HENSEL PHELPS CONSTRUCTION CO | B= | C | 05/01/2023 | | DAKOTAB | DAKOTAB | | B= | C | 7731913 |
HENSEL PHELPS CONSTRUCTION CO | BFR | R | 09/29/2022 | inspection requested for incorrect permit / no inspection performed | LONNYS | LONNYS | | BFR | R | 7534894 |
HENSEL PHELPS CONSTRUCTION CO | B= | R | 05/16/2022 | field cancelled per site rep guy - not ready. Additional Inspections Required (computer generated): External Agency Inspection FHZ= by FIREDEPT is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | R | 7377614 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 04/11/2022 | above ceiling firestop in EVS room, soiled holding, and control room OK | LONNYS | LONNYS | | BSP | P | 7333606 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 04/07/2022 | drywall and fasteners OK at fire barrier at EVS to soiled room wall | DANE | DANE | | BSP | P | 7329995 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 04/05/2022 | EVS ROOM FRAME INSPECTION / reviewed penetrations and rated assemblies with site rep / NOTE: still need to splice in wall type labels for remainder of scope | LONNYS | LONNYS | | BFR | P | 7326633 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/28/2022 | 2nd and 3rd layer of gypsum at lid of breakdown room OK | DAKOTAB | DAKOTAB | | BSP | P | 7316022 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/24/2022 | GYP ATTACHMENT INSPECTION FOR BREAKDOWN ROOM LID / observed 1st layer of 5/8" X per detail A3 on page A101-P1 | LONNYS | LONNYS | | BSP | P | 7313869 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 03/24/2022 | REST OF PHASE 1 WALL FRAMING // need to splice in wall type labels - need to splice in horizontal assembly detail for smoke barrier continuity 3 locations - still need inspect EVS SUPPLY ROOM when ready - still need to inspect room AG240 when ready - rest of light gauge steel framing OK pending other required inspections / reviewed rated assemblies and accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 7313862 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/11/2022 | site visit to review required firestop listings at smoke barriers / reviewed smoke partitions and smoke barriers with site reps | LONNYS | LONNYS | | BSP | P | 7298836 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/07/2022 | Gypsum attachment at scope wash rooms OK per UL U465 | DAKOTAB | DAKOTAB | | BSP | P | 7293278 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/03/2022 | GYP ATTACHMENT INSPECTION AT 1 HOUR SMOKE BARRIERS AREA A PHASE ONE STAFF AREA / pending spices for wall labels and horizontal assemblies - still need to inspect scope wash room when ready - rest of gyp attachment OK per UL U465 - will need to provide fires stop detail for all penetrating items and head of wall | LONNYS | LONNYS | | BSP | P | 7289417 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/01/2022 | gyp repair and replace at existing smoke partition in mens locker room OK / gyp attachment inspection at smoke barriers not ready / reviewed rated assemblies, splices and fire stop details at penetrations with site rep | LONNYS | LONNYS | | BSP | P | 7286348 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 02/28/2022 | site visit to review need for splice for horizontal assemblies - fire stop detail in rated assemblies for several different penetrating items - discussed need for splice for wall types to be labeled on floor plan to communicate with wall legend on A600 | LONNYS | LONNYS | | BSP | P | 7284799 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 02/23/2022 | FRAME REINSPECTION FOR 2-22-22 -- need to splice in updated plan showing all partition types labeled for entire scope - could not locate wall types for rated assemblies and locations - also need to splice in rated horizontal assemblies and wall height changes / roll in shower framing OK, provide firestop detail for at female shower controls in shower and have inspected - reviewed accessible element requirements with site rep - puddy pads OK - still need to inspect gyp attachment at pre rock locations | LONNYS | LONNYS | | BFR | P | 7280348 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 02/22/2022 | FRAME INSPECTION FOR PHASE ONE ALL AREAS ON A101-P1 NORTH OF MENS AND WOMENS TOILET AREAS // pending other required inspections / need to splice in design changes for added horizontal assembly above breakdown room, hallway AG-3 and wall height changes throughout - still need to inspect wall framing at both roll in showers - missing puddy pads in scope wash room area fire barrier - need to inspect replacement of gyp in mens locker room existing smoke partition - rest of frame in noted area OK / reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 7278678 |
ENCORE ELECTRIC, INC. | E= | C | 05/12/2022 | Phase 1 complete | RANDY | RANDY | | E= | C | 7373634 |
ENCORE ELECTRIC, INC. | ER | P | 04/18/2022 | corrections made | RANDY | RANDY | | ER | P | 7341931 |
ENCORE ELECTRIC, INC. | ER | R | 04/14/2022 | low voltage cables not supported and hanging below grid in 3 rooms area 2A and double door------electric ceiling rough ok | RANDY | RANDY | | ER | R | 7338227 |
ENCORE ELECTRIC, INC. | ER | P | 03/31/2022 | area 1A above ceilings ok | RANDY | RANDY | | ER | P | 7321542 |
ENCORE ELECTRIC, INC. | ER | P | 03/30/2022 | FA with electric | RANDY | RANDY | | ER | P | 7319783 |
ENCORE ELECTRIC, INC. | ER | P | 03/28/2022 | rest of 2A walls | RANDY | RANDY | | ER | P | 7317238 |
ENCORE ELECTRIC, INC. | ER | P | 03/10/2022 | 4 hard lid ceilings in this area OK. | AARONR | AARONR | | ER | P | 7297144 |
ENCORE ELECTRIC, INC. | ER | P | 02/25/2022 | all walls ok | RANDY | RANDY | | ER | P | 7282642 |
ENCORE ELECTRIC, INC. | ER | P | 02/23/2022 | all walls ok | RANDY | RANDY | | ER | P | 7280088 |
MECHONE, INC. | H= | C | 05/06/2022 | TEST AND BALANCE REPORT RECEIVED SEE IMAGES. | TREVORH | TREVORH | | H= | C | 7366332 |
MECHONE, INC. | H= | P | 05/05/2022 | TEST AND BALANCE REPORT UNDER REVIEW SEE IMAGES | TREVORH | TREVORH | | H= | P | 7364487 |
MECHONE, INC. | H= | P | 04/27/2022 | FINAL PENDING-------------TEST AND BALANCE REPORT | TREVORH | TREVORH | | H= | P | 7354947 |
MECHONE, INC. | HD | P | 04/11/2022 | CONTRACTOR HAS STATED A PLAN SPLICE IS FORTHCOMING, WILL NEED PREVIOUSLY NOTED PLAN SPLICE ALSO TO INCLUDE RESIZED 24 X 12 DUCT ROUTED ACROSS OPERATING ROOMS, 1 ST FLOOR ABOVE CEILING ROUGH (BDA) PAGE 96, DUCT COMPLETE IN ROOM (EVS SUPPLIES) RETURN AIR COMPLETE IN( CONTROL ROOM) REROUTED 24 X 12 DUCTING OK, ABOVE CONTROL ROOM CEILING. | TREVORH | TREVORH | | HD | P | 7333238 |
MECHONE, INC. | HD | P | 03/30/2022 | STILL NEED PLAN SPLICE ON FILE FOR DUCT ROUTING , 1 ST FLOOR PLAN SHEET M2.01 (BDA) PAGE 96 AREA 1 A ABOVE HARD LID CEILING HARD TIE IN OK, AT AG 234 THREE 8'' ROUND SUPPLYS OFF OF TB-117 OK, OK TO WRAP. 10 X10 RETURN STARTING IN AG 236 HAS BEEN ROUTED OUT OF THE CORRIDOR AND NEW DUCT ROUTING WILL NEED TO BE SHOWN ON PLANS. CONTRACTOR WILL BE REMOVING A FIRE SMOKE DAMPER THIS WILL NEED TO BE ON THE PLANS AS WELL. | TREVORH | TREVORH | | HD | P | 7319760 |
MECHONE, INC. | HD | P | 03/29/2022 | CANCELLED BY CONTRACTOR DURING THE CALL AHEAD PROCEDURE | TREVORH | TREVORH | | HD | P | 7317773 |
MECHONE, INC. | HD | P | 03/28/2022 | CANCELLED BY CONTRACTOR DURING THE CALL AHEAD PROCESS | TREVORH | TREVORH | | HD | P | 7316242 |
MECHONE, INC. | HD | P | 03/15/2022 | WALKED NEW DUCT ROUTING THAT WILL BE INCLUDED ON UPCOMING PLAN SPLICE FOR CLARIFICATION, STILL NEED PLAN SPLICE FROM PREVIOUS INSPECTION , (BDA) 96 AND 97, DUCT ROUGH, 12'' X 12'' EXHAUST TO BE SHOWN ON FORTHCOMING PLAN SPLICE , 8'' ROUND AT SCOPE WASH OK, OK TO WRAP. AT NEXT INSPECTION WILL NEED TO VERIFY ALL REQUIREMENTS FROM WORK NOTES M27,M44 AND M55 HAVE BEEN MET. | TREVORH | TREVORH | | HD | P | 7302236 |
MECHONE, INC. | HD | P | 03/14/2022 | STILL NEED PLAN SPLICE FROM PREVIOUS INSPECTION , (BDA) 96 AND 97, DUCT ROUGH, 12'' X 12'' EXHAUST TO BE SHOWN ON FORTHCOMING PLAN SPLICE , 8'' ROUND AT SCOPE WASH OK, OK TO WRAP. AT NEXT INSPECTION WILL NEED TO VERIFY ALL REQUIREMENTS FROM WORK NOTES M27,M44 AND M55 HAVE BEEN MET. | TREVORH | TREVORH | | HD | P | 7300728 |
MECHONE, INC. | HD | P | 03/04/2022 | LEVEL 00 PLAN PAGE M2.01 : WILL NEED PLAN SPLICE REFLECTING THE CURRENT DUCT ROUTING FOR VAV-143 PLAN SHOWS RETURN AIR CONNECTING TO EXISTING 32 X 14 SERVING ROOM NEXT TO SCOPE WASH DIRTY THIS DUCT IS ON THE OTHER SIDE OF THE RATED WALL (ENGINEER TO ADDRESS) MULTIPLE DUCTS FROM X VAV-15 ARE PENETRATING A SMOKE BARRIER. KEY NOTE M27 SHOWN FOR THESE WALL PENETRATIONS CALL OUT 2015 IMC CODE SECTION 607.5.4 (3). THIS CODE SECTION DOES NOT WORK TO ELIMINATE A SMOKE DAMPER DUE TO THERE BEING AN OPENING (supply air) SERVING THE CORRIDOR. THERE ARE OTHER AREAS THAT WILL HAVE THE SAME ISSUE.CONTRACTOR PROCEEDING AT OWN RISK ( ENGINEER MUST ADDRESS ALL AREAS / LEVEL 00 PLAN PAGE M2.01 (bda 96) / M2.02 (bda 97) DUCT ROUGH : VAV-15 AND 16 SUPPLY MAIN AND LATERAL RUN OUTS OK, OK TO WRAP, WOMENS ROOMS AG 288A AND B EXHAUST TO HARD LIDS OK, VAV-141 MAIN AND LATERAL OK, OK TO WRAP, ROOM # AG290A / AG290C - SUPPLY AND EXHAUST DUCT ROUGH OK. OK TO INSULATE / X VAV-141 - LOW PRESSURE DUCT ROUGH OK. OK TO INSULATE / | TREVORH | TREVORH | | HD | P | 7290748 |
MECHONE, INC. | HD | P | 02/28/2022 | LEVEL 00 PLAN PAGE M2.01 : MULTIPLE DUCTS FROM X VAV-15 ARE PENETRATING A SMOKE BARRIER. KEY NOTE M27 SHOWN FOR THESE WALL PENETRATIONS CALL OUT 2015 IMC CODE SECTION 607.5.4 (3). THIS CODE SECTION DOES NOT WORK TO ELIMINATE A SMOKE DAMPER DUE TO THERE BEING AN OPENING (supply air) SERVING THE CORRIDOR. THERE ARE OTHER AREAS THAT WILL HAVE THE SAME ISSUE. ENGINEER MUST ADDRESS ALL AREAS / LEVEL 00 PLAN PAGE M2.01 (bda 96) / M2.02 (bda 97) DUCT ROUGH : ROOM # AG290A / AG290C - SUPPLY AND EXHAUST DUCT ROUGH OK. OK TO INSULATE / X VAV-141 - LOW PRESSURE DUCT ROUGH OK. OK TO INSULATE / | LIDO | LIDO | | HD | P | 7285076 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 04/20/2023 | OK PER PHOTO SUBMITTED ( SEE IMAGES ) | LEE | LEE | | P= | C | 7721772 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/17/2023 | ENDOSCOPY SINK DRAIN NOT PLUMBED TO CODE ( DUAL TRAPS ON 1-1/2 FIXTURE DRAIN -- SAN TEE ON ITS SIDE ) -- Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | LEE | LEE | | P= | P | 7718836 |
OLSON PLUMBING & HEATING COMPANY | PE | P | 11/01/2022 | | JACKIEP | JACKIEP | | PE | P | 7568784 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 05/18/2022 | WAITING ON ENDOSCOPY SINK -- REST OK | LEE | LEE | | P= | P | 7380468 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 05/16/2022 | ICE MACHINES NEED TO DRAIN INDIRECT X-2 -- ENDOSCOPY SINK MISSING -- REST OK | LEE | LEE | | P= | P | 7376834 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/29/2022 | PHASE 1-A - MENS RESTROOM URINALS LACK PROPER SIDE CLEARANCE -- ENDOSCOPY SINK MISSING -- NEED OWNER SUPPLIED EQUIPMENT - WATER / DRAINS -- INSTALL TRAP GUARDS IN RESTROOM F/DRAINS | LEE | LEE | | P= | P | 7358402 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/22/2022 | PHASE 1 -- 2-A ROOMS AG 236 AND AG 234 MOP SINK2- HAND SINKS / EYE WASH OK | LEE | LEE | | PTO | P | 7309973 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 03/09/2022 | not piped per plan, dwv at column L run to different location, run in opposite direction to 4" drain at column M, dwv was tested and sized per plans | JOSEPHD | JOSEPHD | | PB | P | 7295149 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/25/2022 | showers ok | JOSEPHD | JOSEPHD | | PTO | P | 7282635 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/24/2022 | need to measure showers, need to see hammer arrestors at toilets and urinals, need to see water pipe point of connections, need to see water pipe insulation, rough in room AG313 will be done in phase 2, rest ok | JOSEPHD | JOSEPHD | | PTO | P | 7281302 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/08/2022 | under floor in area B - 2" at columns H and 6 run to different location, and 2" from upstairs column H and 6.8 plans show to run to 4" it is now run to 2" will need plans to reflect changes still need to see under floor in room AG313, rest of area B ok, under floor area A in locker room ok | JOSEPHD | JOSEPHD | | PB | P | 7262834 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 05/19/2022 | PAID (REC#1868611): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Removed sink from AG234 | LBENNETT | LBENNETT | | XBS | T | 7381643 |
ENCORE ELECTRIC, INC. | XES | P | 04/22/2022 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Delta revision 11. As built. | DANIELG | DANIELG | | XES | P | 7348820 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 04/12/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Duct layout and schedule revisions | JUSTINC | JUSTINC | | XMS | P | 7334796 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 04/06/2022 | PAID (REC#1856669): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: RCP changes | LBENNETT | LBENNETT | | XBS | T | 7328432 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 03/31/2022 | PAID (REC#1855054): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised layout @ AG236 area | LBENNETT | LBENNETT | | XBS | T | 7322323 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 03/29/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | P | 7318660 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 03/17/2022 | PAID (REC#1851503): PLAN SPLICE FEE: $83.33 by: LBENNETT for Construction: Updated walls types & new soffit in breakdown room | LBENNETT | LBENNETT | | XBS | T | 7305545 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 03/02/2022 | PAID (REC#1849104): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 7 revisions: Adjusted sheet P1.01, P1.02, P2.02, PD1.02 and PD2.02. | SHANEN | SHANEN | | XPS | T | 7286853 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 02/17/2022 | PAID (REC#1844739): PLAN SPLICE FEE: $62.5 by: LBENNETT for Construction: Wall revisions between OR & lockers | LBENNETT | LBENNETT | | XBS | T | 7274809 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 01/27/2022 | PAID (REC#1839650): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised egress/circulation paths | LBENNETT | LBENNETT | | XBS | T | 7252029 |