AVA'S CONSTRUCTION LLC | B= | C | 11/07/2023 | 2nd side pass through door in fill gyp attachment OK all units / building final OK | LONNYS | LONNYS | | B= | C | 7910625 |
AVA'S CONSTRUCTION LLC | BSP | P | 11/06/2023 | unit pass through door in fill framing and one side gyp attachment OK all units per UL U305 | LONNYS | LONNYS | | BSP | P | 7909473 |
AVA'S CONSTRUCTION LLC | B= | P | 10/31/2023 | still need to verify all door in fill framing and gyp covered prior to inspection for units 1203/1205 - 1208/1210 - 1233/1235 - 1238/1236 - 1245/1247 - 1239/1241 / rest or building final OK -- Schedule a new Building Final when above items are complete. | LONNYS | LONNYS | | B= | P | 7904116 |
AVA'S CONSTRUCTION LLC | BFR | P | 10/30/2023 | unit 1202 door in-fill framing and one side gyp attachment OK | LONNYS | LONNYS | | BFR | P | 7902929 |
AVA'S CONSTRUCTION LLC | BLA | C | 10/17/2023 | exterior door in fill lath OK | LONNYS | LONNYS | | BLA | C | 7889997 |
AVA'S CONSTRUCTION LLC | BLA | R | 10/13/2023 | exterior door lath infill inspection / inspection stopped / provide installation instructions for fiber mesh lath observed / non approved staples observed / needs complete reinspection once lath fastening is complete at install instructions are provided | LONNYS | LONNYS | | BLA | R | 7887703 |
AVA'S CONSTRUCTION LLC | BFR | R | 10/13/2023 | 1202 - door in fill framing -- framing needs to be full depth of existing CMU wall with door jamb removed - in fill wall will need to be fastened both sides | LONNYS | LONNYS | | BFR | R | 7887293 |
AVA'S CONSTRUCTION LLC | BSP | P | 10/06/2023 | Inspection for Gypsum and attachment at Level 01 West Wing Exterior side
Observed 5/8's Type X and attachment at 3 locations ok South door and 2 west side doors per plan in splice AD 2.101C | PAULP | PAULP | | BSP | P | 7880030 |
AVA'S CONSTRUCTION LLC | B= | R | 09/14/2023 | not ready for building final / reviewed accessible elements and remaining items with site rep | LONNYS | LONNYS | | B= | R | 7856290 |
AVA'S CONSTRUCTION LLC | BSP | P | 09/14/2023 | interior side of exterior door infill gyp attachment OK per notes entered for permit O25072 / still need to inspect gyp attachment on exterior side | LONNYS | LONNYS | | BSP | P | 7856193 |
AVA'S CONSTRUCTION LLC | BFR | P | 08/28/2023 | exterior door in fill framing OK all locations / still need to inspect gyp attachment when ready | LONNYS | LONNYS | | BFR | P | 7839341 |
AVA'S CONSTRUCTION LLC | BFR | R | 08/25/2023 | exterior door in fill framing to fire treated - observed no treated framing | LONNYS | LONNYS | | BFR | R | 7838015 |
AVA'S CONSTRUCTION LLC | B= | R | 07/21/2023 | (THIS IS IEBC LEVEL 2 ALTERATION). No inspection performed. Reviewed the following items with site rep Christian: complete BFR inspection for infilled doors between units, per Christian non-treated wood framing was utilized for infill of door between units and advised not allowed for IA type of construction and approved plans show CMU for infill of door. Please update and splice plans to reflect as built condition. | ERAMIREZ | ERAMIREZ | | B= | R | 7805237 |
AVA'S CONSTRUCTION LLC | BSP | P | 05/24/2023 | need to update project description, attach proper permits / site visit to review project status and as built conditions / need to update plans for as built condition / reviewed rated assemblies,required PPRBD inspections, V-A construction, and rated assembly continuity requirements | LONNYS | LONNYS | | BSP | P | 7753247 |
AVA'S CONSTRUCTION LLC | BSP | P | 05/24/2023 | need to update project description, attach proper permits / site visit to review project status and as built conditions / need to update plans for as built condition / reviewed rated assemblies,required PPRBD inspections, V-A construction, and rated assembly continuity requirements | LONNYS | LONNYS | | BSP | P | 7753248 |
AVA'S CONSTRUCTION LLC | BE | L | 03/30/2023 | Renewed online for Half Fee at Mar 30 2023 8:33AM (RECEIPT #: 1943233) | WEBSITE | WEBSITE | | BE | L | 7702428 |
EL PASO ELECTRIC, LLC. | E= | C | 07/18/2023 | rest of owner work / | BRIAN | BRIAN | | E= | C | 7801091 |
EL PASO ELECTRIC, LLC. | E= | P | 07/06/2023 | west wing 1st and 2nd floor units ( owner ) marked on plans / | BRIAN | BRIAN | | E= | P | 7792963 |
EL PASO ELECTRIC, LLC. | E= | P | 05/11/2023 | west wing--1st and 2nd floor units --see plans --ok / | BRIAN | BRIAN | | E= | P | 7792962 |
EL PASO ELECTRIC, LLC. | E= | P | 05/03/2023 | west wing 2nd floor units --see plans / | BRIAN | BRIAN | | E= | P | 7792961 |
EL PASO ELECTRIC, LLC. | E= | P | 04/19/2023 | marked on plans / | BRIAN | BRIAN | | E= | P | 7792955 |
EL PASO ELECTRIC, LLC. | ER | P | 04/19/2023 | units marked on plans --ok / | BRIAN | BRIAN | | ER | P | 7792966 |
EL PASO ELECTRIC, LLC. | E= | P | 04/17/2023 | 1st floor units---ok see plans / | BRIAN | BRIAN | | E= | P | 7792954 |
EL PASO ELECTRIC, LLC. | E= | P | 03/22/2023 | 1st floor units --see plans / | BRIAN | BRIAN | | E= | P | 7792953 |
EL PASO ELECTRIC, LLC. | E= | P | 03/14/2023 | 2nd floor units in center / see plans / | BRIAN | BRIAN | | E= | P | 7792952 |
EL PASO ELECTRIC, LLC. | E= | R | 03/03/2023 | owner done work not wired correctly , gfci's will not reset / in bathrooms , complete reinspect 2nd floor units / | BRIAN | BRIAN | | E= | R | 7792951 |
EL PASO ELECTRIC, LLC. | E= | P | 02/28/2023 | see plans / | BRIAN | BRIAN | | E= | P | 7792950 |
EL PASO ELECTRIC, LLC. | ER | P | 01/26/2023 | units on 1st and 2nd floor ---see plans / | BRIAN | BRIAN | | ER | P | 7645262 |
EL PASO ELECTRIC, LLC. | ER | P | 01/26/2023 | units on 1st and 2nd floor ---see plans / | BRIAN | BRIAN | | ER | P | 7792965 |
EL PASO ELECTRIC, LLC. | ER | P | 01/13/2023 | west tower --see plans / | BRIAN | BRIAN | | ER | P | 7792964 |
EL PASO ELECTRIC, LLC. | ER | P | 01/13/2023 | west tower --see plans / | BRIAN | BRIAN | | ER | P | 7638904 |
EL PASO ELECTRIC, LLC. | ER | P | 01/05/2023 | walls marked on plans / | MIGUEL | MIGUEL | | ER | P | 7638903 |
EL PASO ELECTRIC, LLC. | ER | P | 01/05/2023 | walls marked on plans / | MIGUEL | MIGUEL | | ER | P | 7792960 |
EL PASO ELECTRIC, LLC. | ER | R | 11/21/2022 | can not use mc cable on round plastic box listed for romex only / rest of the unit is ok / marked units on the plans 1st and 2nd floor / | BRIAN | BRIAN | | ER | R | 7792959 |
EL PASO ELECTRIC, LLC. | ER | R | 11/21/2022 | can not use mc cable on round plastic box listed for romex only / rest of the unit is ok / marked units on the plans 1st and 2nd floor / | BRIAN | BRIAN | | ER | R | 7638902 |
EL PASO ELECTRIC, LLC. | ER | P | 10/31/2022 | 1st and 2nd floor units see plans / phase 2 | BRIAN | BRIAN | | ER | P | 7638901 |
EL PASO ELECTRIC, LLC. | ER | P | 10/31/2022 | 1st and 2nd floor units see plans / phase 2 | BRIAN | BRIAN | | ER | P | 7792958 |
EL PASO ELECTRIC, LLC. | ER | P | 10/13/2022 | 2nd floor east side --see plans / units only / | BRIAN | BRIAN | | ER | P | 7792957 |
EL PASO ELECTRIC, LLC. | ER | P | 10/13/2022 | 2nd floor east side --see plans / units only / | BRIAN | BRIAN | | ER | P | 7638900 |
EL PASO ELECTRIC, LLC. | ER | P | 09/29/2022 | phase 2 / 1st floor units west wing see plans marked in yellow / | BRIAN | BRIAN | | ER | P | 7638899 |
EL PASO ELECTRIC, LLC. | ER | P | 09/29/2022 | phase 2 / 1st floor units west wing see plans marked in yellow / | BRIAN | BRIAN | | ER | P | 7792956 |
ALPHALETE MECHANICAL LLC | P= | C | 07/20/2023 | | CODYP | CODYP | | P= | C | 7803104 |
ALPHALETE MECHANICAL LLC | P= | P | 05/31/2023 | Need correction from unit 2202 NOTE/ Scope of work corrected/ Rest o.k. | CODYP | CODYP | | P= | P | 7792980 |
ALPHALETE MECHANICAL LLC | P= | P | 05/25/2023 | Correct scope of work, Still need to correct 2202, NOTE/ All other sinks on this permit o.k. | CODYP | CODYP | | P= | P | 7792979 |
ALPHALETE MECHANICAL LLC | P= | P | 05/23/2023 | Still need to correct 2202, NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7792978 |
ALPHALETE MECHANICAL LLC | P= | L | 04/21/2023 | Field canceled by contractor | CODYP | CODYP | | P= | L | 7792977 |
ALPHALETE MECHANICAL LLC | P= | P | 04/18/2023 | By final change scope to show 175 sinks, Counter too high in unit 2202 this is an accessible unit, Need to complete units 1138, and 2236 through 2250, NOTE/ Rest o.k. for final | CODYP | CODYP | | P= | P | 7792976 |
ALPHALETE MECHANICAL LLC | PTO | C | 04/11/2023 | | CODYP | CODYP | | PTO | C | 7792985 |
ALPHALETE MECHANICAL LLC | P= | P | 03/08/2023 | See notes from 3/7/23 | CODYP | CODYP | | P= | P | 7792975 |
ALPHALETE MECHANICAL LLC | P= | P | 02/28/2023 | Wrong permit called in needed to be on permit number O24152 | CODYP | CODYP | | P= | P | 7792972 |
ALPHALETE MECHANICAL LLC | PTO | R | 02/21/2023 | Wrong permit called in | CODYP | CODYP | | PTO | R | 7792984 |
ALPHALETE MECHANICAL LLC | P= | P | 02/17/2023 | Units 2200, 2201, 2202, 2203, 2204, 2205, 2207, and 2208 o.k. | CODYP | CODYP | | P= | P | 7792971 |
ALPHALETE MECHANICAL LLC | P= | P | 02/14/2023 | NOTE/ Units 1200, 1201, 1217, 1220, 1226, 1430 o.k. | CODYP | CODYP | | P= | P | 7792970 |
ALPHALETE MECHANICAL LLC | PTO | P | 02/14/2023 | Need PTO inspections for units 2236 through to 2250 and 1247, NOTE/ Units 1131, 1133, 1134, 1135, 1136, 1137, 1138, 1139, 2131, 2133, 2134, 2135, 2136, 2137, 2138, 2139 o.k. | CODYP | CODYP | | PTO | P | 7792983 |
ALPHALETE MECHANICAL LLC | PSP | P | 02/14/2023 | Note/ This inspection is to clean up the notes for inspection purpose these units have completed finals/ Units 2400-2433 o.k./ 1400-1433 o.k./ 1250-1226 o.k./ 1220-1200 o.k./ 2210-2230 o.k./ 2232-2235 o.k. | CODYP | CODYP | | PSP | P | 7792974 |
ALPHALETE MECHANICAL LLC | P= | P | 02/08/2023 | Units 2210, 2211, 2212, 2213, 2214, 2215, 2216, 2217, 2218, 2219, 2220, 2221, 2222, 2223, 2224, 2225, 2226, 2227, 2228, 2229, 2230, 2232, 2233, 2234, 2235 o.k. | CODYP | CODYP | | P= | P | 7792969 |
ALPHALETE MECHANICAL LLC | PTO | P | 02/08/2023 | Units 1236, 1237, 1238, 1239, 1240, 1241, 1242, 1243, 1244, 1245, 1246, 1248, 1249, 1250 o.k. | CODYP | CODYP | | PTO | P | 7792982 |
ALPHALETE MECHANICAL LLC | P= | P | 02/02/2023 | Note/ Units 1400 through to 1425, 1235 through to 1227, 1216 through to 1202 and units 1219 and 1218 o.k. | CODYP | CODYP | | P= | P | 7792968 |
ALPHALETE MECHANICAL LLC | P= | P | 02/01/2023 | Units 2400 through 2433 o.k. for final and 1429, 1428, 1427, and 1426 o.k. for final | CODYP | CODYP | | P= | P | 7792967 |
ALPHALETE MECHANICAL LLC | PTO | P | 02/01/2023 | Need 1236 through to 1250 and 2236 through to 2250 inspected still, NOTE/ Rest o.k. for PTO | CODYP | CODYP | | PTO | P | 7792981 |
ALPHALETE MECHANICAL LLC | PSP | P | 01/27/2023 | Consultation with plumbing contractor and building contractor regarding plumbing plans and permits, Discussed what's left on this permit and future inspections | CODYP | CODYP | | PSP | P | 7792973 |
AVA'S CONSTRUCTION LLC | XBS | T | 10/09/2023 | PAID (REC#1997851): PLAN SPLICE FEE: $50 by: DANM for Construction: Clarifying an ADA unit being marked as such on the Architectural and General Code plans. | DANM | DANM | | XBS | T | 7882455 |
AVA'S CONSTRUCTION LLC | XBS | T | 08/04/2023 | PAID (REC#1976203): PLAN SPLICE FEE: $50 by: DANM for Construction: Removing (closing off) some exterior doors that are not required for egress | DANM | DANM | | XBS | T | 7817352 |
AVA'S CONSTRUCTION LLC | XBS | T | 08/02/2023 | PAID (REC#1975356): PLAN SPLICE FEE: $50 by: DANM for Construction: Change infill wall construction between units from CMU construction to fire-retardant-treated wood with new listed assembly | DANM | DANM | | XBS | T | 7814831 |
AVA'S CONSTRUCTION LLC | XBS | T | 07/18/2023 | PAID (REC#1970718): PLAN SPLICE FEE: $50 by: DANM for Construction: Existing doors between units removed | DANM | DANM | | XBS | T | 7801564 |