HILL COMMERCIAL CONSTRUCTION, LLC | B= | C | 07/17/2023 | Items corrected / | ERIKK | ERIKK | | B= | C | 7799705 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | P | 07/17/2023 | Med gas fire stop ok / | ERIKK | ERIKK | | BSP | P | 7799704 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | P | 04/06/2023 | site visit to review firestop details in med gas closet and floor/ceiling penetrations and med gas lid / observed non rated electric box in wall of med gas room | LONNYS | LONNYS | | BSP | P | 7709217 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | P | 04/03/2023 | med gas room gyp attachment 3rd layer of ULIX OK per UL I506 - still need to complete mud and tape as well as fire stop all penetrations (provide firestop details for vent as well as A/C line and copper pipes penetrating to 3rd floor mech room) | LONNYS | LONNYS | | BSP | P | 7705682 |
HILL COMMERCIAL CONSTRUCTION, LLC | B= | P | 04/03/2023 | pending other required inspections / still need to complete med gas room items noted in BSP inspection 4-3-2023 / missing international sign of accessibility at rest room / missing 60" clear floor space at water closet / rest OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: rdassero@springsgov.com or 385-5982, x2), External Agency Inspection FHZ= by FIREDEPT is not Completed yet, PINE VALLEY ELECTRIC, INC. Electrical Final Inspection is not Completed yet, REEVES SPECIALTY SERVICES, INC. Mechanical Final Inspection is not Completed yet, BULLETPROOF PLUMBING AND HEATING INC. Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7705670 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | P | 03/31/2023 | GYP INSPECTION / I506 - MED GAS / observed 2nd layer 5/8" USG ULIX gyp at horizontal assembly / pending any other outstanding inspections | BRIANB | BRIANB | | BSP | P | 7704114 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | P | 03/30/2023 | GYP INSPECTION / I506 - MED GAS / observed 1st layer 5/8" USG ULIX gyp at horizontal assembly / pending any other outstanding inspections | BRIANB | BRIANB | | BSP | P | 7702592 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | R | 03/29/2023 | not ready for inspection / reviewed UL I506 with site rep for proprietary requirements | LONNYS | LONNYS | | BSP | R | 7701728 |
HILL COMMERCIAL CONSTRUCTION, LLC | BSP | P | 03/09/2023 | MED GAS WALL GYP ATTACHMENT / pedning other required inspections / wall gyp attachment OK per UL U419 / contractor to provide verification of existing wall type in hall adjacent too electric room | LONNYS | LONNYS | | BSP | P | 7683172 |
HILL COMMERCIAL CONSTRUCTION, LLC | BFR | P | 02/16/2023 | pending other required inspections / still need to address all med gas room corrections from previous inspection / all other hard lids and soffit framing OK | LONNYS | LONNYS | | BFR | P | 7663341 |
HILL COMMERCIAL CONSTRUCTION, LLC | B= | R | 02/07/2023 | not ready for building final. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection FHZ= by FIREDEPT is not Completed yet, PINE VALLEY ELECTRIC, INC. Electrical Final Inspection is not Completed yet, BULLETPROOF PLUMBING AND HEATING INC. Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | R | 7655303 |
HILL COMMERCIAL CONSTRUCTION, LLC | BFR | R | 02/07/2023 | still need to attach mech permit / med gas room horizontal assembly framing -- 2" strap to attached on top flange of 6" framing members - reviewed UL I506 with site rep // med gas wall gyp attachment -- observed american type X gyp - not approved per UL U419 | LONNYS | LONNYS | | BFR | R | 7655295 |
HILL COMMERCIAL CONSTRUCTION, LLC | BFR | P | 01/27/2023 | interior wall framing okay, framing for hard lid ceiling will need a 2" strap installed on the top / will need to verify that a UL I506 horizontal assembly is approved to allow a fire damper installed through it to plenum / need to attach mech to permit | BOBF | BOBF | | BFR | P | 7647148 |
PINE VALLEY ELECTRIC, INC. | E= | C | 04/03/2023 | all VAV ok | CRAIG | CRAIG | | E= | C | 7705760 |
PINE VALLEY ELECTRIC, INC. | E= | P | 03/29/2023 | Need proper working clearance on disconnects for compressor, vacuums x2, and water heater. --- Need proper labeling on panels, transformers and disconnects. | AARONR | AARONR | | E= | P | 7701548 |
PINE VALLEY ELECTRIC, INC. | E= | P | 03/28/2023 | Need panel schedules --- Need front entry lighting...............................Everything else OK> | AARONR | AARONR | | E= | P | 7700428 |
PINE VALLEY ELECTRIC, INC. | ER | C | 03/27/2023 | All above ceiling rough OK. | AARONR | AARONR | | ER | C | 7698943 |
PINE VALLEY ELECTRIC, INC. | ER | P | 03/24/2023 | Electrical above ceiling in roo 2370 OK, but need fire alarm and other low volt cable off ceiling grid................... Above ceiling rough OK in areas 238 -- 239 --- 235 -- Electrical Panel room...................15 OCP on 7 VAV's OK............Still need working clearance per last inspection on certain VAV's. | AARONR | AARONR | | ER | P | 7697640 |
PINE VALLEY ELECTRIC, INC. | ER | P | 03/23/2023 | VAV #208 will need working clearance, all VAV's will need doors open 90 degrees, leave tile out around VAV's, check grounds in VAV's / --------------Ceilings marked on drawings / ------------7 - VAV's will need 15 amp max brkrs, or fused disconnect before unit | BRETC | BRETC | | ER | P | 7696085 |
PINE VALLEY ELECTRIC, INC. | ER | P | 03/22/2023 | Need all temp lighting out of ceilings for above ceiling inspections / All VAV's will need working clearances and doors able to open 90 degrees / 7 - VAV's will need 15 amp max brkrs, or fused disconnect before unit / 4 - south room ceilings only - Ok | BRETC | BRETC | | ER | P | 7694649 |
PINE VALLEY ELECTRIC, INC. | ER | P | 02/15/2023 | All hard lids through out - Ok | BRETC | BRETC | | ER | P | 7662527 |
PINE VALLEY ELECTRIC, INC. | ES | C | 02/09/2023 | Commercial Service: 350 amp service for suite. --- No action needed by CSU. | AARONR | AARONR | | ES | C | 7657450 |
PINE VALLEY ELECTRIC, INC. | ES | P | 02/08/2023 | Commercial Service: Need to install 1/O system bonding jumper. --- 1/O will be installed to water once water is ran to suite.................................... Pics ok, upload images with next inspection request. If you encounter problems uploading images, please contact IT at 799-2688 / ............ATTENTION: Check water bonding jumper before final. | AARONR | AARONR | | ES | P | 7656484 |
PINE VALLEY ELECTRIC, INC. | ER | P | 01/23/2023 | talked about switch height with contractor and GC------top of switches are at 50"-----rest of walls ok | RANDY | RANDY | | ER | P | 7641477 |
REEVES SPECIALTY SERVICES, INC. | H= | C | 04/13/2023 | PER CONSULT WITH CHIEF MECHANICAL INSPECTOR AND BUILDING INSPECTOR, THE BUILDING INSPECTOR WILL INSPECT FIRE STOP FOR MED GAS EXHAUST DUCT PENETRATION THOUGH RATED CEILING IN MED GAS CLOSET/ MECHANICAL CONTRACTOR FINAL OK / | LIDO | LIDO | | H= | C | 7715108 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 04/12/2023 | PLAN SPLICE FOR 6"X 6" MED GAS MAKE UP AIR FIRE DAMPER INSTALLED IN WALL INSTEAD OF CEILING AND 6" MAKE UP AIR DUCT INSTALLED FROM DAMPER THROUGH STORAGE ROOM AND UP TO ABOVE CEILING PLENUM RETURN IS ON FILE / FINAL PENDING: NEED CONSULT WITH PLAN REVIEW ON DETAIL FOR MED GAS EXHAUST DUCT FIRE BARRIER WRAP PENETRATION THROUGH RATED CEILING PRIOR TO PENETRATION INSPECTION. WILL UPDATE NOTES CONSULT / | LIDO | LIDO | | H= | P | 7714165 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 04/11/2023 | UPON REVIEW VACUUM PUMP VENT IS NOT A MECHANICAL INSPECTION / FINAL PENDING THE FOLLOWING: NEED PLAN SPLICE FOR 6"X 6" MED GAS MAKE UP AIR FIRE DAMPER INSTALLED IN WALL INSTEAD OF CEILING AND 6" MAKE UP AIR DUCT INSTALLED FROM DAMPER THROUGH STORAGE ROOM AND UP TO ABOVE CEILING PLENUM RETURN / NEED ENGINEER TO PROVIDE DETAIL FOR MED GAS EXHAUST DUCT FIRE BARRIER WRAP PENETRATION THROUGH RATED CEILING / | LIDO | LIDO | | H= | P | 7712534 |
REEVES SPECIALTY SERVICES, INC. | HSP | P | 04/06/2023 | TEST AND BALANCE REPORT RECEIVED. SEE IMAGES. | LIDO | LIDO | | HSP | P | 7708757 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 04/05/2023 | EF-1 EXHAUST FIRE DAMPER INSTALLED IN CONCRETE FLOOR IS COMPLETE / THERMOSTATS OK / TU-208 OK / FINAL PENDING THE FOLLOWING: NEED CONTRACTOR INSTALLING VACUUM PUMP VENTS (plan page M103, key note 4) ATTACHED TO PERMIT, AND INSPECTION FOR SAID VENTS / NEED PLAN SPLICE FOR 6"X 6" MED GAS MAKE UP AIR FIRE DAMPER INSTALLED IN WALL INSTEAD OF CEILING AND 6" MAKE UP AIR DUCT INSTALLED FROM DAMPER THROUGH STORAGE ROOM AND UP TO ABOVE CEILING PLENUM RETURN / NEED ENGINEER TO PROVIDE DETAIL FOR MED GAS EXHAUST DUCT FIRE BARRIER WRAP PENETRATION THROUGH RATED CEILING / TEST AND BALANCE REPORT IS BEING REVIEWED / | LIDO | LIDO | | H= | P | 7707767 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 04/05/2023 | TEST AND BALANCE REPORT IS BEING REVIEWED. | LIDO | LIDO | | H= | P | 7707441 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 03/31/2023 | ROOF FINAL OK / FINAL PENDING THE FOLLOWING: NEED PLAN SPLICE FOR 6"X 6" MED GAS MAKE UP AIR FIRE DAMPER INSTALLED IN WALL INSTEAD OF CEILING AND 6" MAKE UP AIR DUCT INSTALLED FROM DAMPER THROUGH STORAGE ROOM AND UP TO ABOVE CEILING PLENUM RETURN / NEED EF-1 EXHAUST FIRE DAMPER INSTALLED IN CONCRETE FLOOR CEILING ASSEMBLY BETWEEN 2ND AND 3RD FLOOR ANGLES COMPLETED (damper labeled access door and breakaway connections ok) / NEED ENGINEER TO PROVIDE DETAIL FOR MED GAS EXHAUST DUCT FIRE BARRIER WRAP PENETRATION THROUGH RATED CEILING / TU-208 FAN BOX IS LACKING 36" REQUIRED CLEARANCE TO HIGH VOLTAGE SERVICE SIDE / SEE HWP NOTES DATED 3/31/23 / NEED CONTRACTOR INSTALLING VACUUM PUMP VENTS (plan page M103, key note 4) ATTACHED TO PERMIT, AND INSPECTION FOR SAID VENTS / NEED MED GAS ROOM FINAL, ALL THERMOSTATS AND CENSORS / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7704727 |
REEVES SPECIALTY SERVICES, INC. | HWP | P | 03/31/2023 | CONDENSATE FOR WALL HUNG MINI SPLIT CASSETTE UNIT NOT READY / CONDENSATE DISPOSAL FOR THE THREE CEILING MOUNT MINI SPLIT CASSETTE UNITS OK / | LIDO | LIDO | | HWP | P | 7704726 |
REEVES SPECIALTY SERVICES, INC. | HD | C | 03/31/2023 | MED GAS ROOM : 6"X 6" MAKEUP AIR FIRE DAMPER INSTALLED IN WALL AND 6" DUCT UP TO ABOVE CEILING PLENUM RETURN OK . NEED PLAN SPLICE FOR THIS CHANGE / MED GAS EXHAUST DUCT FIRE BARRIER WRAP OK. EXHAUST DUCT FIRE BARRIER WRAP PENETRATION THROUGH CONCRETE FLOOR OK / MED GAS ROOM RATED CEILING: STILL NEED EXHAUST DUCT FIRE BARRIER WRAP PENETRATION THROUGH RATED GAS CEILING ADDRESSED BY ENGINEER.
| LIDO | LIDO | | HD | C | 7704539 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/30/2023 | MED GAS EXHAUST FIRE BARRIER WRAP: ON 3RD FLOOR STARTING 3 FEET FROM THE FLOOR WRAP INSTALL UP TO ROOF OK. STILL NEED 2ND FLOOR / EF-1: NEED TO COMPLETE FIRE DAMPER INSTALL AT FLOOR PENETRATION FROM 2ND TO 3RD FLOOR EXHAUST DUCT ROUGH OK. / ALL SUPPLY, RETURN AND EXHAUST GRILLS AND REGISTERS OK / | LIDO | LIDO | | HD | P | 7703158 |
REEVES SPECIALTY SERVICES, INC. | HRP | C | 03/29/2023 | REFRIGERATION LINE SETS: CORRECTIONS MADE / WILL INSPECT HEAT PUMP DURING ROOF FINAL (will need heat pump install instructions for inspection)/ SEE HWP NOTES FOR CONDENSATE DISPOSAL FOR MINI SPLIT CASSETTE UNITS / | LIDO | LIDO | | HRP | C | 7702143 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/29/2023 | NOT READY FOR FINAL. CHANGED TO HD TYPE INSPECTION / MED GAS ROOM: EXHAUST DUCT FIRE BARRIER WRAP ABOVE RATED CEILING ONLY OK. / 6" X 6" MAKE UP AIR FIRE DAMPER FRAMING IN WALL OK.STILL NEED PLAN SPLICE FOR MAKE UP AIR 6" X 6" FIRE DAMPER BEING INSTALLED IN WALL / EF-1 BATHROOM EXHAUST: 16" X 16" FIRE DAMPER INSTALLED IN 16 GAUGE SLEEVE OK. INSTALL DAMPER AT OWN RISK DUE TO SPLICE FOR SAID DAMPER NOT ON FILE. / | LIDO | LIDO | | HD | P | 7702140 |
REEVES SPECIALTY SERVICES, INC. | HWP | P | 03/28/2023 | STILL NEED CONDENSATE DISPOSAL FOR ALL THREE MINI SPLIT CEILING INSTALLED CASSETTE UNITS AND WALL HUNG CASSETTE UNIT IN IT CLOSET 240 / | LIDO | LIDO | | HWP | P | 7700806 |
REEVES SPECIALTY SERVICES, INC. | HRP | P | 03/28/2023 | STILL NEED LINE SET SUPPORTED BY ALL THREE MINI SPLIT CASSETTE UNITS/ STILL NEED CONDENSER (heat pump) INSPECTION ON ROOF / | LIDO | LIDO | | HRP | P | 7700805 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/28/2023 | MED GAS EXHAUST DUCT FIRE BARRIER WRAP INSPECTION: NOT READY / MED GAS MAKE UP AIR FIRE DAMPER IN WALL FRAMING: NOT DONE PER MANUFACTURER REQUIREMENTS ( went over install instructions with G/C and mechanical contractor). NEED PLAN SPLICE FOR MAKE UP AIR 6" X 6" FIRE DAMPER NOW BEING INSTALLED IN WALL / | LIDO | LIDO | | HD | P | 7700791 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/27/2023 | CHANGED TO HD. NOT READY FOR FINAL / MED GAS EXHAUST DUCT: PICTURES RECEIVED OF MED GAS 6" EXHAUST DUCT INSTALLED FROM 2ND FLOOR ELECTRICAL ROOM TO ROOF. SEE IMAGES.MED GAS EXHAUST DUCT ROUGH OK. OK TO INSTALL FIRE BARRIER WRAP/ MED GAS ROOM EXHAUST FIRE BARRIER WRAP INSPECTION: WRAP IN MED GAS ROOM HAS BANDS THAT ARE SPACED GREATER THAN 1.5" FROM FROM BUTT END. WILL NEED ACCESS ABOVE MED GAS CEILING FOR WRAP INSTALL INSPECTION. WRAP INSTALLED ABOVE DROP CEILING JUST OUTSIDE MED GAS ROOF IS NOT PER MANUFACTURER REQUIREMENTS. STOPPED INSPECTION. CONTRACTOR INSTALLING FIRE BARRIER WRAP MUST REVIEW INSTALL INSTRUCTIONS AND INSTALL PER MANUFACTURER REQUIREMENTS. RE-INSPECT ALL /
| LIDO | LIDO | | HD | P | 7698951 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/24/2023 | MED GAS PARTIAL EXHAUST DUCT INSTALL: STILL NEED MED GAS EXHAUST DUCT IN 2ND FLOOR ELECTRIC ROOM AND FROM 3RD FLOOR CORRIDOR UP TROUGH ROOF / 3RD FLOOR MED GAS EXHAUST DUCT FROM ELECTRIC ROOM TO CORRIDOR OK./ SUPPLY REGISTERS AND RETURN LAY-IN GRILLS OK EXCEPT FOR ROOM 203, 237, 239, 240 AND CORRIDOR BY TU-208 / | LIDO | LIDO | | HD | P | 7698136 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/23/2023 | TU-208 FAN BOX IS LACKING 36" REQUIRED CLEARANCE TO HIGH VOLTAGE SERVICE SIDE / MEDIUM PRESSURE DUCT ROUGH COMPLETE EXCEPT FOR M/P TO VAV TU-208 /
| LIDO | LIDO | | HD | P | 7696897 |
REEVES SPECIALTY SERVICES, INC. | HRP | P | 03/23/2023 | 500LB TEST OK / STILL NEED ALL LINE SET CONNECTIONS TO CASSETTE UNITS/ NEED TO ADD SUPPORT FOR REFRIGERATION LINE SETS THROUGHOUT THE ENTIRE INSTALL WITH SPACING NO GREATER THAN 6 FEET / FIX LINE SET INSULATION IN 2ND FLOOR ELECTRICAL ROOM, CONNECTIONS TO CASSETTE UNITS AND ON 3RD FLOOR ABOVE CEILING IN ROOM WHERE LINE SET SET ROUTES TO ROOF / | LIDO | LIDO | | HRP | P | 7696896 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/23/2023 | EF-1 DUCT ROUGH ON 2ND FLOOR ONLY OK / TU-201, 203, 207 - BOX, M/P AND L/P DUCT ROUGH OK / TU-205 - BOX AND L/P DUCT ROUGH OK/ | LIDO | LIDO | | HD | P | 7696855 |
REEVES SPECIALTY SERVICES, INC. | HRP | P | 03/22/2023 | Condensing unit on roof is a heat pump, provide manufacturer’s instructions at inspection to verify how high above grade condenser is to be set to properly drain during defrost cycle. | LIDO | LIDO | | HRP | P | 7695575 |
REEVES SPECIALTY SERVICES, INC. | HWP | P | 03/22/2023 | STILL NEED CONDENSATE PIPING INSTALLED AND INSPECTED. SEE KEY NOTE 1 / | LIDO | LIDO | | HWP | P | 7694929 |
REEVES SPECIALTY SERVICES, INC. | HRP | P | 03/22/2023 | LOW PRESSURE TEST (per contractor test will be set at 500 lb's) / STILL NEED ALL LINE SET CONNECTIONS TO CASSETTE UNITS/ NEED TO ADD SUPPORT FOR REFRIGERATION LINE SETS THROUGHOUT THE ENTIRE INSTALL WITH SPACING NO GREATER THAN 6 FEET / FIX LINE SET INSULATION IN 2ND FLOOR ELECTRICAL ROOM, CONNECTIONS TO CASSETTE UNITS AND ON 3RD FLOOR ABOVE CEILING IN ROOM WHERE LINE SET SET ROUTES TO ROOF / | LIDO | LIDO | | HRP | P | 7694920 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/22/2023 | MED GAS EXHAUST DUCT: STILL NEED MED GAS EXHAUST DUCT INSTALLED FROM 2ND FLOOR ELECTRICAL ROOM TO ROOF / DUCT FROM MED GAS ROOM TO ELECTRICAL ROOM ONLY OK / | LIDO | LIDO | | HD | P | 7694899 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/16/2023 | DUCT ROUGH : PARTIAL MEDIUM PRESSURE (M/P) DUCT ROUGH OK / TU-200,202, 209 AND 211 FAN, M/P AND L/P DUCT ROUGH OK / TU-203 FAN AND L/P DUCT ROUGH OK (still need M/P duct )/ TU-204 MISSING 6" SUPPLY BRANCH INSTALLED / | LIDO | LIDO | | HD | P | 7689872 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/13/2023 | ENGINEER TO ADDRESS THE FOLLOWING (PLAN PAGE M-101 MED GAS ROOM): PLAN SHOWS MAKE UP AIR FROM STORAGE SPACE. MAKE UP AIR STREAM MUST BE FROM OUTSIDE. PER IMC CODE SECTION 502.9.1 BOTH AIR STREAM DUCTS (exhaust and make up air) SHALL BE ENCLOSED IN A 1-HOUR RATED SHAFT ENCLOSURE FROM ROOM TO EXTERIOR. KEY NOTE 3 SHOWS 1 LAYER OF 3M 615 TO BE INSTALLED ON THE EXHAUST DUCT, PER MANUFACTURER ONLY TWO LAYER APPLICATION IS AN APPROVED SHAFT ALTERNATIVE. HOW WILL THE DUCT PENETRATIONS, WITH FIRE BARRIER WRAP, THROUGH THE RATED MED GAS CEILING BE PROTECTED? THE WRAP MANUFACTURER DOES NOT HAVE A FIRE STOP PENETRATION DETAIL FOR A MEMBRANE PENETRATION, ONLY DETAILS FOR THOUGH PENETRATIONS. NEED ENGINEER DETAIL FOR THE MEMBRANE PENETRATIONS AND DETAIL TO BE SPECIFIC TO THE UL LISTED ASSEMBLY. ALSO SEE IMC CODE SECTION 502.8.1.1 FOR EXHAUST VENTILATION SYSTEM REQUIREMENTS AND ALL CODE SECTIONS THAT APPLY. PLANS SHOW FIRE DAMPER FOR MAKE UP AIR DUCT PENETRATION THROUGH MED GAS ROOM RATED CEILING. AS PREVIOUSLY NOTED THE MAKE UP AIR DUCT TO BE INSTALLED IN A 1-HOUR RATED SHAFT ENCLOSURE. DAMPER NOT APPROVED FOR THIS APPLICATION. NEED REVISED AND APPROVED PLANS SUBMITTED TO PLAN REVIEW FOR APPROVED ADDRESSING ALL ISSUES. / ENGINEER ALSO TO ADDRESS THE FOLLOWING (PLAN PAGE M-101 EF-4-1 EXHAUST DUCT): EXHAUST DUCT ON 2ND FLOOR PENETRATES CORRIDOR WALL INTO ELECTRICAL ROOM. IS THIS WALL RATED? IF WALL IS RATED HOW IS THIS PENETRATIONS BEING PROTECTED? PLANS WILL NEED TO SHOW RATING OF WALL. AFTER DUCT PENETRATED WALL INTO ELECTRICAL ROOM THE DUCT ROUTES UP THROUGH RATED HORIZONTAL ASSEMBLY TO 3RD FLOOR. HOW IS THE PENETRATION BEING PROTECTED? DUCT ON 3RD FLOOR PENETRATED ANOTHER CORRIDOR WALL BEFORE BEING ROUTED UP THOUGH THE ROOF. IS THE 3RD FLOOR CORRIDOR WALL RATED? IF WALL IS RATED, HOW IS THIS PENETRATIONS BEING PROTECTED? PLANS WILL NEED TO SHOW RATING OF WALL. NEED REVISED AND APPROVED PLANS SUBMITTED TO PLAN REVIEW FOR APPROVED ADDRESSING ALL ISSUES / | LIDO | LIDO | | HD | P | 7684901 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/09/2023 | DUCT ROUGH: TU-200 LOW PRESSURE SUPPLY MAIN DUCT AND LATERAL BRANCH LINES OK. OK TO INSULATE / TU-201 BOX, LOW PRESSURE SUPPLY MAIN DUCT AND LATERAL BRANCH LINES OK. OK TO INSULATE / TU-202 FAN BOX MOVED FROM CORRIDOR TO ROOM 206. NEED REVISED AND APPROVED PLANS. LOW PRESSURE SUPPLY MAIN DUCT AND LATERAL BRANCH LINES OK. OK TO INSULATE / TU-203 LOW PRESSURE SUPPLY MAIN DUCT AND LATERAL BRANCH LINES OK. OK TO INSULATE / TU-204 BOX, LOW PRESSURE SUPPLY MAIN DUCT AND LATERAL BRANCH LINES OK. OK TO INSULATE / TU-209 LOW PRESSURE SUPPLY MAIN DUCT AND LATERAL BRANCH LINES OK. OK TO INSULATE / TU-211 LOW PRESSURE SUPPLY MAIN DUCT AND LATERAL BRANCH LINES OK. OK TO INSULATE / | LIDO | LIDO | | HD | P | 7683358 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 03/08/2023 | NEED TO REVIEW MED GAS ROOM. WILL UPDATE NOTES AFTER / PER GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR CHANGES ARE BEING MADE TO THE MECHANICAL DESIGN. CHANGES WILL REQUIRE PLAN SPLICES SUBMITTED TO PLAN REVIEW FOR APPROVAL / DUCT ROUGH INSPECTION: TU-206 - MISSING 6" SUPPLY TO CORRIDOR. VAV BOX, LOW PRESSURE SUPPLY MAIN TRUNK AND REST OF BRANCH LINES OK. OK TO INSULATE / TU-208 - LOW PRESSURE SUPPLY MAIN TRUNK AND BRANCH LINES OK. OK TO INSULATE /
| LIDO | LIDO | | HD | P | 7681462 |
BULLETPROOF PLUMBING AND HEATING INC. | P= | C | 04/13/2023 | Corrections complete via images & approved splice | FRANKM | FRANKM | | P= | C | 7715029 |
BULLETPROOF PLUMBING AND HEATING INC. | P= | P | 03/31/2023 | 5'-0" clear floor space required for water closet / engineer letter required for trap primer deletion / approved drawing splice required for H2O revision of 1-1/2" water main tie into existing 2" H2O in lieu of 3" H2O per drwg. | FRANKM | FRANKM | | P= | P | 7704103 |
BULLETPROOF PLUMBING AND HEATING INC. | P= | P | 03/29/2023 | Install HB-1 & HB-2 / minimum 18" required on d.w. standpipe in Sterile 217 / shock arrestor required on d.w. H2O supply in sterile 217 / dishwasher install incomplete in break rm. / 5'-0" minimum required between toilet wall and lav counter top / trap guard or trap primer required in floor drains / complete wall box install @ mechanical rm. / complete corrections from 3-24-23 visit | FRANKM | FRANKM | | P= | P | 7701843 |
BULLETPROOF PLUMBING AND HEATING INC. | PTO | C | 03/24/2023 | -OK on L1 overhead DWV -Splice required for the following : - 1-1/2" H2O tie into existing 2" main in lieu of 3" in hallway 236 - trap guards in lieu of trap primers throughout (letter from engineer of record acceptable)
| FRANKM | FRANKM | | PTO | C | 7698176 |
BULLETPROOF PLUMBING AND HEATING INC. | PTO | T | 03/23/2023 | PAID (REC#1941660) AFTER-HOURS INSPECTION: $200 From: JANE Per Dan | JANE | JANE | | PTO | T | 7695825 |
BULLETPROOF PLUMBING AND HEATING INC. | PTO | P | 03/17/2023 | -Adjust DWV grade throughout L1 ceiling space (majority currently run flat) / vertical distance @ 3" FS-1 in rm. 234 exceeds 24" max. / need letter from engineer allowing AAV's & trap guards in lieu of trap primers Note : no access to 50% of overhead DWV @ L1 / check 1-1/2" H2O @ 3" main connection | FRANKM | FRANKM | | PTO | P | 7691052 |
BULLETPROOF PLUMBING AND HEATING INC. | PTO | P | 01/27/2023 | -Existing PVC vent in new construction area plenum ceiling observed (will need to be fire wrapped) / anchor closet flange -OK on L2 in wall & overhead DWV pending forthcoming DWV revision splice adding AAV's -OK on L2 in wall & overhead H2O downstream of 1-1/2" incoming solenoid valve minus water heater w/ associated piping & trap primer piping Note : existing VTR | FRANKM | FRANKM | | PTO | P | 7646861 |
HILL COMMERCIAL CONSTRUCTION, LLC | XBS | P | 04/11/2023 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: UL listing update | SHELLEY | SHELLEY | | XBS | P | 7712726 |
REEVES SPECIALTY SERVICES, INC. | XMS | T | 03/31/2023 | PAID (REC#1943970): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7703984 |
REEVES SPECIALTY SERVICES, INC. | XMS | T | 03/30/2023 | PAID (REC#1943343): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7702716 |
BULLETPROOF PLUMBING AND HEATING INC. | XPS | T | 03/29/2023 | PAID (REC#1943337): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 4 revisions: Adjusted sheet P-102. | SHANEN | SHANEN | | XPS | T | 7701770 |
HILL COMMERCIAL CONSTRUCTION, LLC | XBS | T | 03/24/2023 | PAID (REC#1942352): PLAN SPLICE FEE: $50 by: DANM for Construction: Clarification that common area electrical room wall indicated on drawing does not have existing fire rating | DANM | DANM | | XBS | T | 7698148 |