HILL COMMERCIAL CONSTRUCTION, LLC | B= | C | 06/07/2023 | All other required Final inspections are complete. (This is a computer generated result) | JASONL | JASONL | | B= | C | 7765926 |
HILL COMMERCIAL CONSTRUCTION, LLC | B= | P | 04/28/2023 | Final OK pending the completion of outstanding inspections. Additional Inspections Required (computer generated): External Agency Inspection FHZ= by FIREDEPT is not Completed yet, MAGNUM EDGE,INC. Mechanical Final Inspection is not Completed yet. | JASONL | JASONL | | B= | P | 7730358 |
HILL COMMERCIAL CONSTRUCTION, LLC | BFR | P | 10/14/2022 | ROOM 113 WALL FRAMING / ROOM 104 AND 116 SOFFIT FRAMING / Observed light gauge metal wall framing and soffit framing at areas noted / pending other rough inspections | JASONL | JASONL | | BFR | P | 7551405 |
HILL COMMERCIAL CONSTRUCTION, LLC | BFR | R | 09/19/2022 | PARTIAL / REMAINING WALL FRAME / Room 113 not ready and needs re-inspection / gyp and framing removed at existing stl columns (VA construction) will need to submit plan splice for modifications done at (3) stl columns for structure and re-inspected / observed other new interior non-load bearing light gauge framing / still need to attach mechanical to permit and complete other rough inspections / discussed accessible elements with site reps / updated 23SEPT22 - after further review (3) stl columns are pre-existing non-conforming | BRIANB | BRIANB | | BFR | R | 7521921 |
HILL COMMERCIAL CONSTRUCTION, LLC | BFR | P | 07/08/2022 | PARTIAL / INTERIOR LIGHT GAUGE FRAMING ROOMS 107 AND 108 ONLY / Observed interior light gauge framing in rooms 107 and 108 only / Need to attach mechanical and plumbing to permit and complete outstanding rough inspections / Reviewed accessible elements with on site supervisor / Training with PPRBD inspector Brian | JASONL | JASONL | | BFR | P | 7439989 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | P | 07/08/2022 | Training with PPRBD inspector Jason / VA construction / reviewed VA construction - reviewed fire barrier construction at med gas closets - IFC 5306 / discussed accessible elements | BRIANB | BRIANB | | BSP | P | 7439988 |
PINE VALLEY ELECTRIC, INC. | E= | C | 11/28/2022 | Panel HIB is an existing Panel/ Need GFCI protection for 2-Autoclave circ uits in 113 / Need Panel Labeling / | ROB | ROB | | E= | C | 7594016 |
PINE VALLEY ELECTRIC, INC. | ER | C | 11/28/2022 | Rough ok / | ROB | ROB | | ER | C | 7594007 |
PINE VALLEY ELECTRIC, INC. | ER | P | 10/27/2022 | Reception check out desk OK. | AARONR | AARONR | | ER | P | 7565314 |
PINE VALLEY ELECTRIC, INC. | ER | P | 10/14/2022 | 2- recess fixtures in Corr. 103B and 1 at Checkout 103 in hard lids / Verify out of Patient area / | ROB | ROB | | ER | P | 7551521 |
PINE VALLEY ELECTRIC, INC. | ER | P | 09/16/2022 | phase 3 hard lid ceiling in 124, 127 and 128 ok | CRAIG | CRAIG | | ER | P | 7519782 |
PINE VALLEY ELECTRIC, INC. | ER | P | 08/30/2022 | Rough for walls ok in Bathroom, Breakroom, Checkout Corridor wall, Mech room, Dental chair corridor / Room 114, and Sterilization room / | ROB | ROB | | ER | P | 7501280 |
PINE VALLEY ELECTRIC, INC. | EUG | P | 08/30/2022 | EUG ok for 4 chairs and 1 island--3/4 PVC coated GRC / | ROB | ROB | | EUG | P | 7501278 |
PINE VALLEY ELECTRIC, INC. | ER | P | 07/11/2022 | Need listed raceway feed above ceiling to lighting in rm 108 / Rm's 107 and 108 walls - Ok | BRETC | BRETC | | ER | P | 7441207 |
PINE VALLEY ELECTRIC, INC. | ER | R | 07/08/2022 | Contractor will need to bring existing room up to code for medical wiring. --- All redundant circuits will need to be continuous back to panel. --- All existing wiring in medical area will need to be removed if not in use. | AARONR | AARONR | | ER | R | 7439526 |
MAGNUM EDGE,INC. | H= | C | 05/05/2023 | STAMPER ENGINEER LETTER RECEIVED APPROVING THE TEST AND BALANCE REPORT AND VERIFYING THE OUTSIDE AIR (30%) WAS ACHIEVED. SEE IMAGES / MECHANICAL CONTRACTOR FINAL OK / | LIDO | LIDO | | H= | C | 7736555 |
MAGNUM EDGE,INC. | H= | P | 04/26/2023 | FINAL PENDING: STILL NEED REVISED TEST AND BALANCE REPORT. SEE NOTES DATED 4/20/23 / | LIDO | LIDO | | H= | P | 7727338 |
MAGNUM EDGE,INC. | H= | P | 04/20/2023 | TEST AND BALANCE REPORT REVIEW: MISSING OUTSIDE AIR READINGS. REST OF REPORT OK / | LIDO | LIDO | | H= | P | 7721934 |
MAGNUM EDGE,INC. | H= | P | 04/19/2023 | FINAL PENDING: NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7721262 |
MAGNUM EDGE,INC. | HD | P | 11/17/2022 | ENGINEER TO ADDRESS THE FOLLOWING: NOTE 8 CALLS FOR COMPRESSOR INTAKE PIPING TO TIE INTO EXISTING PIPE. THERE IS NO EXISTING PIPE AND INTAKE PIPE TERMINATES IN THE ABOVE CEILING PLENUM RETURN. NOTE 9 CALLS FOR VACUUM EXHAUST TO TIE INTO EXISTING PIPE. THERE IS NO EXISTING EXHAUST PIPE AND THE EXHAUST PIPE TERMINATES IN THE ABOVE CEILING PLENUM RETURN. / INSTALL PER NOTE 7 OR ENGINEER TO ADDRESS / ROOM 123: RELOCATED THERMOSTAT IS ABOVE 48" ABOVE THE FLOOR. LOWER THERMOSTAT OR OK TO INSTALL A LOCK BOX / ALL NEW DUCT ROUGH, SUPPLY REGISTERS AND RETURN GRILLS OK / NEED TEST AND BALANCE REPORT BY FINAL / | LIDO | LIDO | | HD | P | 7587065 |
BULLETPROOF PLUMBING AND HEATING INC. | P= | C | 04/24/2023 | | JOSEPHD | JOSEPHD | | P= | C | 7724986 |
BULLETPROOF PLUMBING AND HEATING INC. | P= | P | 12/22/2022 | no one on site to meet inspector, office staff was not aware of inspection, will need to reschedule | JOSEPHD | JOSEPHD | | P= | P | 7619301 |
BULLETPROOF PLUMBING AND HEATING INC. | PTO | C | 11/30/2022 | splice done | JOSEPHD | JOSEPHD | | PTO | C | 7596562 |
BULLETPROOF PLUMBING AND HEATING INC. | PB | C | 11/30/2022 | splice done | JOSEPHD | JOSEPHD | | PB | C | 7596561 |
BULLETPROOF PLUMBING AND HEATING INC. | P= | P | 11/30/2022 | lacking knee clearance at lav in room 124, need tempering at lav in 124, breakroom sink to high to lip of sink, need contractor to proved documentation at plenum wrap to verify 25-50 rating, rest ok | JOSEPHD | JOSEPHD | | P= | P | 7596558 |
BULLETPROOF PLUMBING AND HEATING INC. | PTO | P | 09/19/2022 | inspection for rooms 123.124.126 only, in wall dwv ok, need engineer letter for pvc in plenum, need to see plenum wrap on venting, in wall water pipe tested, plans show 3/4" to all drops in wall, 1/2 run at all drops in rooms 123.124.126, plans show existing 1" water supplies but all existing supplies are 3/4" need engineer letter for aav @ sink in room 126, still need to see water pipe insulation | JOSEPHD | JOSEPHD | | PTO | P | 7522038 |
BULLETPROOF PLUMBING AND HEATING INC. | PB | P | 09/16/2022 | dwv under ground test ok, need plans to reflect pipe sizing and layout | JOSEPHD | JOSEPHD | | PB | P | 7520180 |
BULLETPROOF PLUMBING AND HEATING INC. | PB | P | 09/01/2022 | need plans to match work done areas 115,116,124,123,126 run to different location than plans show, dwv plan shows 3" pipe run thru area connection to 4" it is run in 2" at this time, plans show 3/4 hot and cold to sink 115 1/2 is run at this time, lost test at 2" sink run, dwv 114 ok | JOSEPHD | JOSEPHD | | PB | P | 7504509 |
MAGNUM EDGE,INC. | XMS | T | 01/03/2023 | PAID (REC#1924032): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised exhaust | JUSTINC | JUSTINC | | XMS | T | 7623738 |
BULLETPROOF PLUMBING AND HEATING INC. | XPS | T | 10/10/2022 | PAID (REC#1905623): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Adjusted sheet P111 and P111A. | SHANEN | SHANEN | | XPS | T | 7544632 |
BULLETPROOF PLUMBING AND HEATING INC. | XPS | T | 09/19/2022 | PAID (REC#1902281): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P111 and P111A. | SHANEN | SHANEN | | XPS | T | 7520709 |
PINE VALLEY ELECTRIC, INC. | XES | P | 09/02/2022 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Delta revision 2. Minor floor-plan revisions. | DANIELG | DANIELG | | XES | P | 7505165 |
BULLETPROOF PLUMBING AND HEATING INC. | XPS | T | 09/02/2022 | PAID (REC#1899651) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet PD111, P111 and P111A. | SHANEN | SHANEN | | XPS | T | 7505081 |
HILL COMMERCIAL CONSTRUCTION, LLC | XBS | T | 09/02/2022 | PAID (REC#1899578): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Minor floorplan revisions. | BPHILLIPS | BPHILLIPS | | XBS | T | 7505008 |
PINE VALLEY ELECTRIC, INC. | XES | P | 07/28/2022 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Delta revision 1. As built. | DANIELG | DANIELG | | XES | P | 7462806 |
HILL COMMERCIAL CONSTRUCTION, LLC | XPS | T | 07/05/2022 | PAID (REC#1881180): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P111B. | SHANEN | SHANEN | | XPS | T | 7435416 |