RAINE BUILDING LLC. | B= | C | 11/09/2022 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 7577705 |
RAINE BUILDING LLC. | B= | P | 03/04/2022 | pending completion of mech final, building okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), TOLIN MECHANICAL SYSTEMS CO. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7291561 |
RAINE BUILDING LLC. | BFR | P | 02/03/2022 | need to attach mech and plumbing to permit - pending completion of all required rough inspections , interior wall framing okay / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 7258498 |
RAINE BUILDING LLC. | BIN | P | 02/01/2022 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | AMYP | AMYP | | BIN | P | 7257681 |
HARRIS ELECTRIC GROUP | E= | C | 03/04/2022 | Interior remodel complete | CHIPO | CHIPO | | E= | C | 7291152 |
HARRIS ELECTRIC GROUP | ER | C | 02/24/2022 | above ceilings okay - rough in complete | CHIPO | CHIPO | | ER | C | 7281555 |
HARRIS ELECTRIC GROUP | ER | P | 02/01/2022 | rough in for walls only - okay | CHIPO | CHIPO | | ER | P | 7257675 |
TOLIN MECHANICAL SYSTEMS COMPANY, LLC | H= | C | 03/29/2022 | PERMIT CORRECTION MADE | JERRYF | JERRYF | | H= | C | 7317342 |
TOLIN MECHANICAL SYSTEMS COMPANY, LLC | H= | P | 03/21/2022 | ADD VAV TO PERMIT WORK SCOPE | JERRYF | JERRYF | | H= | P | 7307754 |
TOLIN MECHANICAL SYSTEMS COMPANY, LLC | H= | P | 02/28/2022 | PARTIAL PENDING TAB REPORT AND ADDING RELOCATED VAV TO PERMIT WORK SCOPE NOTE / ALL SA / RA GRILLES / CONTROLS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 7284889 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/07/2022 | Corrections made see images | CODYP | CODYP | | P= | C | 7401458 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 03/15/2022 | Need trap guard at p trap for t & p drain, no access to verify plenum wrap, still need engineers letter for plenum wrap, ok to attach photos at next inspection request | CODYP | CODYP | | P= | P | 7301695 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 03/10/2022 | Run T&P to approved location with air gap / Need engineers approval letter for plenum wrapped PVC on vent piping / need plenum wrap on PVC pipe ( R/ A plenum) / need tiles removed and ladder set up to verify plenum wrap / rest ok. | DANR | DANR | | P= | P | 7296972 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 02/14/2022 | Ok. Note: Need engineers approval letter for plenum wrapped PVC on vent piping / need plenum wrap on PVC pipe ( R/ A plenum) / check plenum wrap at final. | DANR | DANR | | PTO | C | 7269429 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 02/11/2022 | Under floor only: Need engineers approval letter for plenum wrapped PVC on drain piping / need plenum wrap on PVC pipe ( R/ A plenum).
| DANR | DANR | | PTO | P | 7267552 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 02/10/2022 | Need contractor to have ladder set up in suite below for overhead inspection of new piping to suite 315 / piping stubbed into suite 315 was on test.
| DANR | DANR | | PTO | P | 7265901 |
RAINE BUILDING LLC. | XBS | T | 03/04/2022 | PAID (REC#1848848): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Remove door | MICHAELA | MICHAELA | | XBS | T | 7290230 |