WESTERN STATES MANAGEMENT GROUP LLC | B= | C | 04/03/2023 | All other required Final inspections are complete. (This is a computer generated result) | JASONL | JASONL | | B= | C | 7705883 |
WESTERN STATES MANAGEMENT GROUP LLC | B= | P | 04/03/2023 | Complete outstanding inspections / Final OK pending the completion of required outside agency inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | JASONL | JASONL | | B= | P | 7705430 |
WESTERN STATES MANAGEMENT GROUP LLC | BSP | P | 03/22/2023 | Observed membrane penetrations at corridor wall | JASONL | JASONL | | BSP | P | 7694979 |
WESTERN STATES MANAGEMENT GROUP LLC | BFR | P | 03/10/2023 | Framing at entry door 006 / Observed horizontal framing at entry 006 per approved design / Observed gyp and gyp fastening bottom of horizontal assembly / pending other rough inspections | JASONL | JASONL | | BFR | P | 7684251 |
WESTERN STATES MANAGEMENT GROUP LLC | BFR | R | 03/09/2023 | Framing at entry door 006 / Not per approved design / Need to revise approved design to match as built conditions to include horizontal assembly / pending other rough inspections | JASONL | JASONL | | BFR | R | 7682541 |
WESTERN STATES MANAGEMENT GROUP LLC | BSP | P | 03/08/2023 | Observed gyp and gyp fastening interior side of corridor wall per UL U465 | JASONL | JASONL | | BSP | P | 7681095 |
WESTERN STATES MANAGEMENT GROUP LLC | BSP | P | 03/07/2023 | Observed corridor framing and gyp and gyp fastening corridor side per UL U465 / Need to revise approved design to reflect as built conditions at corridor and horizontal assembly added at eastern most entry door / Still need to inspect gyp and gyp fastening at unit side of corridor wall / pending other roguh inspections | JASONL | JASONL | | BSP | P | 7679058 |
WESTERN STATES MANAGEMENT GROUP LLC | BFR | P | 03/02/2023 | PARTIAL / INTERIOR LIGHT GAUGE PARTITION FRAMING / Observed interior light gauge partition framing excluding corridor wall / Still need to inspect corridor wall framing / Need to attach electrical to permit and complete rough inspections / Pending other rough inspections / | JASONL | JASONL | | BFR | P | 7675400 |
NO SHOCKS ELECTRIC LLC | E= | C | 03/22/2023 | Electrical ok / Floor receptacles deleted / | ROB | ROB | | E= | C | 7695544 |
NO SHOCKS ELECTRIC LLC | ER | P | 03/21/2023 | Ceiling ok -- leave tile out for FA at 2 locations / If room is 1000sq. ft. or more the floor receptacles can not be deleted / | ROB | ROB | | ER | P | 7693381 |
NO SHOCKS ELECTRIC LLC | ER | P | 03/03/2023 | Wall rough OK. | AARONR | AARONR | | ER | P | 7677050 |
MICK HEATING & SHEET METAL CO. | H= | C | 03/28/2023 | Received the TAB report, see images / Mechanical Final Ok / | SAMS | SAMS | | H= | C | 7699782 |
MICK HEATING & SHEET METAL CO. | H= | P | 03/27/2023 | PICTURES RECEIVED OF LABELED FIRE DAMPER ACCESS DOOR. THERMOSTAT AND CO2 SENSORS / FINAL PENDING: NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7699549 |
MICK HEATING & SHEET METAL CO. | H= | P | 03/21/2023 | FINAL PENDING: LABEL FIRE DAMPER ACCESS DOOR / MISSING (E) FAN BOX CO2 CENSOR / MISSING (N) VAV-1 TEMPERATURE CENSOR / OK TO ATTACH CORRECTIONS TO AN INSPECTION REQUEST / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7694143 |
MICK HEATING & SHEET METAL CO. | HD | C | 03/21/2023 | NEW VAV-1, DUCT ROUGH, FLEX DUCT GRILLS AND REGISTERS OK / | LIDO | LIDO | | HD | C | 7694142 |
MICK HEATING & SHEET METAL CO. | HD | P | 03/02/2023 | CORRECTED GREENHECK FIRE DAMPER FRAMING FOR VAV-1 OK, AT NEXT INSPECTION REQUEST VERIFY RETAINING ANGLE AND FIRE DAMPER ACCESS DOOR. | TREVORH | TREVORH | | HD | P | 7674806 |
MICK HEATING & SHEET METAL CO. | HD | P | 02/28/2023 | PLAN SHOW FOUR NEW FIRE DAMPERS TO BE INSTALLED. PER CONVERSATION WITH GENERAL AND MECHANICAL CONTRACTOR 3 OF THE FOUR DAMPER ARE EXISTING. WILL NEED ENGINEER TO ADDRESS IF NOT INSTALLED PER PLAN / FIRE DAMPER FRAMING INSPECTION: VAV-1 M/P SUPPLY FIRE DAMPER FRAMING IS NOT PER MANUFACTURER REQUIREMENTS / RETURN AIR TRANSFER FIRE DAMPER ( key note 5) FRAMING UNDER DAMPER OK / | LIDO | LIDO | | HD | P | 7672620 |
MICK HEATING & SHEET METAL CO. | HSP | P | 01/26/2023 | CONSULT ON MECHANICAL PLANS, FIRE DAMPER FRAMING AND DAMPER INSTALL: PLAN SHOW FOUR NEW FIRE DAMPERS TO BE INSTALLED. PER CONVERSATION WITH GENERAL AND MECHANICAL CONTRACTOR 3 OF THE FOUR DAMPER ARE EXISTING. WILL NEED ENGINEER TO ADDRESS IF NOT INSTALLED PER PLAN / | LIDO | LIDO | | HSP | P | 7645896 |
NO SHOCKS ELECTRIC LLC | XES | T | 03/30/2023 | PAID (REC#1943391) PLAN SPLICE FEE: $50 by: RICHG for Electrical: REVISED ELECTRICAL PLAN. NO OUTLETS IN FLOOR SUITE 240. | RICHG | RICHG | | XES | T | 7703027 |
WESTERN STATES MANAGEMENT GROUP LLC | XBS | T | 03/09/2023 | PAID (REC#1938610) PLAN SPLICE FEE: $50 by: CHRISTINEH for Construction: Provided stamped detail for damper/doorway transition | CHRISTINEH | CHRISTINEH | | XBS | T | 7683023 |
MICK HEATING & SHEET METAL CO. | XMS | T | 02/28/2023 | PAID (REC#1936156) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice | TCRIPPEN | TCRIPPEN | | XMS | T | 7672572 |