FIRST GENERAL SERVICES FRONT RANGE | B= | C | 03/22/2023 | | LONNYS | LONNYS | | B= | C | 7694451 |
FIRST GENERAL SERVICES FRONT RANGE | B= | P | 02/24/2023 | Temp CO: pending required finals ( Expires: 3/26/2023 12:00:00 AM) | BRITNEY | BRITNEY | | B= | P | 7669440 |
FIRST GENERAL SERVICES FRONT RANGE | B= | P | 02/24/2023 | building final OK pending other required inspections. Additional Inspections Required (computer generated): ELECTRIC TECH INC. Electrical Final Inspection is not Completed yet, AIRTECH MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, WESTSIDE PLUMBING LTD Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7669117 |
FIRST GENERAL SERVICES FRONT RANGE | B= | P | 02/23/2023 | still need to remove cylinder lock in storage room next to front entrance / rest OK pending other required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ELECTRIC TECH INC. Electrical Final Inspection is not Completed yet, AIRTECH MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, WESTSIDE PLUMBING LTD Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7668765 |
FIRST GENERAL SERVICES FRONT RANGE | BFR | C | 02/23/2023 | frame items corrected | LONNYS | LONNYS | | BFR | C | 7668764 |
FIRST GENERAL SERVICES FRONT RANGE | B= | P | 02/22/2023 | pending other required inspections / complete BFR / remove cylinder lock front entrance office / missing all vertical grab bars in all accessible bathrooms / missing clear floor space in family bathroom lav / family bathroom mirror > 40" to reflective surface / rest of building final OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection FHZ= by FIREDEPT is not Completed yet, External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ELECTRIC TECH INC. Electrical Final Inspection is not Completed yet, ELECTRICITY ELECTRICAL SOLUTIONS LLC Electrical Final Inspection is not Completed yet, AIRTECH MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, WESTSIDE PLUMBING LTD Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7667096 |
FIRST GENERAL SERVICES FRONT RANGE | BFR | P | 02/22/2023 | wall removed from storage/office next to front entrance / remaining framing items verified from above wall / no engineering required for electric transformer - relocated / rest of frame OK pending other required inspections | LONNYS | LONNYS | | BFR | P | 7667082 |
FIRST GENERAL SERVICES FRONT RANGE | BFR | P | 08/31/2022 | will need to provide engineering for electric transformer connection framing and have inspected | LONNYS | LONNYS | | BFR | P | 7501415 |
FIRST GENERAL SERVICES FRONT RANGE | BFR | P | 07/06/2022 | INTERIOR LIGHT GAUGE STEEL FRAMING ONLY // attach electric permit / still need to inspect family room, both bathrooms, 2 large west party rooms, storage room and go cart room / still need to inspect all hard lids / cafe soffits OK / rest of interior light gauge wall framing OK at areas not noted / no reps on site to review accessible and life safety elements / pending other required inspections | LONNYS | LONNYS | | BFR | P | 7436320 |
FIRST GENERAL SERVICES FRONT RANGE | BFR | R | 07/01/2022 | need to attach MEP permits / no inspection performed - no approved architectural plans on file - no PPRBD approved plans on site / | LONNYS | LONNYS | | BFR | R | 7432835 |
ELECTRIC TECH INC. | E= | C | 02/24/2023 | Corrections made / Splice & 175 amp brkr plug from MDP to P-LA / Pictures sent to phone | BRETC | BRETC | | E= | C | 7669120 |
ELECTRICITY ELECTRICAL SOLUTIONS LLC | E= | C | 02/22/2023 | electrical was completed by Electric Tech | MATTHEW | MATTHEW | | E= | C | 7667920 |
ELECTRIC TECH INC. | E= | P | 02/22/2023 | Need to see brkr plug ---------------------------------------- Need to check on plans splice...................... Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | BRETC | BRETC | | E= | P | 7666941 |
ELECTRIC TECH INC. | E= | P | 02/21/2023 | Brkr lock installed / Need to see brkr plug ----------------------------------------Need to GFCI protect 3 phase 50 amp receptacle, (electrician said they are removing it). --- Need to check on plans splice...................... Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | BRETC | BRETC | | E= | P | 7665136 |
ELECTRIC TECH INC. | E= | P | 02/17/2023 | Need to install breaker lock properly for transformer --- Need to GFCI protect 3 phase 50 amp receptacle, (electrician said they are removing it). --- Need to check on plans splice...................... Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / | AARONR | AARONR | | E= | P | 7663943 |
ELECTRIC TECH INC. | E= | P | 02/06/2023 | Need to hard wire multiple 208v kitchen equipment. --- Still need kitchen transformer breaker --- Need past inspections splice for panel & transformer --- Need breaker blanks --- Need AIC rating on all panels.................Other corrections made. | AARONR | AARONR | | E= | P | 7654459 |
ELECTRIC TECH INC. | E= | P | 01/31/2023 | Need kitchen transformer breaker lock installed / Need all equipment placed / Need past inspections splice for panel & transformer / Remove all temp lighting and cords in open ceilings / Need all permanent lighting/drivers installed / Label panels - Need arc flash and AIC / Label transformers do not stack | BRETC | BRETC | | E= | P | 7649644 |
BJ COMPANY, LLC | E= | C | 01/30/2023 | FIRE ALARM INSPECTION: Rough in complete | BRETC | BRETC | | E= | C | 7648142 |
ELECTRIC TECH INC. | E= | P | 01/30/2023 | Need past inspections / Remove all temp lighting and cords in open ceilings / Tamper resist all receptacles be 5'-6" in open areas / Need access to under center floor for rough wiring / GRC to exit lights / Need manufacture specs on hard wired ovens / Need all permanent lighting/drivers installed / Label panels - Need arc flash and AIC / Label transformers do not stack | BRETC | BRETC | | E= | P | 7648140 |
BJ COMPANY, LLC | ER | P | 01/27/2023 | FIRE ALARM INSPECTION: Kitchen and party room ceilings only | BRETC | BRETC | | ER | P | 7647372 |
ELECTRIC TECH INC. | E= | P | 01/27/2023 | Need GFCI protection on 3 - 3ph ovens / GFCI protect 6' from sinks in front area of kitchen | BRETC | BRETC | | E= | P | 7647368 |
ELECTRIC TECH INC. | EP | P | 01/27/2023 | Need correct wire and brkr sizes for panel and transformer TA & LA installed, bond #4 / 225 brkr 2/0cu - 1 set #350cu to panels installed / | BRETC | BRETC | | EP | P | 7647364 |
ELECTRIC TECH INC. | ER | P | 01/27/2023 | Back ceilings in kitchen and party rooms only | BRETC | BRETC | | ER | P | 7647354 |
ELECTRIC TECH INC. | EP | P | 01/26/2023 | Splice panel LA transformer to show 112.5kva, 150kva shown / Need to see in both transformers / Panels HA, LA sec 1&2 & Kitchen 1&2 - Ok | BRETC | BRETC | | EP | P | 7645296 |
BJ COMPANY, LLC | ER | P | 12/28/2022 | FIRE ALARM INSPECTION: Wire routing and strapping in bar joists OK. | AARONR | AARONR | | ER | P | 7620877 |
BJ COMPANY, LLC | ER | R | 12/22/2022 | FIRE ALARM INSPECTION: Need point of contact to meet and show where rough wiring is located | BRETC | BRETC | | ER | R | 7619199 |
5280 ELECTRIC INC. | ER | P | 10/14/2022 | Consult on LED driver only | BRETC | BRETC | | ER | P | 7550567 |
5280 ELECTRIC INC. | ER | P | 10/12/2022 | Kitchen walls only / Discussed accessibility and GFCI requirements with contractor / | BRETC | BRETC | | ER | P | 7548316 |
5280 ELECTRIC INC. | ER | P | 10/04/2022 | Job take over, reviewed areas to know they were passed | BRETC | BRETC | | ER | P | 7538498 |
ELECTRICITY ELECTRICAL SOLUTIONS LLC | ER | P | 08/31/2022 | Fire alarm contractor will need to attach to permit | BRETC | BRETC | | ER | P | 7501721 |
ELECTRICITY ELECTRICAL SOLUTIONS LLC | ER | P | 08/30/2022 | All switches will need to be 48" to top per ADA / classroom & office walls - ok | BRETC | BRETC | | ER | P | 7500705 |
AIRTECH MECHANICAL, INC. | H= | C | 03/03/2023 | MECHANICAL CONTRACTOR FINAL OK/ | JONH | JONH | | H= | C | 7676486 |
AIRTECH MECHANICAL, INC. | H= | P | 03/03/2023 | test and balance report received pending review/ will schedule on-site inspection for today/ | JONH | JONH | | H= | P | 7676064 |
AIRTECH MECHANICAL, INC. | H= | P | 02/28/2023 | TEST AND BALANCE REPORT REVIEW: RTU-4 GRILL 14 AND 15 ARE NOT PER THE DESIGN CFM'S AND ARE OUTSIDE THE 10% +/- OF THE DESIGN CFM'S ALLOWED / NEED REVISED TEST AND BALANCE REPORT OR ENGINEER TO APPROVE THE READINGS / | LIDO | LIDO | | H= | P | 7671962 |
AIRTECH MECHANICAL, INC. | H= | P | 02/27/2023 | TEST AND BALANCE REPORT IS BEING REVIEWED / | LIDO | LIDO | | H= | P | 7670708 |
AIRTECH MECHANICAL, INC. | H= | P | 02/24/2023 | SPLICE ON FILE FOR ADDED WALK IN FREEZER / PICTURES OF CORRECTIONS MADE FROM LAST INSPECTION RECEIVED. SEE IMAGES / FINAL PENDING: NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7669310 |
AIRTECH MECHANICAL, INC. | H= | P | 02/16/2023 | PER CONVERSATION WITH MECHANICAL CONTRACTOR, DUCT DETECTORS ARE BEING MONITORED BY AN ALARM PANEL / FINAL PENDING THE FOLLOWING: STILL NEED PLAN SPLICE FOR ADDED WALK IN FREEZER. SPLICE MUST INCLUDE REFRIGERATION CALCULATIONS / FREEZER CONDENSATE PIPING MUST EXTEND ALL THE WAY THROUGH THE EXTERIOR WALL / MISSING RETURN AIR FOR THE THREE OFFICES BEHIND THE FRONT DESK / NEED TEST AND BALANCE REPORT | LIDO | LIDO | | H= | P | 7663503 |
AIRTECH MECHANICAL, INC. | HD | C | 02/16/2023 | DUCT ROUGH COMPLETE / | LIDO | LIDO | | HD | C | 7663490 |
AIRTECH MECHANICAL, INC. | HRP | P | 02/13/2023 | ADD WALK IN COOLER AND CONDENSER TO SCOPE OF WORK / LABEL WALK IN CONDENSER ON ROOF /
| LIDO | LIDO | | HRP | P | 7660863 |
AIRTECH MECHANICAL, INC. | HRP | P | 02/13/2023 | ADD WALK IN COOLER AND CONDENSER TO SCOPE OF WORK / LABEL WALK IN CONDENSER ON ROOF /
| LIDO | LIDO | | HRP | P | 7660864 |
AIRTECH MECHANICAL, INC. | HD | P | 02/13/2023 | ROOF INSPECTION ONLY: ADD 2 EXHAUST FANS TO SCOPE OF WORK / EF-1 AND EF-2 EXHAUST FANS OK / | LIDO | LIDO | | HD | P | 7660862 |
AIRTECH MECHANICAL, INC. | HRP | P | 01/31/2023 | NEED REVISED AND APPROVED PLAN SPLICE SUBMITTED TO PLAN REVIEW FOR APPROVAL FOR ADDED WALK IN COOLER INSTALLED IN THE BACK OF SPACE / SUPPORT LINE SET / ADD WALK IN COOLER AND CONDENSER TO SCOPE OF WORK / INSULATE ALL EXPOSED SUCTION LINE COPPER /
| LIDO | LIDO | | HRP | P | 7649391 |
AIRTECH MECHANICAL, INC. | HD | P | 01/31/2023 | NO ROOF TODAY AND STILL NEED FINAL INSIDE WALK / RTU-1:MISSING ALL TRANSFER AIR. NEED TO VERIFY SUPPLY INSTALLED FOR LASER TAG AREA. REST OF SUPPLY FLEX AND GRILLS OK / RTU-2 : MISSING SUPPLY FOR CHECK IN AREA. MISSING TRANSFER AIR. REST OF SUPPLY FLEX AND GRILLS OK / RTU-3: SUPPLY, RETURN DUCT ROUGH, GRILLS AND REGISTERS OK / RTU-4: 8" X 10" SUPPLY DUCT ROUGH AND BRANCH LINES ARE NOT INSTALLED. NO TRANSFER AIR INSTALLED (fyi- there is not drop ceiling grid installed in the area shown on plans)/ | LIDO | LIDO | | HD | P | 7649386 |
AIRTECH MECHANICAL, INC. | HD | P | 12/21/2022 | CHANGES THAT ARE BEING MADE TO RTU SUPPLY DROPS WILL REQUIRE THE ENGINEER TO ADDRESS / RTU-1 / RTU-4 SUPPLY MAIN TRUNK LINE AND LATERAL RUN OUTS ABOVE DROP GRID CEILING OK / EF-1 DUCT ROUGH OK / | LIDO | LIDO | | HD | P | 7618039 |
WESTSIDE PLUMBING LTD | P= | C | 03/22/2023 | Corrections complete | FRANKM | FRANKM | | P= | C | 7694311 |
WESTSIDE PLUMBING LTD | P= | P | 03/20/2023 | Drawing revision splice not complete @ this time , currently processing | FRANKM | FRANKM | | P= | P | 7691621 |
WESTSIDE PLUMBING LTD | PTO | C | 02/24/2023 | Corrections complete via images | FRANKM | FRANKM | | PTO | C | 7669512 |
WESTSIDE PLUMBING LTD | P= | P | 02/24/2023 | Need current H2O piping revision plan (approved by RBD) reducing water main size & relocating family bathroom H.C. lav | FRANKM | FRANKM | | P= | P | 7669503 |
WESTSIDE PLUMBING LTD | PB | C | 02/24/2023 | Note #9 , drwg. P0.00 allows trap guards | FRANKM | FRANKM | | PB | C | 7669223 |
WESTSIDE PLUMBING LTD | P= | P | 02/21/2023 | 15" side clearance required @ family restroom lav / extend 3-compartment sink drain to floor sink / pipe protect 1-1/2" water entry copper through concrete / support overhead pex to code / need current H2O piping revision plan (approved by RBD) / need letter from engineer accepting trap guards in lieu of trap primers , rest ok | FRANKM | FRANKM | | P= | P | 7666337 |
WESTSIDE PLUMBING LTD | P= | P | 02/16/2023 | Complete PB / complete PTO / approved current piping revision splice drawing required for H2O install / correct drainage fittings required on 3-compartment sink / leak @ 3-compartment sink / water heater not piped to contract drawings / 60'' clearance required @ family rstrm. water closet / 15" center minimum on family restroom lav / backflow prevention devices required @ beverage dispenser H2O x 2 / exposed lav plumbing requires insulation @ mens room / caulk water closets in mens & family restrooms / 17" max. rim height @ H.C. urinal / trap guard required @ mens rstrm. / leak @ water entry / terminate water entry backflow drain to approved location / pipe protect 1-1/2" water entry through concrete
| FRANKM | FRANKM | | P= | P | 7663187 |
WESTSIDE PLUMBING LTD | PTO | P | 12/12/2022 | -Additional support required on overhead horizontal & vertical H2O per code / no shock arrestor piping installed / water heater & associated H2O piping installation incomplete / studor vent required @ bar sink - overhead DWV incomplete -In wall corrections from 11-17-22 complete -PB can be completed w/ acknowledgement from engineer of record deleting all underground plumbing work scope from water entry room (deleted per contractor)
| FRANKM | FRANKM | | PTO | P | 7608393 |
WESTSIDE PLUMBING LTD | PTO | P | 11/17/2022 | Complete install of " mickey mouse" H2O piping supports / insulate H2O / pipe protection from drywall screws required in mens restroom & kitchen walls prior to drywall / drinking fountain in same walls require plumbing rough in & test prior to drywall / in wall H2O recirculation lines w/ in 24" of lav deleted (acknowledgement from engineer required for deletion) OK on in wall DWV & H2O test only in mens restroom , womens restroom (minus drinking fountain) & kitchen Note : overhead DWV & H2O rough in incomplete / shock arrestors relocated to ceilings / ensure plumbing fixture accessibility requirements @ final / no corrections from 8/10/22 visit @ this time | FRANKM | FRANKM | | PTO | P | 7587001 |
WESTSIDE PLUMBING LTD | PTO | P | 11/16/2022 | Nail protect DWV & H2O throughout / shock arrestor required @ family bathroom water closet / access required for all shock arrestors / attach "mickey mouse" H2O supports through studs / support vertical pex above ceilings to code Note : no correction from 8/10/22 visit @ this time | FRANKM | FRANKM | | PTO | P | 7585526 |
LEO'S SEWER AND DRAIN, INC. | PB | P | 08/10/2022 | Need letter from engineer accepting trap guards in floor drains in lieu of trap primers (proceed @ own risk) OK on underground DWV minus west fire entry room / ABS replaced from previous corrections comment / no commercial dishwasher | FRANKM | FRANKM | | PB | P | 7478165 |
LEO'S SEWER AND DRAIN, INC. | PB | P | 07/28/2022 | Looked at family bathroom and floor sink to cafe on same line only: Need engineer approval for Cell Core PVC ( drawings say no foam core allowed ) / test ok. | DANR | DANR | | PB | P | 7462751 |
WESTSIDE PLUMBING LTD | XPS | T | 03/16/2023 | PAID (REC#1940539): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 4 revisions: Adjusted sheet P1.00, P1.00A, P2.00 and P2.00A. | SHANEN | SHANEN | | XPS | T | 7689535 |
FIRST GENERAL SERVICES FRONT RANGE | XBS | T | 02/28/2023 | PAID (REC#1938524) PLAN SPLICE FEE: $50 by: DANM for Construction: Party Room added with 16 additional occupants. This does not affect the egress capacity of the space and the plumbing fixture occupant load count is capped at 910, so that is not affected either. | DANM | DANM | | XBS | T | 7672728 |
BJ COMPANY, LLC | XES | P | 02/22/2023 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Revised one-line. | DANIELG | DANIELG | | XES | P | 7666856 |
AIRTECH MECHANICAL, INC. | XMS | T | 02/21/2023 | PAID (REC#1934649) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Clouds | DALEH | DALEH | | XMS | T | 7666512 |
WESTSIDE PLUMBING LTD | XPS | T | 02/17/2023 | PAID (REC#1934325) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P1.00, P1.00A, P2.00 and P2.00A. | SHANEN | SHANEN | | XPS | T | 7663823 |
AIRTECH MECHANICAL, INC. | XMS | T | 02/15/2023 | PAID (REC#1933517): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Clouds | DALEH | DALEH | | XMS | T | 7662614 |
FIRST GENERAL SERVICES FRONT RANGE | XBS | T | 01/23/2023 | PAID (REC#1932448) PLAN SPLICE FEE: $50 by: DANM for Construction: There is an existing free standing sign that was originally reviewed and permitted by zoning as a wall sign. THis splice is to add engineer structure to the existing sign to further stabilize it. | DANM | DANM | | XBS | T | 7641337 |
ELECTRICITY ELECTRICAL SOLUTIONS LLC | XES | T | 11/21/2022 | PAID (REC#1932449) PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Revised one-line and panel schedules. | DANIELG | DANIELG | | XES | T | 7588780 |