GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/18/2022 | | BRIANB | BRIANB | | B= | C | 7487706 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/13/2022 | Building final at Clean Linen, Soiled Linen, Decon and Loading Dock Office / Complete other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FIRE ALARM: ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 7444538 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/20/2022 | GYP PENETRATIONS / ABOVE GRID / observed above grid gyp penetrations | BRIANB | BRIANB | | BSP | P | 7417026 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/27/2022 | 2nd and 3rd layer of gypsum attachment at soffit in bio lab OK per UL V455 | DAKOTAB | DAKOTAB | | BSP | P | 7392060 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/25/2022 | FRAME INSPECTION / SMOKE PARTITIONS / observed wall framing to deck above for smoke partitions in office / observed mtl framing for soffit (I501) and observed 1" American gyp panels - mtl framing for vertical (V455) in soils bio - see approved plan splice dated 13MAY22 / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7388636 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/04/2022 | ON-SITE CONSULT: Will need to splice drawings in to change framing from straight up to deck to adding horizontal assembly and then turning the wall up to deck | JEREMYA | JEREMYA | | BFR | P | 7363339 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/14/2022 | wall framing for smoke partitions do not extend to deck above / observed wall framing / pending other rough inspections / discussed accessible elements | BRIANB | BRIANB | | BFR | P | 7339161 |
ENCORE ELECTRIC, INC. | E= | C | 08/11/2022 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7479924 |
ENCORE ELECTRIC, INC. | E= | C | 08/11/2022 | | AARONR | AARONR | | E= | C | 7479910 |
ENCORE ELECTRIC, INC. | E= | C | 07/21/2022 | FIRE ALARM INSPECTION: Fire final OK. | AARONR | AARONR | | E= | C | 7455789 |
ENCORE ELECTRIC, INC. | E= | C | 07/20/2022 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7454142 |
ENCORE ELECTRIC, INC. | E= | R | 07/15/2022 | E= OK ----- G105 - G106 - G121 - G122 ----- | GREGM | GREGM | | E= | R | 7447814 |
ENCORE ELECTRIC, INC. | ER | P | 06/16/2022 | FIRE ALARM INSPECTION: Ceiling rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7414766 |
ENCORE ELECTRIC, INC. | ER | P | 06/16/2022 | Ceiling rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7414669 |
ENCORE ELECTRIC, INC. | ER | P | 04/14/2022 | FIRE ALARM INSPECTION: Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7339403 |
ENCORE ELECTRIC, INC. | ER | P | 04/14/2022 | Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7339400 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 08/16/2022 | STAMPED ENGINEER LETTER APPROVING TEST AND BALANCE RECEIVED. SEE IMAGES / MECHANICAL CONTRACTOR FINAL OK / | LIDO | LIDO | | H= | C | 7483905 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 07/28/2022 | TEST AND BALANCE REPORT REVIEW: AHU-17 - MISSING OUTSIDE AIR READINGS (see plan page M201) / ROOM # G105 - E#1 IS OUTSIDE THE 10% +/- ALLOWED / ROOM # G019 - E#2 IS OUTSIDE THE 10% +/- ALLOWED / NEED REVISED TEST AND BALANCE REPORT OR ENGINEER TO APPROVED THE READINGS / | LIDO | LIDO | | H= | P | 7464082 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 07/21/2022 | TEST AND BALANCE REPORT IS BEING REVIEWED. | LIDO | LIDO | | H= | P | 7454359 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 07/18/2022 | PLAN PAGE MH101 SPLICE DATED 07/06/2022 ADDRESSING ROOM # G109 SUPPLY AND EXHAUST DUCT INTO SAID ROOM ON FILE (wall is not rated.). FINAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | HD | P | 7449134 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/29/2022 | REVIEWED WHAT IS NEEDED FOR DUCT ROUGH AND HEAT FINAL (discussed the following with mechanical contractor) : HEAT DUCT ROUGH AND HEAT FINAL PENDING ENGINEER TO ADDRESS NOTES DATED 6/8/22 / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | HD | P | 7429644 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/16/2022 | PLAN SPLICE DATED 05/05/2022 MH-101 ( BDA 20) : TWO SMOKE DAMPERS OK / | LIDO | LIDO | | HD | P | 7413791 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 06/14/2022 | HYDRONIC CONTRACTOR FINAL OK / | LIDO | LIDO | | H= | C | 7410093 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/13/2022 | THERMOSTATS INSTALLED / HEAT DUCT ROUGH AND HEAT FINAL PENDING ENGINEER TO ADDRESS NOTES DATED 6/8/22 / NEED TO INSTALL SMOKE DAMPERS / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | HD | P | 7409524 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 06/09/2022 | PLAN PAGE MP-101 : VAV TB-RDG-4 & VAV TB-RDG-4 HWS / HWR INSTALLED PER PLAN, HYDRONIC PIPING UNDER OPERATING PRESSURE WITH NO VISIBLE LEAKS. FINAL CONNECTIONS TO VAV'S OK / | LIDO | LIDO | | HWP | C | 7406161 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/08/2022 | UPDATED NOTES : GRILLS INSTALLED IN ROOM G105 ARE NOT OK. ENGINEER TO REVIEW AND ADDRESS RATING OF INSIDENTAL USE ROOM AND PROTECTION FOR PENETRATIONS THROUGH RATING / | LIDO | LIDO | | HD | P | 7403805 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/08/2022 | PLAN PAGE MH101 SPLICE DATED 05/05/2022 / ALSO SEE SPLICE A101 DATED 05/02/2022 ROOM # G109 : PLANS SHOW THREE DUCTS PENETRATING THROUGH A FIRE BARRIER UTILIZING 2015 IBC CODE SECTION 717.5.2 EXCEPTION (3) (note 6). ENGINEER TO ADDRESS THE DUCT NOT PENETRATING THE FIRE BARRIER DUE TO THE WALL NOT EXTENDING ALL THE WAY TO ROOF CEILING ASSEMBLY. PER CONVERSATION WITH PLAN REVIEW THE CEILING MAY NEED TO BE RATED SINCE THE WALL DOES NOT FULLY EXTEND TO THE ROOF CEILING ASSEMBLY ABOVE, ENGINEER TO ADDRESS TWO SUPPLY AND ONE EXHAUST THAT WILL BE PENETRATING THIS CEILING IF RATED. | LIDO | LIDO | | HD | P | 7403519 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/07/2022 | PLAN PAGE MH101 PLAN SPLICE 5/5/22 : NEED TO REVIEW KEY NOTE (6) /ALL SUPPLY FLEX DUCT AND REGISTERS OK / ALL EXHAUST DUCT RIGID DUCT AND GRILLS OK / ALL RETURN AIR LAY IN GRILLS OK /
| LIDO | LIDO | | HD | P | 7402494 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 05/17/2022 | PLAN PAGE MH101 : 1 DAMPER COMPLETE. SEE IMAGES./ | LIDO | LIDO | | HD | P | 7378485 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 05/16/2022 | PLAN PAGE MH101 : 4 DAMPERS COMPLETE / | LIDO | LIDO | | HD | P | 7377480 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/20/2022 | PER NOTE 7 CONTRACTOR VERIFIED 16" X 10" GENERAL EXHAUST AND 10" SUPPLY FIRE DAMPER ARE NOT EXISTING AND WILL BE INSTALLING NEW FIRE DAMPERS. NEED SPLICE ADDING THE TWO DAMPERS TO MECHANICAL PLAN / TWO FIRE DAMPER FRAMES OK / | LIDO | LIDO | | HD | P | 7345486 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/13/2022 | THREE FIRE DAMPER FRAMES OK / | LIDO | LIDO | | HD | P | 7336910 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/06/2022 | NEED ELECTRICAL AND PLUMBING CONTRACTOR ATTACHED TO PERMIT / DUCT ROUGH : STILL NEED ALL FIRE DAMPER FRAMING AND DAMPER INSTALL / VAV TBRDG-4 AND 5 VAV AND ALL LOW PRESSURE DUCT OK. OK TO INSULATE / ALL EXHAUST DUCT ROUGH OK / | LIDO | LIDO | | HD | P | 7329105 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 06/16/2022 | | JOSEPHD | JOSEPHD | | P= | C | 7413049 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 06/16/2022 | drain capped verified electronically | JOSEPHD | JOSEPHD | | PTO | C | 7413048 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 06/16/2022 | | JOSEPHD | JOSEPHD | | PB | C | 7413045 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 06/09/2022 | will need to conduct more research into drain needing capped at pto, will update notes in morning | JOSEPHD | JOSEPHD | | P= | P | 7406202 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 04/13/2022 | FOR ONE SINK | LEE | LEE | | PB | P | 7336977 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/13/2022 | Need to cap old drain line to floor sink / rest ok. | DANR | DANR | | PTO | P | 7336975 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 07/08/2022 | PAID (REC#1882405): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised roorm TG019 use to clean supply; revised adjacent wall type | LBENNETT | LBENNETT | | XBS | T | 7440223 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 07/06/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 7436842 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 05/13/2022 | PAID (REC#1870031): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout and note revisions | JUSTINC | JUSTINC | | XMS | T | 7375742 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 05/13/2022 | PAID (REC#1866907): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised incidental use walls | LBENNETT | LBENNETT | | XBS | T | 7375432 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 05/05/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revised | JUSTINC | JUSTINC | | XMS | P | 7364687 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 05/02/2022 | PAID (REC#1863823): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added wall types | LBENNETT | LBENNETT | | XBS | T | 7359630 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XPS | T | 03/22/2022 | PAID (REC#1856518): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 089 revisions: Adjusted sheet PLD101 and PL101. | SHANEN | SHANEN | | XPS | T | 7310620 |