BVB GENERAL CONTRACTORS LLC | B= | C | 06/26/2023 | All other required Final inspections are complete. (This is a computer generated result) | JASONL | JASONL | | B= | C | 7781811 |
BVB GENERAL CONTRACTORS LLC | B= | P | 06/26/2023 | Final OK pending the completion of outstanding inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: falconfire@falconfirepd.org or 495-4050). | JASONL | JASONL | | B= | P | 7781569 |
BVB GENERAL CONTRACTORS LLC | BSP | P | 06/26/2023 | verification of final corrections on file | JASONL | JASONL | | BSP | P | 7781566 |
BVB GENERAL CONTRACTORS LLC | B= | P | 06/22/2023 | Missing non absorbent surface within 2 feet of service sink in utility 131 per IBC 1210.2.2 / framing deficiencies from inspection on 04/11/2023 addressed in splice dated on 04/25/2023 / Complete outstanding inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: falconfire@falconfirepd.org or 495-4050), AIRTECH MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | JASONL | JASONL | | B= | P | 7779519 |
BVB GENERAL CONTRACTORS LLC | BSP | R | 06/06/2023 | documents uploaded to inspection request not required for building inspection | BRIANB | BRIANB | | BSP | R | 7763401 |
BVB GENERAL CONTRACTORS LLC | BFR | P | 04/19/2023 | observed demising wall framing / still need to address other corrections from previous frame inspection | BRIANB | BRIANB | | BFR | P | 7720654 |
BVB GENERAL CONTRACTORS LLC | BFR | P | 04/11/2023 | PARTIAL / missing wall framing for door 012 outside restrooms / missing wall framing for fire place in waiting 101 / missing framing for 2nd door at exam 107 and exam 106 / framing installed at hard lid areas not per design / unable to inspect demising wall framing - suite locked / observed other light gauge framing / need to complete other rough inspections | BRIANB | BRIANB | | BFR | P | 7713098 |
PINE VALLEY ELECTRIC, INC. | EP | C | 06/15/2023 | panel E 200 amp 4/w / panel D 70 amp 4/w both ok | CRAIG | CRAIG | | EP | C | 7772610 |
PINE VALLEY ELECTRIC, INC. | E= | C | 06/15/2023 | all 3 A/C' s ok | CRAIG | CRAIG | | E= | C | 7772600 |
PINE VALLEY ELECTRIC, INC. | ES | C | 05/26/2023 | Commercial Service: 200 amp 3 phase 120/208 commercial / ok to set meter / Suite # 110 | JOSEPH | JOSEPH | | ES | C | 7756038 |
PINE VALLEY ELECTRIC, INC. | ES | R | 05/23/2023 | Float neutral at exterior disconnect. / Finish wiring in top gutter. / Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / Notes: Rest of 200 amp 3 phase service good / This building has a service disconnect upstream / Still need to inspect interior sub panels. | JOSEPH | JOSEPH | | ES | R | 7752076 |
PINE VALLEY ELECTRIC, INC. | ER | P | 05/23/2023 | Drop ceilings good | JOSEPH | JOSEPH | | ER | P | 7752071 |
PINE VALLEY ELECTRIC, INC. | ES | P | 05/05/2023 | Commercial Service: Consultation only / Notes: 200 amp 4 w 120/240 volt service | JOSEPH | JOSEPH | | ES | P | 7736558 |
PINE VALLEY ELECTRIC, INC. | ER | P | 04/21/2023 | Hard lids in utility room. | JOSEPH | JOSEPH | | ER | P | 7723686 |
PINE VALLEY ELECTRIC, INC. | ER | P | 04/18/2023 | Perimeter walls / Hard lids in both bathrooms & reception area | JOSEPH | JOSEPH | | ER | P | 7719781 |
PINE VALLEY ELECTRIC, INC. | ER | P | 04/10/2023 | All walls except the perimeter walls. / Discussed accessibility requirements with contractor / | JOSEPH | JOSEPH | | ER | P | 7711679 |
AIRTECH MECHANICAL, INC. | H= | C | 06/23/2023 | REVISED TEST AND BALANCE REPORT RECEIVED. SEE IMAGES. MECHANICAL FINAL OK / | LIDO | LIDO | | H= | C | 7780352 |
AIRTECH MECHANICAL, INC. | H= | P | 06/23/2023 | Specification sheet for plastic on wall/ceiling in above ceiling plenum return (meets plenum rating) received. See images/ FINAL PENDING THE FOLLOWING: TEST AND BALANCE REPORT REVIEW - MISSING SUITE ADDRESS (110) ON REPORT / REST OK / | LIDO | LIDO | | H= | P | 7780270 |
AIRTECH MECHANICAL, INC. | H= | P | 06/22/2023 | FINAL PENDING: NEED TO REVIEW SPEC SHEET FOR PLASTIC INSTALLED ON CEILING AND WALL FOR PLENUM COMPLIANCE / NEED TO REVIEW TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7779721 |
AIRTECH MECHANICAL, INC. | H= | P | 06/16/2023 | Scavenger vent installed. See images / Dryer gas regulator capped / See notes dated 6/15/23 for items that still need addressed / | LIDO | LIDO | | H= | P | 7773953 |
AIRTECH MECHANICAL, INC. | H= | P | 06/15/2023 | FINAL PENDING: CAP MEDIUM PRESSURE GAS REGULATOR FOR DRYER OR CONNECT GAS TO DRYER / ALL MATERIAL IN ABOVE CEILING PLENUM RETURN MUST BE PLENUM RATED OR PROTECTED WITH APPROVED PLENUM RATED MATERIAL (includes furnace pvc vent and intake / furnace and AC pvc condensate pipes / plumbing pvc pipes)/ QUESTIONING IF PLASTIC ON CEILING AND WALLS IS PLENUM RATED CONTRACTOR TO PROVIDE SPECIFICATIONS FOR PLASTIC / NEED SCAVENGER EXHAUST DUCT COMPLETED (scavenger exhaust fan owner provided)/ NEED TEST AND BALANCE REPORT BY FINAL / | LIDO | LIDO | | H= | P | 7772784 |
AIRTECH MECHANICAL, INC. | HD | C | 06/15/2023 | DUCT ROUGH COMPLETE / | LIDO | LIDO | | HD | C | 7772776 |
AIRTECH MECHANICAL, INC. | HC | C | 05/26/2023 | OK TO RELEASE 2LB METER FOR SUITE 110 / | LIDO | LIDO | | HC | C | 7756288 |
AIRTECH MECHANICAL, INC. | HI | C | 05/26/2023 | REGULATORS WITH VENT LIMITERS INSTALLED ABOVE CEILING OK / STILL NEED REGULATOR AND FINAL CONNECTION TO DRYER / 10LB TEST OK / ALL CORRECTIONS MADE / FINAL CONNECTIONS AND REGULATORS TO ALL FURNACES OK /
| LIDO | LIDO | | HI | C | 7756287 |
AIRTECH MECHANICAL, INC. | HD | P | 05/25/2023 | ALL MATERIAL IN ABOVE CEILING PLENUM RETURN MUST BE PLENUM RATED OR PROTECTED WITH APPROVED PLENUM RATED MATERIAL (includes furnace pvc vent and intake / furnace and AC pvc condensate pipes / plumbing pvc pipes)/ QUESTIONING IF PLASTIC ON CEILING AND WALLS IS PLENUM RATED CONTRACTOR TO PROVIDE SPECIFICATIONS FOR PLASTIC / NEED SCAVENGER EXHAUST DUCT COMPLETED (scavenger exhaust fan owner provided)/ EF-1 - MISSING MOTORIZED DAMPER. NEED TO PROPERLY SEAL LOUVER IN EXTERIOR WALL / ROOM 130- MISSING RETURN AIR LAY IN GRILL / ROOM 125- MISSING 1 EXHAUST / ROOM 131 - 15" X 15" CG2 GRILL INSTALLED IN HALL BY BATHROOM 110 INSTEAD OF ROOM 131. MUST BE INSTALLED PER PLAN / NEED ALL THERMOSTATS / NEED TEST AND BALANCE REPORT BY FINAL /
| LIDO | LIDO | | HD | P | 7754861 |
AIRTECH MECHANICAL, INC. | HWP | P | 05/25/2023 | NEED FURNACE AND AC CONDENSATE DISPOSAL TERMINATIONS COMPLETED/ PVC PIPING IS NOT PLENUM RATED AND WILL NEED TO BE PROTECTED WITH PLENUM RATED MATERIAL / CONDENSATE PIPE INSTALL OK / | LIDO | LIDO | | HWP | P | 7754849 |
AIRTECH MECHANICAL, INC. | HRP | C | 05/25/2023 | ALL REFRIGERATION PIPING OK / FINAL CONNECTIONS TO COILS AND CONDENSERS OK / | LIDO | LIDO | | HRP | C | 7754831 |
AIRTECH MECHANICAL, INC. | HV | P | 05/25/2023 | FURNACE GF-1, 2 AND 3 VENT / INTAKE: NEED TO SEAL INTAKE PIPING AT CONNECTION TO FURNACE PER MANUFACTURER / PVC IS NOT PLENUM RATED. WILL NEED TO BE PROTECTED WITH PLENUM RATED MATERIAL / TERMINATIONS OK /
| LIDO | LIDO | | HV | P | 7754828 |
AIRTECH MECHANICAL, INC. | HI | P | 05/25/2023 | NEED TO REVIEW REGULATORS WITH VENT LIMITERS INSTALL IN PLENUM RETURN. WILL UPDATE NOTES AFTER / LOW TEST / NEED PROPER SUPPORT FOR 1" LINE TO GF-3 & DRYER IN CEILING /
| LIDO | LIDO | | HI | P | 7754822 |
AIRTECH MECHANICAL, INC. | HI | P | 05/22/2023 | CONTRACTOR-- NEED 10 lb. TEST ON 30 lb. GAGE, NEED PROPER SUPPORT FOR 1" LINE TO GF-3 & DRYER IN CEILING. Note / All gas piping installed per plans (Plan Splice M-102: 5/16/23, MEDIUM PRESSURE SYSTEM, 2 lb. LETTER IS ON FILE: SEE ADDRESS ALERTS). | PAULO | PAULO | | HI | P | 7751290 |
AIRTECH MECHANICAL, INC. | HI | P | 04/21/2023 | GAS PIPING IS NOT INSTALLED PER PLAN. INSTALL PER PLAN. WILL NEED FULL RE-INSPECTION / | LIDO | LIDO | | HI | P | 7724122 |
AIRTECH MECHANICAL, INC. | HD | P | 03/24/2023 | NEED GAS CONTRACTOR ATTACHED TO PERMIT / GF-1, 2 AND 3 SUPPLY, RETURN AND OUTSIDE AIR DUCT ROUGH OK. OK TO INSULATE SUPPLY BRANCH LINES / DRYER EXHAUST DUCT ROUGH OK / EF-1 DUCT ROUGH OK / | LIDO | LIDO | | HD | P | 7697684 |
THRIVING CONSTRUCTORS CORP | P= | C | 06/19/2023 | OK | ADRIANM | ADRIANM | | P= | C | 7775405 |
THRIVING CONSTRUCTORS CORP | PTO | C | 06/19/2023 | Splice in plan images | ADRIANM | ADRIANM | | PTO | C | 7775385 |
THRIVING CONSTRUCTORS CORP | P= | L | 06/16/2023 | Cancelled per contractor | ADRIANM | ADRIANM | | P= | L | 7774382 |
THRIVING CONSTRUCTORS CORP | PTO | P | 04/21/2023 | Pending plans splice for locations of additional VTR's / Rest OK | ADRIANM | ADRIANM | | PTO | P | 7723630 |
THRIVING CONSTRUCTORS CORP | PTO | P | 04/11/2023 | Secure closet flanges / Need to see isolation from dissimilar metals and copper piping in various locations / Need plans splice for locations of additional VTR's / Pending insulation overhead H2O NOTE: DOG WASH FLOOR DRAINS VENT TO AN EXISTING VTR / 4 VTR TOTAL / WATER HEATER INSTALL AT FINAL | ADRIANM | ADRIANM | | PTO | P | 7712751 |
THRIVING CONSTRUCTORS CORP | PB | P | 03/14/2023 | Pending engineer's letter for trap guards in lieu of trap primers / Rest OK /// NOTE: SPOKE WITH CONTRACTOR REGARDING MATERIALS AND REQUIREMENTS FOR PIPING IN RETURN AIR PLENUM | ADRIANM | ADRIANM | | PB | P | 7686723 |
THRIVING CONSTRUCTORS CORP | XPS | P | 05/18/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 4 revisions: Adjusted sheet P-101 and P-701. | SHANEN | SHANEN | | XPS | P | 7747534 |
AIRTECH MECHANICAL, INC. | XMS | T | 05/16/2023 | PAID (REC#1955639): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | T | 7745077 |
BVB GENERAL CONTRACTORS LLC | XBS | T | 04/25/2023 | PAID (REC#1955512): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Remove 2nd door at 106 -107 / Remove fireplace at waiting. | JUSTINL | JUSTINL | | XBS | T | 7726458 |