,2: 14/25/ CHECK cb's later | JOHNN | JOHNN | | E= | P | 7779481 |
EL PASO ELECTRIC, LLC. | E= | P | 06/15/2023 | 4th floor: 401, all units have cb lockouts where needed on 4th floor/ 3rd floor: 305,310,313,314,315,317 and North storage rm. | JOHNN | JOHNN | | E= | P | 7772879 |
EL PASO ELECTRIC, LLC. | E= | P | 06/14/2023 | 4th floor:405,409,412, 412 panel,ok, need cb lockout on cooktops/ 3rd floor: 303,304,306 | JOHNN | JOHNN | | E= | P | 7771317 |
EL PASO ELECTRIC, LLC. | E= | P | 06/13/2023 | 4th floor: 403,411,413,416/ ok/ 411,416 need cb lockout for cook top/ panels,ok/storage room at North end ,ok/ South stairwell,ok/ wall heater has built in disco/ | JOHNN | JOHNN | | E= | P | 7770326 |
EL PASO ELECTRIC, LLC. | E= | P | 06/12/2023 | need specs on cb size of Ptac's/ 402: need cb lockout for cooktop/ looked at: 402,404,406,408,410,414,415,417, afci's,ok | JOHNN | JOHNN | | E= | P | 7769003 |
EL PASO ELECTRIC, LLC. | ES | P | 05/26/2023 | Commercial Service: 3000 amp,4w, no action needed/ still need to pull new feeders to addition/ rods,ok, neutral bond ok, in cabinet. | JOHNN | JOHNN | | ES | P | 7755849 |
EL PASO ELECTRIC, LLC. | ESPR | P | 05/23/2023 | Commercial Service: pre release,ok, | JOHNN | JOHNN | | ESPR | P | 7752028 |
EL PASO ELECTRIC, LLC. | ER | P | 05/16/2023 | 1st floor, South bath room, hard lids. | JOHNN | JOHNN | | ER | P | 7745464 |
EL PASO ELECTRIC, LLC. | ER | P | 05/11/2023 | 1st floor: 2 North guest bath rms, hard lids/ 4th floor corridor grid,ok | JOHNN | JOHNN | | ER | P | 7741892 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 05/11/2023 | FIRE ALARM INSPECTION: 4th floor corridor grid. | JOHNN | JOHNN | | ER | P | 7741886 |
EL PASO ELECTRIC, LLC. | ER | P | 04/20/2023 | 1st floor bath rn hard lids. | JOHNN | JOHNN | | ER | P | 7722022 |
EL PASO ELECTRIC, LLC. | ER | P | 03/15/2023 | Walls are now complete / 3rd floor electric room wall / 3rd floor laundry room wall / 2nd floor electric room wall | BRETC | BRETC | | ER | P | 7688111 |
EL PASO ELECTRIC, LLC. | EUG | P | 03/10/2023 | rear of building/ 6-4" pvc, feeders from new service under parking lot to new South service. | JOHNN | JOHNN | | EUG | P | 7683902 |
EL PASO ELECTRIC, LLC. | ER | P | 03/06/2023 | 2nd floor: all hard lids,ok, ALL of 2nd floor rough complete/ | JOHNN | JOHNN | | ER | P | 7677870 |
EL PASO ELECTRIC, LLC. | ER | P | 02/21/2023 | 3rd floor: bath room hard lids, whole floor,ok | JOHNN | JOHNN | | ER | P | 7665962 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 02/17/2023 | FIRE ALARM INSPECTION: FA in suites 101, 103, 105, 107, 111, 113, 115, 117, 114, 116 ok / | MIGUEL | MIGUEL | | ER | P | 7664704 |
EL PASO ELECTRIC, LLC. | ER | P | 02/17/2023 | install floor boxes in meeting room per NEC 210.71 (B)(2) / walls in meeting room, restrooms x4 , work out room, pantry , and back room ok , Electrical wall rough ok, FA not complete,-------- do not close walls-------------- / | MIGUEL | MIGUEL | | ER | P | 7664702 |
EL PASO ELECTRIC, LLC. | ER | P | 02/08/2023 | 101,103,105,107,111,113,115,117,114,116/ pre rock in bath rooms ,ok/ sub panels ok in 101,11,116/ walls,lid/ Electrical Rough ok, FA not complete ---------------do not sheetrock--------------- / | JOHNN | JOHNN | | ER | P | 7656585 |
EL PASO ELECTRIC, LLC. | ER | P | 01/13/2023 | 4th floor: all bath room hard lids, | JOHNN | JOHNN | | ER | P | 7634417 |
EL PASO ELECTRIC, LLC. | ER | P | 01/09/2023 | 2nd floor, all dwelling units,ok/ 2nd floor FA ok in dwelling units, | JOHNN | JOHNN | | ER | P | 7629069 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 12/30/2022 | FIRE ALARM INSPECTION: south stair well all floors, 2nd floor, all units, all corridors will need inspection later. | JOHNN | JOHNN | | ER | P | 7623014 |
EL PASO ELECTRIC, LLC. | ER | P | 12/22/2022 | South stairwell: lights, outlets/ FA, all floors, | JOHNN | JOHNN | | ER | P | 7619152 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 12/19/2022 | FIRE ALARM INSPECTION: All 3rd floor units FA rough - Ok | BRETC | BRETC | | ER | P | 7615467 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 12/13/2022 | FIRE ALARM INSPECTION: 4th floor units only - Ok | BRETC | BRETC | | ER | P | 7610101 |
EL PASO ELECTRIC, LLC. | ER | P | 12/12/2022 | Units 301 & 309 plus panels / 4th floor electric room walls and ceiling | BRETC | BRETC | | ER | P | 7608298 |
EL PASO ELECTRIC, LLC. | ER | P | 12/02/2022 | 4th floor room 407 - Rough ok - need drop ceilings / 4th floor panels in suites 401, 402, 409, 411, 412 & 416 all 2/0al / #10NM to dryer | BRETC | BRETC | | ER | P | 7598865 |
EL PASO ELECTRIC, LLC. | ER | P | 11/28/2022 | No FA rough in any areas of 3rd floor yet - NO NOT SHEET ROCK / 3rd floor all outside walls - Ok / No Panels ready / Need to see drop ceilings in all units / Corridors - Ok / Units - 302, 303, 304, 305, 306, 307 ADA, 308, 310, 311 313, 314, 315, 316 & 317 - Still need FA and units 301 & 309 | BRETC | BRETC | | ER | P | 7593528 |
EL PASO ELECTRIC, LLC. | EUG | P | 11/07/2022 | feeder pipes at rear of building completed to transformer. | JOHNN | JOHNN | | EUG | P | 7574225 |
EL PASO ELECTRIC, LLC. | ER | P | 11/04/2022 | corrections from 11/2 made: rms 401,406,ok/ 4th floor: all lids,ok/ hallway will need grid later/ did not look at panels today. | JOHNN | JOHNN | | ER | P | 7573090 |
EL PASO ELECTRIC, LLC. | EUG | P | 11/04/2022 | rear of building 6-4" pvc approx 20 ' out from building/ ok for pics for rest of run to transformer/ | JOHNN | JOHNN | | EUG | P | 7573081 |
EL PASO ELECTRIC, LLC. | ER | P | 11/04/2022 | 4th all lids/walls ok, will need hallway grid later/ | JOHNN | JOHNN | | ER | P | 7573075 |
EL PASO ELECTRIC, LLC. | ER | P | 11/02/2022 | Need panel inspections 401 & 402 / Need all drop ceiling rough 401- 406 / 401 move receptacle 36" from shower / 406 staple NM 8" from j-boxes / Rooms 401, 402, 403, 404 & 406 | BRETC | BRETC | | ER | P | 7570878 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/02/2022 | FIRE ALARM INSPECTION: Rooms 401, 402, 403, 404, 405 & 406 | BRETC | BRETC | | ER | P | 7570868 |
EL PASO ELECTRIC, LLC. | EUG | P | 10/26/2022 | 3 pole light trenches west side of building / Pics sent to phone | BRETC | BRETC | | EUG | P | 7563960 |
EL PASO ELECTRIC, LLC. | EUG | P | 10/21/2022 | 5 east pole lights and trenches - Ok | BRETC | BRETC | | EUG | P | 7559014 |
EL PASO ELECTRIC, LLC. | EUG | P | 10/14/2022 | correction made: bollards next to side walk out front. | JOHNN | JOHNN | | EUG | P | 7550755 |
EL PASO ELECTRIC, LLC. | EUG | R | 10/13/2022 | trench next to side walk in front near porticasher/ trench needs to be 18" to top of pvc/ | JOHNN | JOHNN | | EUG | R | 7549403 |
EL PASO ELECTRIC, LLC. | ER | R | 10/11/2022 | FA inspections need to catch up with electrical before we proceed/ no site visit. | JOHNN | JOHNN | | ER | R | 7546355 |
EL PASO ELECTRIC, LLC. | ER | P | 09/27/2022 | no more electrical inspections until FA permit and inspections/ all previous corrections made/ stll need sub panel feeders landed/ looked at 405,408,409,410 and corridor/ pre rock lids,ok/ | JOHNN | JOHNN | | ER | P | 7531550 |
EL PASO ELECTRIC, LLC. | ER | P | 09/16/2022 | 4th floor: units with permanent cooking provisions need a 20 amp,120v laundry circuit/ 412: strap SER in ceiling above rafters/ 411,412,413,414,416: need SER in sub panels and strapped/ prerock lids,ok/ walls,ok except at panels, | JOHNN | JOHNN | | ER | P | 7520034 |
EL PASO ELECTRIC, LLC. | ER | P | 09/08/2022 | NEED FA PERMIT/ consult with EC, 417,415,walls,lids,ok bath room lid pre rock/ Discussed accessibility requirements with contractor / | JOHNN | JOHNN | | ER | P | 7509872 |
SURMOUNT ELECTRICAL CONTRACTORS INC. | ESL | P | 03/02/2022 | all interior slab pvc,ok | JOHNN | JOHNN | | ESL | P | 7287705 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 08/15/2023 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 7826501 |
OTIS ELEVATOR COMPANY | HE= | C | 07/25/2023 | ELEVATOR FINAL COMPLETE. OK FOR PUBLIC USE. | DUSTINS | DUSTINS | | HE= | C | 7808089 |
OTIS ELEVATOR COMPANY | HE= | R | 07/25/2023 | ELEVATOR FINAL PENDING: NEED OK FROM BUILDING INSPECTOR FOR SHAFT INTERIOR FIRE RATING. PROVIDE PDF COPY OF CSFD FIRE FINAL FOR ELEVATOR RELATED DEVICES. NO PUBLIC USE PERMITTED. | DUSTINS | DUSTINS | | HE= | R | 7807193 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 07/19/2023 | FINAL PENDING - Provide test and balance report. PICTURES OF DAMPER/EQUIPMENT LABELS - SEE IMAGES | MARKB | MARKB | | H= | P | 7801811 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 07/18/2023 | ELEVATOR LOUVER AND THERMOSTAT COMPLETE. ELEVATOR INSPECTOR WILL CONFIRM INTERLOCK. - SEE IMAGES. Still need inspection items from 7/10/23 inspection notes. | MARKB | MARKB | | H= | P | 7800470 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 07/12/2023 | CALLED MECHANICAL CONTRACTOR - WILL NEED TO VERIFY MOTORIZED LOUVER, THERMOSTAT AND INTERLOCK WITH FAN IN TOP OF ELEVATOR SHAFT. | MARKB | MARKB | | HSP | P | 7796175 |
OTIS ELEVATOR COMPANY | HE= | R | 07/12/2023 | (ELEVATOR #3) - 1) SUMP PUMP CHECK VALVE IS LEAKING. 2) SUMP PUMP COVER NEEDS TO BE SLOTTED TO BE REMOVABLE WITHOUT DISASSEMBLING DISCHARGE PIPING. 3) CUT BOLTS PROTRUDING FROM PIT FLOOR FLUSH. 4) NEED THERMOSTAT LOCATED IN TOP OF SHAFT CONTROLLING MOTORIZED DAMPER AND EXHAUST FAN. 5) MOTORIZED DAMPER IS REQUIRED TO FAIL CLOSE AND POWER DISCONNECTED TO EXHAUST FAN AND MOTORIZED DAMPER UPON ANY ELEVATOR FIRE ALARM DEVICE. OPERATION NEEDS TO BE VERIFIED ONSITE. 6) NEED TO PROVIDE FIRE ALARM DETECTION AT TOP OF SHAFT MACHINERY SPACE AND IN MOTOR CONTROLLER CABINET. DEVICES ARE REQUIRED TO RECALL ELEVATOR TO DESIGNATED LEVEL W/ FLASHING HAT INSIDE ELEVATOR CAR. 7) NEED HARD COPY OF OTIS DOOR LOCK FAULT WRITTEN CHECKOUT PROCEDURE ONSITE WITH MCP. 8) NEED OTIS ACCEPTANCE TAG ON CONTROLLER DOOR. 9) NEED HARD COPIES OF LIFTINSTITUUT CERTIFICATES FOR GOVERNOR AND CAR APRON ONSITE WITH MCP. 10) NEED STICKER AT TOP LANDING ELEVATOR TEST AND INSPECTION PANEL WITH THE LANGUAGE "MCP LOCATED ON CAR TOP". 11) TRIM CARPET AT ENTRANCE LANDING SILLS. 12) NEED CSFD FIRE FINAL FOR ALL ELEVATOR DEVICES. 13) NEED OK FROM BUILDING INSPECTOR FOR SHAFT INTERIOR FIRE RATING........ NO PUBLIC USE PERMITTED. | ROBERTV | ROBERTV | | HE= | R | 7797603 |
DAVIS GAS SHOP INC | H= | C | 07/10/2023 | FINAL CONNECTIONS COMPLETE. | MARKB | MARKB | | H= | C | 7793597 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 07/10/2023 | FINAL PENDING - Label fire dampers. Label furnaces. Provide test and balance report. ROOF FINAL OK. 1ST, 2ND, 3RD & 4TH FLOOR FINALS OK. ERV IN 209 COMPLETE. DRYER BOOSTER IN 116 COMPLETE. | MARKB | MARKB | | H= | P | 7793596 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 06/09/2023 | BY FINAL: CONTRACTOR TO CLAIM THE WATER HEATER VENTS (3). WATER HEATER EXHAUST VENT CORRECTION MADE (CORRECT MATERIAL INSTALLED). | BILLS | BILLS | | HD | P | 7768425 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | R | 06/06/2023 | WATER HEATER VENTING - The water heater manufacturer instruction do not allow the use of pvc cell core piping for venting water heaters. Need to replace all three vents with pvc ( ASTM D 2665) pipe per manufacturer instructions. | MARKB | MARKB | | HV | R | 7764096 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/15/2023 | 1ST FLOOR: DUCT BELOW RATED CEILING IN SOFFIT TO SLOT BOXES AND RETURN AIR OK TO COVER - will need access doors for volume dampers. SUPPLY DUCT AND EXHAUST FANS COMPLETE IN COMMON BATHROOMS ABOVE DROP CEILING. OUTSIDE AIR DUCT AND BACK-DRAFT DAMPERS COMPLETE TO ALL 3 FURNACES OK TO WRAP. ACCESS DOORS FOR FOR FIRE DAMPERS COMPLETE. No grills or diffusers this inspection. | MARKB | MARKB | | HD | P | 7744466 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | C | 05/15/2023 | 1ST FLOOR: 3 FURNACE VENTS COMPLETE | MARKB | MARKB | | HV | C | 7744456 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/03/2023 | 1ST FLOOR: ABOVE CEILING DUCT - SUPPLY/RETURN/OUTSIDE AIR DUCT MAINS/BRANCHES FOR F-4 OK TO WRAP. OUTSIDE AIR DUCT FOR F-1 & F-2 OK TO WRAP. Still need back draft dampers in outside air ducts and fire damper access doors installed. | MARKB | MARKB | | HD | P | 7734779 |
DAVIS GAS SHOP INC | HI+ | C | 04/21/2023 | 10 PSI PRESSURE TEST OK FOR 2 RELOCATED FURNACES PER PLAN SPLICE. | MARKB | MARKB | | HI+ | C | 7724045 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/20/2023 | 1ST FLOOR: BATH FAN AND DUCT CONNECTION IN DROP LIDS COMPLETE FOR UNITS 101, 103, 105, 107, 111, 113, 115, 117, 116 & 114. | MARKB | MARKB | | HD | P | 7722447 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/10/2023 | GREASE DUCT INSULATION INSTALLED PER ENGINEERED DESIGN THROUGH RATED FLOOR/CEILING FROM 1ST FLOOR TO SECOND FLOOR COMPLETE. | MARKB | MARKB | | HD | P | 7711861 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/05/2023 | 1ST FLOOR: FIRE DAMPER FRAMING AND DRYWALL WRAP FOR RESIZED DAMPER BETWEEN MECH ROOM AND UNIT 107 OK. SUPPLY/RETURN DUCT IN MECH ROOM FOR F-1 & 2 OK TO WRAP. RETURN DUCT DOWN CORRIDOR FOR F-4 IS SEALED AND SUPPORTED - Contractor is using other than approved plan - CONTINUE AT OWN RISK. FIRE DAMPER AND DUCT COMPLETE INTO NORTH EXIT PASSAGEWAY. | MARKB | MARKB | | HD | P | 7708226 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/28/2023 | ***CONTRACTOR IS WORKING FROM PLANS NOT STAMPED BY PPRBD. CONTRACTOR IS PROCEEDING AT OWN CAUTION*** SHAFT DUCT WRAP FROM ROOF TO 3RD FLOOR DAMPERS AT STORAGE ROOMS #SO41 AND #SO31 INSTALLED AS PER ENGINEERS PLANS EXCEPT FOR THE "3-C" SEALANT AT THE FLOOR LINE (DETAIL CALLS FOR HILTI FX-ONE OR FX-ONE MAX SEALANT). 1ST FLOOR DAMPERS AT ROOMS MULTI-PURPOSE-008 AND PANTRY-006 --- DAMPER OPENING DRYWALL WRAP, ANNULAR SPACING, AND 1 SIDED RETAINAGE OK. | BILLS | BILLS | | HD | P | 7700449 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/22/2023 | ----ENGINEER TO ADDRESS: F-4 is moving to a new location and some duct routing has changed from the approved plan.---- 1ST FLOOR: DAMPER FRAMING OK FOR DAMPER AT PANTRY 006 TO CORRIDOR AND NORTH EXIT CORRIDOR - NOT SHOWN ON CURRENT APPROVED PLAN - CONTINUE AT OWN RISK. ABOVE CEILING DUCT - SUPPLY MAIN DOWN CORRIDOR CONNECTED TO FIRE DAMPERS OK TO WRAP FOR F-2 SYSTEM. SUPPLY/RETURN MAINS DOWN CORRIDOR CONNECTED TO FIRE DAMPERS FOR F-1 SYSTEM OK TO WRAP. 2ND FLOOR - SUPPLY/RETURN MAINS IN MECH ROOM AND DOWN CORRIDOR FOR F-2 SYSTEM CONNECTED TO FIRE DAMPERS OK TO WRAP. | MARKB | MARKB | | HD | P | 7695174 |
RIAL HEATING AND AIR CONDITIONING, INC. | HRP | P | 03/21/2023 | 1ST FLOOR: 350 PSI PRESSURE TEST OK FOR LINESET AT ROOM 102 AND 2 LINESETS IN MECHANICAL ROOM. No access to upper floors at this time. | MARKB | MARKB | | HRP | P | 7693770 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/15/2023 | SUPPLY/RETURN MAINS FROM ROOF DOWN TO 3RD FLOOR OK TO WRAP. 3RD FLOOR - 4 DRYER DUCTS IN GUEST LAUNDRY OK TO COVER. 1ST FLOOR - 2 FIRE DAMPER OPENINGS, ANNULAR SPACE AND ANGLES OK AT SOUTH BATHROOMS. DRYWALL OK IN DAMPER OPENING ON SOUTH WALL OF MECHANICAL ROOM. FIRE DAMPER AT FITNESS OK FOR ANNULAR SPACE AND ANGLES. | MARKB | MARKB | | HD | P | 7688651 |
RIAL HEATING AND AIR CONDITIONING, INC. | HV | P | 03/15/2023 | DISCUSSED VENT TERMINATION CONFIGURATION FOR 1ST FLOOR FURNACES AND WATER HEATERS IN MECHANICAL ROOM. FURNACE INSTALL INSTRUCTIONS WERE ON SITE. HAD TO LOOK UP WATER HEATER INSTRUCTIONS FOR A.O. SMITH MXI CYCLONE LISTED ON APPROVED PLUMBING SCHEDULE. PLUMBER NOT ON SITE. | MARKB | MARKB | | HV | P | 7688645 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/13/2023 | 2ND FLOOR - ABOVE CEILING DUCT BELOW RATED MEMBRANE IN SOFFIT - BATH EXHAUST FANS ON ENTIRE FLOOR AND ERV IN UNIT 209. 1ST FLOOR - FIRE DAMPER FRAMING - FIRE DAMPER FRAMING OK FOR 2 RELOCATES AT MECHANICAL 109, 1 OTHER AT MECHANICAL 109 AND 1 AT FITNESS 112 TO CORRIDOR. | MARKB | MARKB | | HD | P | 7685705 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 03/07/2023 | MET ON SITE WITH NANCY S. (INSPECTOR), DAN RIAL (RIAL HEATING), ADAM (YOW) AND BUILDING CONTRACTOR TO DISCUSS DUCT WRAP THROUGH RATED FLOOR/CEILING AND ROOF/CEILING ASSEMBLIES. DISCUSSED HOW ADAM ARRIVED AT THE CODE COMPLIANCE AND WHAT INSTALLATION WOULD ENTAIL. ADAM WILL REVISE PLANS WITH MORE INFORMATION PRIOR TO INSPECTION. WENT OVER FIRE/SMOKE DAMPER MANUFACTURER INSTRUCTIONS IN RELATION TO MOTOR POSITION. | MARKB | MARKB | | HSP | P | 7680587 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 03/01/2023 | FIRE/SMOKE DAMPERS COMPLETE PER MANUFACTURER INSTRUCTIONS - 2 @ 4TH FLOOR MECH ROOM, 2 @ 3RD FLOOR MECH ROOM, 1 @ 2ND FLOOR MECH ROOM (need manufacturer instructions allowing motor on bottom for 2nd damper), 3 @ 1ST FLOOR MULTIPURPOSE ROOM (need manufacturer instructions allowing motor on bottom for 4th damper), 2 @ 1ST FLOOR MECH/CORRIDOR & 2 FIRE DAMPERS AT RESTROOMS NEXT TO ELEVATOR. | MARKB | MARKB | | HD | P | 7674200 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | L | 02/28/2023 | NO CONTRACTORS FOUND ON SITE - GATE LOCKED | MARKB | MARKB | | HD | L | 7672931 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/21/2023 | 3RD FLOOR EXHAUST FAN INSTALLED IN DROP CEILING COMPLETE IN ALL ROOMS. 2ND, 3RD & 4TH FLOOR ROUGH CORRIDOR DUCT COMPLETE. | MARKB | MARKB | | HD | P | 7666351 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/25/2023 | DAMPER FRAMING - FIRE DAMPER FRAMING OK AT 2ND, 3RD & 4TH FLOOR STORAGE ROOMS FOR 2 OPENINGS. OK TO WRAP WITH DRYWALL. | MARKB | MARKB | | HD | P | 7644392 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/17/2023 | ----ENGINEER TO ADDRESS: Contractor is installing to plan revision #14 but RBD only has revision #13 in approved plan set.---- 1ST FLOOR: DAMPER FRAMING OK FOR 11 FIRE & FIRE/SMOKE DAMPERS. 4TH FLOOR: EXHAUST FANS/CRD'S/EXHAUST DUCT ABOVE BATHROOM CEILING COMPLETE ON ENTIRE FLOOR. | MARKB | MARKB | | HD | P | 7636824 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/09/2023 | 2ND FLOOR: ROUGH BATH/DRYER EXHAUST DUCTS OK TO COVER IN UNITS 201 - 217 EXCLUDING unit 209 not ready and may have a plan revision in the works for ERV unit. | MARKB | MARKB | | HD | P | 7629761 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/21/2022 | 3RD FLOOR: ABOVE CEILING DUCT - DRYER AND BATH EXHAUST DUCTS OK TO COVER IN UNITS 301 - 317 EXCLUDING UNIT 302 where dryer ducts penetrates ceiling membrane out of wall. | MARKB | MARKB | | HD | P | 7618715 |
RIAL HEATING AND AIR CONDITIONING, INC. | HWP | P | 12/15/2022 | CONDENSATE PIPING FOR PTEC UNITS COMPLETE IN WALLS AND CEILINGS FOR 1ST, 2ND & 3RD FLOORS. | MARKB | MARKB | | HWP | P | 7612879 |
RIAL HEATING AND AIR CONDITIONING, INC. | HWP | P | 12/12/2022 | 5 PSI PRESSURE TEST ON CONDENSATE PIPING X 5 OK. North/west stack has low test. Contractor needs to complete nail protection and support and re call inspection - DO NOT COVER | MARKB | MARKB | | HWP | P | 7608675 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 11/28/2022 | ON SITE DISCUSSION WITH BUILDING AND MECHANICAL CONTRACTORS TO DISCUSS PROTECTION OF RTU DROPS THROUGH RATED ROOF/CEILING ASSEMBLY - CONTRACTOR HAS AN UN APPROVED PLAN DETAIL STOPPING FIREMASTER WRAP AT CEILING. DETAIL WILL NEED TO BE APPROVED THROUGH RBD PLAN REVIEW AND SPLICED INTO PLANS BEFORE IT CAN BE APPROVED ON SITE. | MARKB | MARKB | | HSP | P | 7593652 |
DAVIS GAS SHOP INC | HC | C | 11/21/2022 | OK TO RELEASE METER / | LIDO | LIDO | | HC | C | 7588694 |
DAVIS GAS SHOP INC | HO | P | 11/17/2022 | NEED UNDERGROUND GAS TO FIRE PIT SOUTH SIDE OF BUILDING. SEE NOTE 22 / | LIDO | LIDO | | HO | P | 7587337 |
DAVIS GAS SHOP INC | HI | C | 11/17/2022 | SUPPORT 1-1/2" VERTICAL GAS PIPE RISER UP TO ROOF ON EVERY FLOOR. SEE 2015 IFGC TABLE 415.1 / NEED SHUT OFF VALVES AND FINAL GAS CONNECTIONS FOR ALL EQUIPMENT EXCEPT FOR RTU-1 ( rtu-1 is the only gas equipment on roof) / 10 LB TEST OK / GAS INSTALLED PER PLAN / FINAL GAS CONNECTION TO RTU-1 OK / | LIDO | LIDO | | HI | C | 7587335 |
RIAL HEATING AND AIR CONDITIONING, INC. | HRP | P | 10/26/2022 | 450 PSI PRESSURE TEST ON 2 LINESETS IN 4TH FLOOR STORAGE SO21 AND 1 AT 1ST FLOOR 109L. | MARKB | MARKB | | HRP | P | 7563956 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 10/26/2022 | 4TH FLOOR: BATHROOM EXHAUST DUCTS - WALKED ENTIRE 4TH FLOOR. OK PENDING APPROVAL FROM BUILDING INSPECTOR FOR CEILING PENETRATION IN CHASE. CALLED ERIC. | MARKB | MARKB | | HD | P | 7563954 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 06/29/2022 | ONSITE CONSULT WITH MATT M., MIKE L. (RIAL) AND DAVE (COMMERCE CENTER) - ----ENGINEER TO ADDRESS: Plans show multiple rated floor/ceiling penetrations where plans call for a fire or fire/smoke damper to be installed. Dampers are not listed to be installed in a through penetration in a combustible floor/ceiling assembly. Dampers are to be installed and supported per manufacturer instructions.---- | MARKB | MARKB | | HSP | P | 7429965 |
GARRETT PLUMBING L.L.C. | P= | C | 08/03/2023 | | CODYP | CODYP | | P= | C | 7816163 |
GARRETT PLUMBING L.L.C. | P= | P | 07/31/2023 | Both toilets by elevator lack 60" clearance from side wall to lav, NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7812413 |
GARRETT PLUMBING L.L.C. | P= | P | 07/19/2023 | Need to verify shut off valve at elevator sump pump, Both public restrooms by elevator lack 5' clearance from side wall of toilet to lav, Women's restroom accessible toilet is at 18 1/2" from side wall to center needs to be 16-18", NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7802364 |
GARRETT PLUMBING L.L.C. | P= | P | 07/05/2023 | UPDATED 7/6/23 Need shut off valve at elevator sump pump, Threshold for roll in shower can not exceed 1/2", Toilet in unit 115 lacks 16-18" side clearance, Need trap guards on all accessible unit lavs and sinks, Toilet in unit 202 lacks 56" clearance from back wall to counter leg, Handles for toilet tanks in accessible units need to be on operable side, NOTE/ Rest o.k. for accessible units | CODYP | CODYP | | P= | P | 7789729 |
GARRETT PLUMBING L.L.C. | P= | P | 06/30/2023 | Need to complete sinks in 116, 111, and 101, Need to see all accessible units, Need to insulate hot water piping on second floor corridor, Insulate hot water piping in mech room, Still need other corrections, NOTE/ Rest o.k. for 1st floor units | CODYP | CODYP | | P= | P | 7787809 |
GARRETT PLUMBING L.L.C. | P= | P | 06/28/2023 | Need to complete both accessible units 209 and 202, Need to complete sink in 216, Leak on sink in 211, Need to insulate all hot water piping in corridor and mech room, NOTE/ Rest o.k. for 2nd floor and mech room | CODYP | CODYP | | P= | P | 7784674 |
GARRETT PLUMBING L.L.C. | P= | P | 06/27/2023 | No hot water at sink in 301, Need to complete accessible unit 307, NOTE/ Rest o.k. for 3rd floor | CODYP | CODYP | | P= | P | 7783071 |
GARRETT PLUMBING L.L.C. | P= | P | 06/26/2023 | Need to complete accessible unit 407 on 4th floor, NOTE/ Rest o.k. for 4th floor units | CODYP | CODYP | | P= | P | 7782091 |
GARRETT PLUMBING L.L.C. | P= | P | 06/23/2023 | Need proper air gap at t & p drains, Need to complete drain for back flow preventer, Insulate all hot water piping, Mip's used at t & p drains not rated for hot water, NOTE/ Rest o.k. for mech room only today | CODYP | CODYP | | P= | P | 7781128 |
GARRETT PLUMBING L.L.C. | PB | P | 06/14/2023 | Need engineer's letter for AAV's at floor sinks in newly added pantry, See splice dated 6/3/23, NOTE/ Added floor sinks and mop sink o.k. | CODYP | CODYP | | PB | P | 7771514 |
GARRETT PLUMBING L.L.C. | PTO | C | 05/24/2023 | NOTE/ Check mech room and water heaters at final | CODYP | CODYP | | PTO | C | 7753362 |
GARRETT PLUMBING L.L.C. | P= | P | 04/06/2023 | ok for 3rd floor guest laundry (original section of hotel) | JOHNS | JOHNS | | P= | P | 7708654 |
GARRETT PLUMBING L.L.C. | PTO | P | 03/15/2023 | NOTE/ Washer boxes o.k. | CODYP | CODYP | | PTO | P | 7688071 |
GARRETT PLUMBING L.L.C. | PB | L | 01/27/2023 | Field canceled by contractor | CODYP | CODYP | | PB | L | 7646978 |
GARRETT PLUMBING L.L.C. | PTO | P | 01/20/2023 | Need to support water lines on second floor hallway, NOTE/ 1st floor public restrooms o.k./ Water mains in hallway on second floor o.k. | CODYP | CODYP | | PTO | P | 7640043 |
GARRETT PLUMBING L.L.C. | PTO | P | 12/12/2022 | 3rd floor mop sink o.k. | CODYP | CODYP | | PTO | P | 7607873 |
GARRETT PLUMBING L.L.C. | PB | P | 12/09/2022 | OK on underground DWV in restrooms 102A & 102B | FRANKM | FRANKM | | PB | P | 7606993 |
GARRETT PLUMBING L.L.C. | PTO | P | 12/08/2022 | NOTE/ 1st floor tubs o.k./ 2nd floor accessible measurements o.k. | CODYP | CODYP | | PTO | P | 7604907 |
GARRETT PLUMBING L.L.C. | PTO | P | 10/27/2022 | Need plan revision for 2nd floor accessible units, plans show a transfer type shower and a roll in is being installed, 1st floor accessible unit is moving to 2nd floor, NOTE/ 3rd and 4th floor accessible measurements o.k. | CODYP | CODYP | | PTO | P | 7564745 |
GARRETT PLUMBING L.L.C. | PTO | P | 10/24/2022 | NOTE/ 2nd floor nail protection and strapping o.k. | CODYP | CODYP | | PTO | P | 7559834 |
GARRETT PLUMBING L.L.C. | PTO | P | 10/18/2022 | Discussed accessible elements with contractor regarding accessible tub control location and height, NOTE/ Ice maker floor sinks o.k. | CODYP | CODYP | | PTO | P | 7553797 |
GARRETT PLUMBING L.L.C. | PTO | P | 10/17/2022 | Still need accessibility measurements, Need nail protection and strapping on 1st and 2nd floor, Need plan revision for accessible unit moving to second floor and public restrooms being added, NOTE/ Unit water lines o.k. for building/ Nail protection and strapping o.k. for 3rd floor and 4th floor | CODYP | CODYP | | PTO | P | 7552154 |
GARRETT PLUMBING L.L.C. | PTO | P | 10/11/2022 | Missing nail protection throughout, Need plan revision for Accessible room changing to second floor and public restrooms being added, NOTE/ Unit dwv o.k. for rest of building | CODYP | CODYP | | PTO | P | 7546699 |
GARRETT PLUMBING L.L.C. | PTO | P | 10/04/2022 | Missing nail protection throughout, Need to support pex throughout,, NOTE/ Units 113-117 from 1st floor to 4th floor o.k. dwv and water only/ Need flanges, accessibility, and first floor tubs inspected | CODYP | CODYP | | PTO | P | 7538901 |
GARRETT PLUMBING L.L.C. | PTO | P | 10/03/2022 | Need piping on test, NOTE/ Piping o.k. for units 113-117 from 1st floor to 4th floor/ Need accessibility measurements | CODYP | CODYP | | PTO | P | 7537341 |
GARRETT PLUMBING L.L.C. | PRD | P | 08/26/2022 | Need plan revision or engineers letter for PVC above ground for storm drains, NOTE/ Rest of storm drains o.k. | CODYP | CODYP | | PRD | P | 7497408 |
GARRETT PLUMBING L.L.C. | PSP | P | 06/28/2022 | --NEED plan revisions for material, pipe sizing, vents through roof
--NEED plan revision for PB inspection as previously noted
NOTE/ Discussed with general contractor and plumbing contractor that any changes from the approved plans will need a revision | CODYP | CODYP | | PSP | P | 7428162 |
GARRETT PLUMBING L.L.C. | PTO | L | 06/06/2022 | Discussed plans with contractor/ Will need all work to reflect plumbing drawings to include material, pipe sizing, and location/ Still need plan revision for PB | CODYP | CODYP | | PTO | L | 7400675 |
GARRETT PLUMBING L.L.C. | PTO | P | 05/23/2022 | Conversation with contractor regarding future inspections and changes to the plumbing drawings | CODYP | CODYP | | PTO | P | 7385744 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 03/01/2022 | STILL NEED REVISED LAY-OUT -- REST OK | LEE | LEE | | PB | P | 7286681 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 02/16/2022 | ALL OK PENDING BUILDING DRAIN BEING RELOCATED AT TERMINATION -- ((( STILL NEED REVISED PLANS ))) | LEE | LEE | | PB | P | 7273519 |
AMERICAN PLUMBING & HEATING INC. | PRD | P | 02/09/2022 | TWO 4" AND ONE 6" RISER UNDERGROUND OK | LEE | LEE | | PRD | P | 7265550 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 02/09/2022 | EAST HALF COMPLETE PENDING LAY-OUT REVISIONS | LEE | LEE | | PB | P | 7265525 |
AMERICAN PLUMBING & HEATING INC. | PB | P | 01/27/2022 | DEEP MAINS MECH ROOM AND TWO MEETING ROOMS OK | LEE | LEE | | PB | P | 7253069 |
EL PASO ELECTRIC, LLC. | XES | T | 08/07/2023 | PAID (REC#1976397): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised one-line. | BERTHA | BERTHA | | XES | T | 7819290 |
EL PASO ELECTRIC, LLC. | XES | P | 06/07/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power, revised schedules. | BERTHA | BERTHA | | XES | P | 7765424 |
AMERICAN PLUMBING & HEATING INC. | XPS | P | 06/05/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 18 revisions: Adjusted sheet P0.0, P0.2, P1.0, P2.0, P2.1 and P3.0. | SHANEN | SHANEN | | XPS | P | 7762420 |
SUPERIOR BUILDERS INC. | XBS | T | 06/05/2023 | PAID (REC#1959779): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions to Pantry and Fitness equipment/fixtures layouts | DANM | DANM | | XBS | T | 7762301 |
EL PASO ELECTRIC, LLC. | XES | P | 04/03/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power and schedules. | BERTHA | BERTHA | | XES | P | 7705197 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 03/31/2023 | PAID (REC#1944233): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 7703637 |
SUPERIOR BUILDERS INC. | XBS | T | 03/30/2023 | PAID (REC#1943505): PLAN SPLICE FEE: $50 by: DANM for Construction: Listed assembly for duct wrap and firestop penetration for ventilation ducts | DANM | DANM | | XBS | T | 7703068 |
DAVIS GAS SHOP INC | XMS | P | 03/22/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised laundry | JUSTINC | JUSTINC | | XMS | P | 7695410 |
EL PASO ELECTRIC, LLC. | XES | P | 03/13/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power plan and schedules. | BERTHA | BERTHA | | XES | P | 7686043 |
AMERICAN PLUMBING & HEATING INC. | XPS | P | 03/10/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 15 revisions: Adjusted sheet P0.0, P1.1, P1.2, P2.1 and P2.2. | SHANEN | SHANEN | | XPS | P | 7684277 |
SUPERIOR BUILDERS INC. | XBS | T | 03/10/2023 | PAID (REC#1938987): PLAN SPLICE FEE: $50 by: DANM for Construction: Guest Laundry Room changes | DANM | DANM | | XBS | T | 7684147 |
DAVIS GAS SHOP INC | XMS | T | 02/09/2023 | PAID (REC#1933119): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout, schedule, and note revisions | JUSTINC | JUSTINC | | XMS | T | 7658137 |
SUPERIOR BUILDERS INC. | XBS | T | 01/13/2023 | PAID (REC#1926810): PLAN SPLICE FEE: $50 by: DANM for Construction: Revised listing for floor/ceiling assembly | DANM | DANM | | XBS | T | 7635003 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 11/14/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Various layout and schedule revisions | JUSTINC | JUSTINC | | XMS | P | 7581660 |
SUPERIOR BUILDERS INC. | XBS | T | 11/11/2022 | PAID (REC#1914374): PLAN SPLICE FEE: $50 by: DANM for Construction: Various revisions throughout architectural and structural including changing guest room to restrooms and storage | DANM | DANM | | XBS | T | 7580827 |
AMERICAN PLUMBING & HEATING INC. | XPS | T | 11/02/2022 | PAID (REC#1968791): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: see clouded areas | TCRIPPEN | TCRIPPEN | | XPS | T | 7570370 |
EL PASO ELECTRIC, LLC. | XES | T | 11/02/2022 | PAID (REC#1912250): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Delta revision 13. As built. | DANIELG | DANIELG | | XES | T | 7569924 |
SUPERIOR BUILDERS INC. | XBS | T | 10/18/2022 | PAID (REC#1907915): PLAN SPLICE FEE: $50 by: DANM for Construction: Revised and new fire-resistance rated assemblies | DANM | DANM | | XBS | T | 7553600 |
EL PASO ELECTRIC, LLC. | XES | T | 09/26/2022 | PAID (REC#1902276): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Various revisions throughout electrical sheets. Delta revision 9 and 10. | DANIELG | DANIELG | | XES | T | 7529190 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 09/22/2022 | PAID (REC#1901696): PLAN SPLICE FEE: $250 by: TCRIPPEN for Mechanical: see clouded areas on plan pages | TCRIPPEN | TCRIPPEN | | XMS | T | 7527214 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 08/31/2022 | PAID (REC#1901712): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised penetration protection | JUSTINC | JUSTINC | | XMS | T | 7501739 |
SUPERIOR BUILDERS INC. | XBS | T | 08/25/2022 | PAID (REC#1894467): PLAN SPLICE FEE: $100 by: DANM for Construction: Various revisions throughout architectural and structural sheets | DANM | DANM | | XBS | T | 7495562 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | XBS | T | 04/19/2022 | PAID (REC#1861090) PLAN SPLICE FEE: $50 by: DANM for Construction: Deferred roof trusses | DANM | DANM | | XBS | T | 7343640 |